SAP SCM & Supply Chain Management Program Manager

Graduation: MBA in Supply Chain Management & IT
Hourly-/Daily rates: show
Languages: English (Full Professional) | Hindi (Native or Bilingual)

Attachments

vellanki-sriharsha-resume-v1.0.pdf

Skills

Supply Chain Management

SAP EWM
SAP TM
SAP SCM

Warehousing 

Transportation 

Carrier 

LSP

Project history

Project: Transformation of Spare Parts Supply Chain Client: Bajaj Auto a Leading 2&3 wheeler Manufacturer

Key Project Highlights
  • Largest Spare Parts Warehouse in India with 3,60,000 sqft area
  • Biggest Pick to Light (PTL) implementation with 1640 lights
  • Wide SKU Base with around 20,000 live parts catered to dealers & distributors across globe
  • Multiple Stakeholders to be managed – Bajaj Auto’s IT, Business, Ops, Engineering teams, Bastian Team

Project Specific Key Activities
  • Lead a team of 6-8 consultants of diversified skill sets and experience
  • Understand characteristics of Part based on 2-D classification (ABC, FMS Analyses) & dimensions
  • Identify suitable storage & automation systems, considering throughput, space, future growth & peaks
  • Formulate product placement and storage strategy considering product category and storage systems
  • Suggest DOCs based on the product category, average throughput and Evaluate the life of Warehouse
  • Develop methods to identify root causes for lower fill rates and address them for better serviceability
  • Implement Batch, Cluster and Order Picking Strategies based on Product Category & Order Quantity

Project Specific Key Activities
  • Devise order based & automatic fixed bin replenishment strategies along with negative available stock
  • Implement Automation systems like – SBL, PTL, High Speed Sorting conveyor systems
  • Enable the re-engineered processes and automation systems through SAP EWM and Bastian WCS systems
  • Design interfaces between EWM-WCS systems through SAP – PI required to meet business requirements
  • Use standard SAP EWM functionalities to reduce the Total Cost of Ownership of the solution
  • Manage daily operations post Go – Live for seamless transition and ensuring the attainment of KPIs set
  • Devise a plan for migration of stock from old warehouse to new warehouse

Project Achievements
  • 50% fall in WIP inventory by developing wave strategies basis Transporter & Business Units (2/3 wheeler)
  • 32% improvement in storage space utilization through stock merging & enabling add to existing process 
  • 23% improvement in Fill Rate from 65% to 88% and reduction in average DOC from 72 Days to 54 Days
  • 6 folds increase in the throughput of the warehouse from the original 2,200 lines to 13,500 lines per day

Project: BPR & Simplification of IT LandscapeClient: Asian Paints an Indian Paint Industry Leader
Key Project Highlights
  • Implementation of solution at Two Physically distant Warehouses (BSR & DC) considering the GST era
  • Double Deep ASRS with 5040 bins catering to around 97% of overall throughput, becoming a bottleneck
  • Mandate to eliminate WMS+WCS based two tier system landscape & replace it with single EWM system

Project Specific Key Activities
  • Lead an amazing team of 10-12 consultants of diversified skill sets and experience
  • Understand current processes, baseline ASRS’s & warehouse’s productivity and throughput
  • Transform the IT landscape and make the system and processes GST ready
  • Decentralize warehouse processes from ECC & ensuring seamless material flow between BSR & FG DC
  • Finalize product placement based product characteristics & effort of SRM to access each bin in ASRS
  • Design optimal putaway & re – arrangement strategies for ASRS for improved storage efficiency
  • De-bottleneck ASRS by proposing & implementing Inbound Driven Opportunistic Cross Dock
  • Design optimal Re-Org strategy to reduce the number of Re-Orgs and thus improve ASRS throughput
  • Develop picking strategies basis order quantity, product characteristics/location, effort, need for reorg etc
  • Devise Interleaving Strategy basis distance optimality & delivery priority for improved SRM throughput
  • Use of EWM MFS to control the ASRS for better stability. reliability and reduced latency
  • Design ASRS Emulator system for fast track, low cost testing
  • Instrumental in actual Hardware Testing with ASRS system during 3rd Shift
  • Ensured seamless transition to the Re-engineered processes with thorough testing, training
  • Fortify future Kaizens/Re-engineering projects with detailed documentation of process & system design

Project Achievements
  • 13% improvement in ASRS throughput with improved picking, putaway, re-org and interleaving strategies
  • 17% reduction in the load on ASRS using inter & intraday opportunistic cross docking
  • 18% reduction in number of Re-orgs as a percent of number of pick tasks  
  • Zero Business disruptions due to IT/Process issues post Go – Live

Pre-Sales: Proposal of Solution & Implementation Approach Client: DHL IPR an IoT based driver relay model carrier
Solution Highlights
  • Enlist happy and exceptional scenarios for holistic process & solution design
  • Design Order Capturing process (along with E-Way bill Part - A) using a SAP Fiori based application
  • Develop order planning algorithms to identify best Truck and Drivers considering various parameters
  • Identify & Design interfaces with IoT systems (T4U) to monitor and track execution
  • Design an Android based Driver App & its interfaces with other systems (SAP TM, SAP EM, GIS, T4U)

Local Availability

Only available in these countries: India

Other

  • An Award Wining Supply Chain, Technology & Program Management Professional with 40 months of experience in leading Transformations for Companies like – DHL SmarTrucking, Asian Paints, Bajaj Auto
  • Expertise in SAP EWM, SAP TM, Business Process Re-engineering, Program Management, Team & Stakeholder Management, Warehousing, Logistics, Procurement
  • Worked closely with CXOs, VPs of leading firms on projects aimed at improving the Service Levels, Operational Efficiencies & Throughputs, Reducing Costs impacting the Bottomlines & Customer Service
  • Currenlty leading the ERP Implementation for DHL SmarTrucking to enable the business with an end to end integrated system covering processes from Customer Onboarding, Customer Quotation Response, Contract & Order Management, Trip Planning, Execution, Invoicing and Fleet Management
  • Re-engineer Asian Paints warehouse by De-Bottlenecking the ASRS & Improving overall throughput
  • Improved the order fill rate of Bajaj Auto Spares Warehouse by 23% & increased the throughput by 6 fold
  • Instrumental in creating Solution & Commercial proposals for wide range of projects across industries
  • An Alumnus of NITIE, Mumbai (MBA in Supply Chain Management) & NIT, Surat (Engineering) both being India's top institutes of National Importance
  • Six Sigma Green Belt holder