Architect, BIM Manager
Keywords
Skills
Programming, BIMImplementation, Revit, AutoCAD, Archicad, Rhino, Sketchup, ParametricDesignandVisualProgramming, Dynamo, Grasshopper, Visual Studio.net C# Structure, RevitStructure, Tekla, ProjectClassificationQuantification, Navisw ork, LandscapeTopography, AutodeskInfraWorks, ARCGIS, Render, 3DSMax V-Ray, Photoshop, Office, Word, Excel, Publisher, C#, cloud, DWG, 3D modelling, CAD files, CAD
Project history
07/2018
-
01/2020
Mashhad Mall, Iran (1500 m2 )
I. Mashhad Mall Medical Center Design Include :
* Emergency Medical Center
* Labs
* Dental Clinic
* Beauty and Dermatology Clinic
* Doctors' Center
II. Using comprehensive expertise, I design, implement and manage physical, technical, and operational in all facets of
BIM administration, mobile and cloud technologies, and project management systems firm wide.
III. Manage a team of includes BIM modeler, architect and MEP Engineers .
IV. Coordination between architecture and other disciplines.
V. Model conflict detection and model correction program.
VI. Providing 2D documents output (.DWG) according:
* Schematic Design Deliverables List
* Design Development Documents Deliverables List
* Construction Documents Deliverables List
I. Mashhad Mall Medical Center Design Include :
* Emergency Medical Center
* Labs
* Dental Clinic
* Beauty and Dermatology Clinic
* Doctors' Center
II. Using comprehensive expertise, I design, implement and manage physical, technical, and operational in all facets of
BIM administration, mobile and cloud technologies, and project management systems firm wide.
III. Manage a team of includes BIM modeler, architect and MEP Engineers .
IV. Coordination between architecture and other disciplines.
V. Model conflict detection and model correction program.
VI. Providing 2D documents output (.DWG) according:
* Schematic Design Deliverables List
* Design Development Documents Deliverables List
* Construction Documents Deliverables List
07/2018
-
12/2018
Architect, BIM Manager
Golestan Palace Collection
Golestan Palace Collection, Tehran, Iran (6000 m2 )
I. Modeling and simulating the Almas hall space - Chadorkhaneh Mansion - Badgir Mansion - North Motor Home and
Greenhouse Engineers under the BIM Method by collecting surveys and preparing a model for the Belt and modeling
the proposed installation for the air conditioner system. The operation time is set in the warm seasons
II. Manage of Team of 4 people
III. Preparing an as built model using mapping data .
IV. Proposal preparation for air conditioning system during set-up during hot seasons
V. Coordination between architecture and other disciplines
VI. Model conflict detection and model correction program
I. Modeling and simulating the Almas hall space - Chadorkhaneh Mansion - Badgir Mansion - North Motor Home and
Greenhouse Engineers under the BIM Method by collecting surveys and preparing a model for the Belt and modeling
the proposed installation for the air conditioner system. The operation time is set in the warm seasons
II. Manage of Team of 4 people
III. Preparing an as built model using mapping data .
IV. Proposal preparation for air conditioning system during set-up during hot seasons
V. Coordination between architecture and other disciplines
VI. Model conflict detection and model correction program
11/2016
-
03/2018
BIM Manager
Bam group
Bam group, Tehran, Iran (200,000 m2 )
Projects such as (Araz Hotel, Niyayesh Mall, fereshterh Residential &...).
I. Using comprehensive expertise, I design, implement and manage physical, technical, and operational in all facets
of BIM administration, mobile and cloud technologies, and project management systems firm wide.
II. Manage a team of includes BIM modeler, architect and MEP Engineers.
III. Collaborated in designing: CCTV, audio visual, civil, structural, and architectural systems.
IV. into implementing and adapting BIM/VDC execution plan.
V. Coordinated with structure consultant and Executive Teams the construction life cycle, BIM files transmissions,
captured design changes and communicate changes to the different
VI. construction teams.
VII. Ensure general contractor's personnel followed BIM execution plan.
VIII. Model conflict detection and model correction program.
IX. Mentor and direct BIM production staff, job site personnel and general contractor's personnel
X. UNIFORMAT II Classification of Building Elements and Integrate 3D modelling into 4D, 5D simulation of the
construction schedule to improve field performance.
XI. Supervise BIM technicians, and job site personnel on large scale projects into implementing and adapting
BIM/VDC standards and execution plan.
XII. Clash detection and Organize weekly BIM coordination meetings and create clash reports and resolution actions
across the different industry sectors to ensure the successful completion of the project.
XIII. Provide information related to site plans and interior/exterior of buildings in an accurate, easy to
understand 3D parametric format, and help demonstrate a better understanding of the necessary sequencing for
construction.
XIV. Define generic and shared parameters for creating custom families.
XV. Negotiated BIM L.O.D Specification Part II terms with all Clients.
XVI. Providing 2D documents output (.DWG) according:
* Schematic Design Deliverables List
* Design Development Documents Deliverables List
* Construction Documents Deliverables List
XVII. Manage and organize CAD files in engineering server, work with sales, manufacturing, purchasing to match
designs with manufacturing capabilities.
Projects such as (Araz Hotel, Niyayesh Mall, fereshterh Residential &...).
