Profileimage by Samuel Guerrero Senior Instrumentation and Control Engineer from Caracas

Samuel Guerrero

available

Last update: 06.09.2022

Senior Instrumentation and Control Engineer

Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Limited professional) | Spanish (Native or Bilingual)

Keywords

Valves (Piping) Instrumentation Pipes (Fluid Conveyance) Sensors AutoCAD Scientific Instruments Analytical Thinking Architecture Control Engineering Distributed Control Systems + 13 more keywords

Attachments

SG_CV I&C Auto_EngI_Samuel E.Guerrero A.pdf

Skills

For oil and gas international corporations, electricity generation and distribution, chemical sector and for the food and beverage industry.
Prepare instrument datasheets (process sensors, transmitters, control valves, safety valves, regulators, actuators, positioners, discrete sensors, analytical instruments)
Specification and / or evaluation of analytical and conventional instruments.
Word, Excel, Power Point, Ouptlux medium level, SPI Instrumentationl, AutoCad and Calculation applications for Instrumentation, Calculation and selection by  Fisher™ Valve Specification Manager, Masoneilan control valve sizing and Neles Valve selection software, Nelprof 6 - Metso, Software Valves –Jamerbury, ToolKit, FE-Sizer, Daniel, Online Emerson Calculation Application, Pipe Data and Vapor Table.
ISA - ISO, API-RP, AGA, IEC, NFPA, NEC, NEMA, ASME, OSHA, PDVSA, SHELL, EXXON MOBIL, OGP, PIP, SAUDI ARAMCO STANDARS, NORSOK STANDARS,  KOC.

Piping and instrument diagrams P&ID, control logic development, support to process engineers
Participate in evaluation of instrumentation and control equipment.
Prepare control narratives.
Prepare cause and effect diagrams
Prepare system control  architecture.
Specification programmable logic controllers: PLC and / or distributed control systems.
Participate in the hazard analysis assessments of  HAZOP process, What If
Support customer procurement process with the preparation specifications and review of offers.
Prepare instrument list / alarm list, list of inputs and outputs of control equipment.
Supervision of personnel with less experience in this discipline
Participate in project status reports for client.
Perform and document the quality assurance of the deliverables accordance with procedures.

Project history

06/2013 - 12/2019
Lead and ejecutor engineer of Instrumentation, control & Automation discipline.
Tecnoconsult I&C (Industry and mechanical engineering, 50-250 employees)

Responsible for these discipline in project and control, planning according to requirement and priorities. establish  level of responsibilities of assigned personnel, prepare the quality assurance plan, technical audits, risk analysis of project,  negotiation documents and follow-up of needs that arise in the execution of project ,  propose solutions to project, attend weekly meetings with client  to validate progress according to planning of execution strategy, keep track of project progress and HH expenditure.
INEOS Polymers Basic Engineering FEL-3 Increased plant:Increased plant, Evaluation and debottlenecking of existing facilities. Installed instruments were evaluated  for reuse to optimize investment. Capacity and range of each installed instrument were assessed using actual from plant performance data. The system was simulated with the new process conditions, applied to control valves, On-Off (Ball, Knife and Butterfly), Thermowells, RTD temperature sensors, pressure gauges, pressure transmitters, differential and multivariable, flow meter elements orifice plates, Coriolis, Venturi, Oxygen Analyzers, PH and reduction.
BASF Preparation of data sheets for 250 instruments such as Control Valves, On-Off (Ball and Butterfly) Flow Elements (Anubar, Ultrasonic, Corioles, Magnetic, Thermal, variable area),Thermowells selection based on fluid velocity vibration, Pressure transmission, differential and multivariable, Analyzers.
 KC Detailed Engineering, interconnection 2 new turbines type cogeneration, to generate 370 KW of electricity and steam from the heat recovery. 3D modeling of the route of cable tray trays, location of instruments elaborated in AutoCad 2D, Instruments drawing location, cables route and pipes, typical connection field instruments, list of materials and instruments.
Expansion-SPI. Introduction data to SPI (Smart Instrumentation Plan). P & IDs, instrument list, line list and pipe specification, to comply with the project quality parameters, it required me to develop a specific strategy that allowed location and data validation.
United Arab Emirates, Basic Engineering Technical audits, update of Basis and Design Criteria to development of engineering. Strategy for data collection and consistency checks, engineering of Gas and Fire detection system (Gas and Flame), process controls, emergency shutdown and fire water system, safety architecture, cause and effect diagrams.
Project “Orinoquia” development Basic Engineering for Reception, Storage and Shipment of 2000 t / h of Sulfur and 3000 t / h New Developments of rinoco Oil Belt. Scope project with facilities on land and offshore. Leader of discipline for on shore installations, audit conceptual engineering elaborated by others, make specification for contracting of  SIL / SIS study of whole plant, telecommunications study, execution of products a basic Engineering , PLC specification, Instruments and analyzers , fire and gas detection system, CCTV protection system, Intruder detection and access control, instrument data sheets, cable signal lists, instruments control and supervision architecture diagrams, equipment location instruments, main route of trays, pipe and cable benches. Construction specifications and metric calculations, shared and audited the common documents of offshore area.

