Profileimage by ReinhardHarald Kahler Dipl. Ing ( TU ) für Energie-Anlagen-Technik ( EAT), Commissioning Ingenieur Dampfsysteme from Bocholt

Reinhard, Harald Kahler

available

Last update: 03.07.2023

Graduate Engineer ( TU ) for Power System Engineering

Company: REKA - Commissioning Sevice & Solutions
Graduation: Graduate Engineer ( TU )
Hourly-/Daily rates: show
Languages: German (Native or Bilingual) | English (Limited professional) | Russian (Limited professional)

Skills

2013 - Managing Director Reka Commissioning Services & Solutions Ltd., Commissioning Manager, Commissioning Engineer for power plant equipment, steam generators and waste heat boilers of different firing in industrial and chemical plants, steel plants, water treatment plants, district heating systems, thermal utilization of biomass, waste heat plants, use and thermal conversion of geothermal etc., optimization of steam and hot water systems, advice and training

2012 - Freelancer and self-managing director of Reka Commissioning, Commissioning Engineer of cogeneration plants with different furnaces, water treatment plants, waste heat recovery systems, district heating pipe systems, energy conversion systems, etc., worldwide use

2007 - 2011 Senior Commissioning Engineer \"OSCHATZ GmbH\" worldwide, instructor and coach for young engineers use

2005 - 2007 Engineer for rationalization and automation, production manager \"Rehage GmbH\", Wuppertal, Germany

2003 - 2005 Fleet Manager Operations \"Nick & Eichfeld GmbH\", Wuppertal, Germany

2000 - 2002 International Chauffeur - Europe, international freight forwarders VOS and Ewald, Holland and \"Nick & gauge field GmbH\", Wuppertal, Germany

Since 1991 - part time freelance engineer - \"Engineering Service for boilers and heating systems\" using different fuels (coal, lignite, biomass) and services.

1991 - 1999 Co-owner of an agricultural market

1988 - 1990 Heating plant manager at VEB rubber works Ballenstedt, rubber Combine Walter Hausen / Thür., DDR / DE, brown coal operation, Schwingschubrostfeuerung, 125 MA,

1986 - 1988 Chief mechanic, head of maintenance / power engineers in the VEB Ballenstedt delicatessen, meat-Halle, East Germany / DE, application of district heating

1984 - 1986 Project engineer for work and production process - design, main power engineers in the VEB gauges works Quedlinburg, East Germany / DE

1982 - 1984 Responsible Engineer for steam generation, distribution and - application and media in the VEB ironworks Thale,DDR / DE, lecturer for the boiler operator training at the Academy of operation,

1978 - 1982 Engineer in the design, construction and commissioning of large boiler KW Jäntschwalde, Hagenwerder and Boxberg in VEB Dampferzeugerbau Berlin, GDR / DE



Current professional activities and construction duties:


2013 - Use in HITACHI than IBS / operator when starting the E-ON-fired power plant MPP3 Maasvlakte in Rotterdam (el. 1,100 MW, 2,939 t / h steam) coal-dust firing, 5 MPS mills, 5 DS Brenner levels (3 in front wall, 2 in back), oil - burner as auxiliary firing, boiler as mono block - construction, Turbine - Prototype of ALSTOM

2013 - Use as a commissioning engineer in an acrylic acid plant of Linde AG in Al Jubail, KSA in, Pre Commissioning, Commissioning for SAMCO Saudi Arabia

2012 - Commissioning - Head in the Stendal pulp mill for the energetic expansion, IBN part of systems in the \"Blue Mill\" - project preparation and appraisal of IBS a 45 MW steam turbine of Skoda. Part of a biomass - burning




Special knowledge and commissioning experience in large power plants, chemical plants and heating plants with lignite and coal dust firing von 1978 – 2013

2013 - With the commitment as a commissioning engineer / operator when starting the
E-ON - power plant MPP3 in Maasvlakte detailed experiences in the final cold commissioning and start-up as well as the gradual increase in performance when operating a boiler in mono block construction were collected. Besides the complexity of monitoring and control of the plant as operator special skills in gradual ramp-up of each plant components of the boiler plant were made. Special circumstances and problems starting the DS - burners were finally solved. The communication between the trades with each other and the gradual processing of individual problems was a prerequisite for their solution. In-depth experience in the IBS system components of this size could up to the abutment of the 1100 MW - are made by ALSTOM turbine, special problems of MPS - coal mills were dissolved interdisciplinary. Through the use of Maasvlakte new modern components were tested in the operation of the system and the behavior of a separately operated observed and tested \"two lines\" air preheater system.
It became clear that it is more effective if boiler components are individually checked and step by step optimized and not the multiple systems simultaneously.
Through my activities as an operator the boiler plant was observed in the whole and experience for safe operation are collected. DCS \"Melody\", super heater etc. Specially experience in the burner adjustment, control and regulation of individual systems, driving the Benson boiler, boiler protection, operation with ABB were system made etc., which are necessary for the use of boiler material T24 and as a sound basis can be evaluated with the use of T12 or other comparable materials.
Specific experience in initiating the 1100 MW el in driving the boiler - ALSTOM - turbo set could be collected.