I. Using comprehensive expertise, I design, implement and manage physical, technical, and operational in all facets
of BIM administration, mobile and cloud technologies, and project management systems firm wide.
II. Manage a team of includes BIM modeler, architect and MEP Engineers.
III. Collaborated in designing: CCTV, audio visual, civil, structural, and architectural systems.
IV. into implementing and adapting BIM/VDC execution plan.
V. Coordinated with structure consultant and Executive Teams the construction life cycle, BIM files transmissions,
captured design changes and communicate changes to the different
VI. construction teams.
VII. Ensure general contractor's personnel followed BIM execution plan.
VIII. Model conflict detection and model correction program.
IX. Mentor and direct BIM production staff, job site personnel and general contractor's personnel
X. UNIFORMAT II Classification of Building Elements and Integrate 3D modelling into 4D, 5D simulation of the
construction schedule to improve field performance.
XI. Supervise BIM technicians, and job site personnel on large scale projects into implementing and adapting
BIM/VDC standards and execution plan.
XII. Clash detection and Organize weekly BIM coordination meetings and create clash reports and resolution actions
across the different industry sectors to ensure the successful completion of the project.
XIII. Provide information related to site plans and interior/exterior of buildings in an accurate, easy to
understand 3D parametric format, and help demonstrate a better understanding of the necessary sequencing for
construction.
XIV. Define generic and shared parameters for creating custom families.
XV. Negotiated BIM L.O.D Specification Part II terms with all Clients.
XVI. Providing 2D documents output (.DWG) according:
* Schematic Design Deliverables List
* Design Development Documents Deliverables List
* Construction Documents Deliverables List
XVII. Manage and organize CAD files in engineering server, work with sales, manufacturing, purchasing to match
designs with manufacturing capabilities.
04/2013
-
11/2016
Architect, BIM Modeler
Rose Mall
Rose Mall, Tehran, Iran (200,000 m2 )
I. Member of Architectural Technical Team.
II. Design and BIM supervision for project development.
III. Coordinated with structure consultant and Executive Teams the construction life cycle, BIM files transmissions,
captured design changes and communicate changes to the different construction teams.
IV. Model conflict detection and model correction program.
V. Controlling and adapting between architectural and structural design and preparing Shop Drawing documents.
VI. Parametric Object / Families creation, customized according to projects requirements.
I. Member of Architectural Technical Team.
II. Design and BIM supervision for project development.
III. Coordinated with structure consultant and Executive Teams the construction life cycle, BIM files transmissions,
captured design changes and communicate changes to the different construction teams.
IV. Model conflict detection and model correction program.
V. Controlling and adapting between architectural and structural design and preparing Shop Drawing documents.
VI. Parametric Object / Families creation, customized according to projects requirements.
04/2016
-
11/2016
Technical Director
Ice rink, Iran Mall
Ice rink, Iran Mall, Tehran, Iran (7500 m2 )
Design, implement and manage physical, technical, and operational in all facets of BIM administration,
Manage a team of includes BIM modeler, architect and MEP Engineers.
Model conflict detection and model correction program.
Design, implement and manage physical, technical, and operational in all facets of BIM administration,
Manage a team of includes BIM modeler, architect and MEP Engineers.
Model conflict detection and model correction program.
04/2012
-
11/2013
Technical Director, BIM Modeler
Sazehyaran
Sazehyaran, Tehran, Iran
I. Manage of Team of 4 people in Atelier Architecture .
II. Architectural design of projects such as 'Kamranieh tower'/ office and Shopping Center in Tehran, 'Fadak Complex'/
mixed use in Tehran, 'Farhang'/residential complex, with Revit.
III. Created Topography model from survey data of different projects such as ''Kamranieh tower'
I. Manage of Team of 4 people in Atelier Architecture .
II. Architectural design of projects such as 'Kamranieh tower'/ office and Shopping Center in Tehran, 'Fadak Complex'/
mixed use in Tehran, 'Farhang'/residential complex, with Revit.
III. Created Topography model from survey data of different projects such as ''Kamranieh tower'
04/2011
-
03/2012
Technical Director, BIM Modeler
Parseland
Parseland, Tehran, Iran
I. Manage of Team of 4 people in Atelier Architecture .
II. Design of first modern Amusement park in Iran with Revit.
III. Developed & complete Geometric model by Revit Architectural models, CAD drawings and project documents for
Parseland projects.
I. Manage of Team of 4 people in Atelier Architecture .
II. Design of first modern Amusement park in Iran with Revit.
III. Developed & complete Geometric model by Revit Architectural models, CAD drawings and project documents for
Parseland projects.
02/2009
-
03/2011
Technical Director, BIM Manager
Moco
Moco, Tehran, Iran
I. Manage of Team of 3 people in Atelier Architecture .
II. Design Auditorium Hall and Conference Rooms.
III. Developed & complete Parametric model by Revit architectural models, CAD drawings and Project
IV. documents for different projects such as Razi amphitheater hall in Milad tower Complex.
I. Manage of Team of 3 people in Atelier Architecture .
II. Design Auditorium Hall and Conference Rooms.
III. Developed & complete Parametric model by Revit architectural models, CAD drawings and Project
IV. documents for different projects such as Razi amphitheater hall in Milad tower Complex.
Local Availability
Only available in these countries:
Turkey