08/2011 - 04/2013
Lead and ejecutor engineer of Instrumentation, control & Automation discipline.
OTEPI (Industry and mechanical engineering, 50-250 employees)

  • Master Plan Nestlé el Tocuyo. Automation of New Industrial Buildings, moving of machines for filling and packing food. Instrumentation update in food packaging and filling machines, addition of foreign body detecting equipment. Installation of new machines filling and packaging machines, detailed design for the installation of the systems: Detection and alarm of Fire, Voice and Data, with foresight for the future installation of a SCADA system.
  • Gas Compressionn Centro Operative Campo Santa Rosa Operation Center: For construction evaluation completion, diagnostic report, review, modification and completion, product development and studies required to complete the design, construction and commissioning of system for collection, transportation, separation and start-up of the gas facilities installed in the Operational Control and Compression Center. 

07/2010 - 05/2011
Senior Consultant Engineer for Instrumentation and Control Construction & Installation EPF 120 MBPD
Kuwait; Mark Technologies Company Wall Engineering Mark for Oil & Gas (Industry and mechanical engineering, 50-250 employees)

Construction and Installation of Instrumentation and Control Pre-Commissioning, Commissioning, and Start-up
and Fine Tuning / Troubleshooting. Slug Catchers, Three-phase Separators, Convection Ovens, Electrostatic
Dehydrators, Gas Compressors, Vapor Recovery Units, ANSI and API pumps, Gas Turbine driven Electric
Generators, Reverse Osmosis Units, Online Analyzers, Meters for Custody Transfer and Quality Control and
Communication, Gas and Fire Detection System and Fire Extinguishing.

02/2007 - 06/2010
Engineer Senior Lead of Discipline of Instrumentation, control & Automation.
Tecnicas Reunidas Spain (Other, 250-500 employees)

Elefis Refinery (Requirements and Technical Support Engineer) Project executed in Spain for Elefis Greece o achieve the purchase within the project planning of 525 PSV, 35PCV, 320 LG, 3 Nuclear Level Transmitters, lead the preparation of the data sheets, the request for an offer, answer to the questions of the bidders, the tabulation of the offers, and the cost control of HH. 
I was technical support of project, prepare the reports of technical consultations for the selection and application of technologies and equipment in accordance with the project standards of the project instrumentation group, make the design modifications required to achieve the measurement and control of the flow of the Low calorific gas to the boilers and the selection of technologies for level measurement in the Flex Coker unit and the measurement of gas flow to the vent.
Shail Rawl Depletion Compressor, four compression  Installation to compensate loss of subsoil pressure. executed in Spain for the Sultanate of Oman.

Instruments specification datasheet, bidder’s tabulation, documentation for purchase early fire detection systems for high and medium voltage control panels and frequency inverters; Review documents and vendor plans: compressor, containers, P&ID review, meetings with customer.