1978 - 2012 were in various inserts in brown coals - ( KW Jäntschwalde , Boxberg , Hagenwerder ) collected special experience and knowledge both in theory and in practice, even in the engineering , construction and commissioning phase of steam generators -fired power plants . The theoretical foundations of large boilers in the use also of coal and other fuels were investigated.
During my time in the “Dampferzeugerbau Berlin”, Storkower Straße from 1978 to 1982 , the theoretical aspects of the boiler configuration and boiler design and practical bases for the operation of large steam generators were considered comprehensively and during deployments at start-up fixed on the construction sites of the GDR. This can also be done effortlessly adaptations of experience from my other professional activities on coal - fired boilers .
A multiple understanding of the processes occurring in large power plants was developed through very extensive experience in various combustion systems , which allow universal to solve the theoretical and practical challenges during installation and commissioning for power plants .
Due to the energy development in the world to constantly adapt and advance the knowledge of modern steam generator systems is necessary.
As a lecturer in adult Qualification ( boiler operator training , testing by TÜV ) is a continuous review and enhancement of the knowledge and personal experience requirement to provide the latest knowledge. Working in a pool of engineers and technicians at Reka Commissioning Services & Solutions Ltd. . will address the overall knowledge just by Benson boilers grow exponentially by the theoretical knowledge and practical experience of each engineer with anthracite coal.


Site places of commissioning supervision of “OSCHATZ” boiler systems
(*samples of cooling stacks)

2011 - QNP, Nitric Acid Plant Moura, Queensland, Australien
- SAP, Sulphuric Acid Plant , Saudi Arabian Mining Company, Ma’aden.

2010 - Steel making plant ISDEMIR, Turkey (*)
- NLMK Lipezk, Russia(*)
- Steel plants ILVA, Taranto, Italy, 2 times (*)
- Goro Nickel, Goro Nickel, New Caledonia

2009 - Goro Nickel, New Caledonia , 2 times
- NLMK Lipezk, Russia, 2 times (*)
- AMK Alchevsk Iron & Steel Works (AMK), Ukraine (*)

2008 - MEISHAN Steel plant, Meishan, China (*)
- ANSTEEL Steel plant, Anshan, China (*)
- BAYER Chemical Plants, Shanghai, China
- Iron and Steel Plant HANSTEEL, Handan, China, 2 times(*)
- Steel plants ILVA, Taranto, Italy, 3 times(*)

2007 - 2008 - Steel making plant ISDEMIR, Turkey(*)


Detailed information look at my Job and competence profile.

Project history

www.rekacommissioning.de   oder auf       Anfrage   !

Local Availability

Only available in these countries: Germany, Austria, Switzerland, Russian Federation, Italy, Liechtenstein, France, Slovakia, Egypt, Australia, Bahrain, Belgium, China, Denmark, Greece, Ireland, Iceland, Kazakhstan, Qatar, Kenya, Croatia, Cuba, Luxembourg, Namibia, Netherlands, Norway, Poland, Portugal, South Africa, Czech Republic, Turkey, Cyprus, Vietnam, Tanzania, Mauritius, Uganda und Maldives
verfügbar mit auch mit weiteren Mitarbeitern weltweit  !

Other

weltweite Inbetriebnahmen und  Montageüberwachungen in verschiedenen Bereichen des Anlagenbaus - Kraftwerke ( GuD, Kohlekraftwerke, Öl- und Gas gefeuerte Heiz- und Kraftwerksanlagen), Chemieindustrie ( Schwefelsäure- und Ammonium-Anlagen ), Petrochemie, Gasrückkühlsysteme, Konverter Stahlwerke etc.

sehen Sie auch unter            www.reka.commissioning.de
Profileimage by ReinhardHarald Kahler Dipl. Ing ( TU ) für Energie-Anlagen-Technik ( EAT), Commissioning Ingenieur Dampfsysteme from Bocholt Graduate Engineer ( TU ) for Power System Engineering
Register