Profileimage by george fawzy ASSt C.E. at Amer Group from cairo

george fawzy

available

Last update: 23.12.2014

ASSt C.E. at Amer Group

Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Native or Bilingual)

Skills

AutoCAD, Project Planning, Project Management, Quality Management, Engineering, Microsoft Excel, MS Project, 3D Modeling, Unigraphics, Workshop drawing, CNC Machine, CAD/CAM Software, Purchasing, Preventive Maintenance, Program Management, Hotels, Customer Satisfaction, Leadership, Construction, Pre-opening, Management, Resorts, Cost Control

Project history

Amer Group
ASSt C.E.
07.2012 - today
As a assistant chief Engineer – Mechanical
During my work I passed with the department through the following projects & targets ….
• Recover a lot of the construction problems .
o Emergency lighting installation
o Master key plan design & installation .
o Total snagging for the entire site.
o Install new sensors for electric saving in building corridors .
• Engineering Filling System
? Water quality log books
? As built drawings – catalogs
? Daily Checklist / Log books “ Pluming –Electric - Air Condition – Equipment ”
? Preventive Maintenance Checklists
• Work with saving cost programs in Electricity for public area
• Go in deep in all of the Hotel Projects during the low season periods
o Total electric maintenance for street lighting
o Handrails renewing in all the site.
• Engineering Department operation
o Managing the operation tasks through the supervisors & technician
o Modifications calculations
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Daily report preparation .
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
? Putting the aim to have loyal Staff
? Deal with the Last Period in Egypt with Stable Engineering Department
Real Estate
5001-10,000 employees

Carols Hotel
Asst. C. E.
08.2010 - 07.2012
As a assistant chief Engineer "acting chief Engineer "
During my work I passed with the department through the following projects & targets ….
• Prepare total renew / maintenance plan for all the hotel to get the engineering systems matching with the Hotels standard and cover a lot of construction problems
o Fire alarm / Fighting system
o Air condition system “Chiller – AHUs – Split Units - Hoods ”
o Kitchen Equipments
o Electric Distribution system “ Medium – Transformers – Earthing - …”
o Sewage system “sewage plant – sewage man halls ”
o Domestic Water system
o Hot water system “Hot water Boiler – Electric heaters – calorifiers ”
o Swimming Pools “pumps – filters – heat exchangers ”
• Engineering Filling System
o Total Engineering Filling System Creation
? Water quality log books / Leganila disinfection protocol filing
? Elevators –kitchen equipments – data and service visits
? As built drawings – catalogs
? Travel life environmental file
? Fax in /out - …..etc
o Prepare & implement total maintenance checklists
? Daily Checklist / Log books “ Pluming –Electric - Air Condition – Equipment ”
? Preventive Maintenance Checklists
• Work with saving cost programs “Water – Electricity – etc…”
• Working with external auditors
o Hygiene consultant “Crystal Co.”
o Environment Consultant “Travel Life ”
• Go in deep in all of the Hotel Projects during the low season periods
• Managing the Engineering Department
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
? Putting the aim to have loyal Staff
? Deal with the Last Period in Egypt with Stable Engineering Department
Design


InterContinental Hotels Group
Maintenance Engineer
08.2008 - 08.2010
"The Palace Hotel" As a Maintenance Engineer
During me work I get a lot of experience in a lot of fields & shared in a lot of projects ….
• Prepare a preventive Maintenance Plan for a very complicated site, according To IHG standard.
• Created all the maintenance check lists “daily checks – weekly –monthly-3 monthly - …. etc” check lists for all site equipments , follow up the PM Implementation.
• Follow up all the utilities consumption – according to IHG Standard –on daily basis-.
• Prepare & Work with water quality book according to IHG requirements.
• Create escape plane –room door escape plan- for the hotel.
• Work with all electromechanical & architecture drawing.
• Work with the Ken Fix Program.
• Work with saving cost programs “water – electricity ….”.
• Work with the electric earth protection in the rooms & equipments.
• Working with hygiene consultant “Crystal Co.”
• Working with water Quality consultant “House Man Co.”
• Working according to FLS requirements.
Leisure, Travel & Tourism
10,001+ employees

Sun international port Ghalib
Shift Engineer
12.2007 - 07.2008
• Shift Followup
• Created all the follow-up check lists
• Follow up all the utilities consumption .
• Work with all electromechanical & architecture drawing.
• Work with the Ken Fix Program.
• Working with hygiene consultant “Crystal Co.”
Design


ESPI
Mechanical Design Engineer
06.2006 - 11.2007
"Mould making, jigs, medical lines, spare parts"
• Design a plastic mold "Simple molds"
• Design sheet metal dies "Cutting Dies"
• Spare parts Design
• Medical lines Requirement Design
• Reverse Engineering
• Using CAD-CAM-CAE systems " Unigraphics NX4.0"
• Create company Introduction presentation
• Case Study for projects "design view"
Real Estate
11-50 employees

SIROMISR
CNC engineer "Wire & Milling M/C".
12.2004 - 08.2006
* Prepare CAD file in 3D
* Prepare CAM file in Txt format
* transfer the file into the machine
* Setup the W.P as per the file setting
* Make the machine maintenance
* mold making & repairing
Design

Local Availability

Only available in these countries: Egypt
im available for your work
Profileimage by george fawzy ASSt C.E. at Amer Group from cairo ASSt C.E. at Amer Group
Register