Profileimage by Ghada Hamza Testmanager, Prozessmanager, Agile Coach, Projektkoordination, Incident- und Problemmanagement from Augsburg

Ghada Hamza

not available until 09/01/2023
Contact

Last update: 24.09.2021

Test manager, process manager, agile coach, project coordination, incident and problem management

Graduation: Dipl.-Ing Electrical Engineering University
Hourly-/Daily rates: show
verhandelbar für Remote-Projekte
Languages: Arabic (Native or Bilingual) | German (Full Professional) | English (Full Professional) | French (Full Professional)

Keywords

Jira & Confluence Test Manager Change Managament Process Manager process improvement Agile & Scrum Agile (Scrum) und klassische Softwareentwicklung Agile and Waterfall Methodology HP ALM ISTQB Test Manager Problem Management

Skills

Certificates
ISTQB® Certified Agile Tester (2016)
ISTQB® Advanced Level Certified Test manager (2017)
ECU Test® Advanced Level (2019)
Blitz-3® Electrical Specialist for Development and Production of Electric Vehicles (2019)

Tools
Doors: Requirements Management
Confluence
Enterprise architecture (EA): SysML
Jira: Agile project management
HP-ALM / AQUA: Test Management

Project history

05/2020 - Present
Process- and Test manager
Nürnberger Versicherung (1000-5000 employees)
Insurance
  • Accompanying the digitalisation of business processes through all phases in coordination with the specialists, programme management, project management and the interfaces according to a safe-agile approach.
  • Accompanying the interfaces in the analysis, optimisation and implementation of the processes according to agile thinking
  • Responsible for the implementation of central IT process management
  • Responsible for the implementation of and compliance with the requirements management process to ensure a parallel, overarching implementation plan between interfaces and the core product according to the release plan
  • Optimisation of the overall release management process
  • Optimisation of the overall defect management process
  • Optimisation and monitoring of the test management process for the overall system
  • Test status reporting and test progress monitoring for the overall system

01/2019 - 04/2020
Test manager
FEV Europe (1000-5000 employees)
Automotive and vehicle construction
  • Planning, coordination and agreement for test case creation, implementation and automation
  • Status monitoring of test automation implementation and defect management
  • Test bench control - problem reporting and monitoring
  • Coordination with I-level control (release management)
  • Test status reporting

01/2018 - 12/2018
Test manager
Daimler AG (5000-10.000 employees)
Automotive and vehicle construction
  • Planning and control of test execution
  • Test review 
  • Defect management
  • Test status reporting

05/2015 - 12/2017
Test manager, Defect manager
Commerzbank (5000-10.000 employees)
Banks and financial services
  • Requirements analysis and requirements management
  • Planning and control of test execution
  • Defect management
  • Test status reporting
  • Project coordination between interfaces and the core product

01/2013 - 04/2015
Test analyst, requirements management
Audi AG (5000-10.000 employees)
Automotive and vehicle construction
  • Requirements management and system architecture (SysML)
  • Test design and execution

Time and spatial flexibility

10-20% Willingness to travel - Bavaria

Availability D-A-CH Region
 Austria (100% Remote)
 Switzerland (100% Remote)

Availability International
 Yes (100% Remote)

Contact form

Contact details