02/2006 - 01/2007
Lead and ejecutor engineer of Instrumentation, control & Automation discipline.
OTEPI (Other, 50-250 employees)

Development of Detail Engineering. Compression facilities for increasing the pressure from 150 to 1560 psig of the nominal flow of 600 MMSC of gas. The project included 6 compressors in low pressure 6 in high pressure, driven by electric motors, centralized systems for control and load balancing. Detailed Engineering. Development of specifications, control loops diagrams, mechanical and electrical installation details of instruments, cable routing, lists of cables, tubes and instruments; Updating of P&ID, PFD, and manufacturing drawings for contracting and construction.

OTEPI Consortium - Upstream Engineering I include the May-C platform type Sea Horse III for 6 offshore wells for PEMEX and the Bolontiku-B Platform type sea horse III for 4 offshore wells, Project executed in Houston EEUA.

Development of detail specifications for contracting and construction execution, control loop diagrams, installation details for instruments and cable, cable lists, tubes and instruments, P&ID update, PFD, plan revision Manufacturer and control systems.
Project (Electric Generation Combined Cycle Termo Barrancas Consortium) for Repsol Included 2 Turbo Gas Generators combined cycle capacity 20 MW each one

Basic Engineering Technical Review -Detail elaborated by others, selection of technologies, system specifications, narratives and control strategies, general lists: of equipment and instrument capabilities, control and protection system strategy. Update of P&ID, PFD, process and control plans, documentation for contracting and execution of next stage

Barranca Bermeja Refinery Project for ECOPETROL in Colombia Marco Project Scope 12 ovens, 3 boilers

Review and technologies selection, specifications of instrumentation and control system, compliance with Hazop and SIL for selection, specification and preparation of instrumentation datasheet, narratives and control strategies, control and protection systems, updating of P&ID.


01/2004 - 12/2005
Practice Leader Increase in Value-Instrumentation
PROYNCA (Other, 50-250 employees)

Study of the completion status of project according to practices of value increase (Constructability, Value
Engineering and engineering completion index (PDRI))
Project Production Units [Nigery Petrol) in Nigeria.

02/2003 - 01/2004
Commissioner and Startup Engineer
ENI Dación (Energy, water and environment, 50-250 employees)

Start-up and commissioning of facilities to expand production capacity, heavy oil 20º API.

08/2002 - 01/2003
Basic Engineering Lead Engineer
CARDON ENGINEERING

Campo Mata Negra) from Petrobras Energy-Venezuela.
TEIKOKU Project (Macolla Cup Field Plant).

01/2000 - 11/2001
Senior Advisor
PDVSA (Other, >10.000 employees)

Lead Technologies approval for I&C designs, leader of project of automation eastern division Venezuela for, data
collection and transmission. Aplication for Conceptual Engineering, Basic Detail and Construction the homologation of the Instrumentation design and control and instrumentation, application of best practices of Increase in value to the engineer that optimizes project investment costs:
  •  Replacement of Mini Plant Control System 4 MP of 40 MMSCFD each.
  • Four (4 RVU) vapor recovery
  • Update of 23 flow stations, 10 New and expansion of 30 plus 6 Gas dehydration plants.
  • Oil pipelines, gas pipelines and remote well protection.
  • Replacement of 4 Lighters capacity of 40-1,200,000 SCFD.
  • 10 Oil Heating and Treater Systems. Development of the fire detection and fire protection system for 60 production areas.
  • For 10 Tanks of 50 Mbls for crude storage.
  • Pumping Stations and Multi-Valve Valves for 60 Raw / Water Separation Stations, 120 Multi-Valves, Installation of 40 well test systems of the automatic separator type
  • 30 Chemical injection systems.
  • For 140 oil producing wells with mechanical equipment, safety automation.
  • Improved quality measurement of crude oil and Gas in 6 stations with LACT unit units, based on ultrasonic measuring equipment.

01/1996 - 01/2000
Technical Support Supervisor
PDVSA; Proyecto Gas Anaco

Proyecto Gas Anaco: Compression collection and treatment of the nominal production of 1200 MMSCFD of
natural gas of the ANACO field.
Responsibility to Coordinate the application of quality assurance in Engineering and construction of the project
and studies.

02/1992 - 12/1995
Lead Engineer Special Projects Maturin Project
PDVSA (Other, >10.000 employees)

For Maturín District Project Portfolio Production 1,200,000 BPD of Crude and Associated Gas. Lead the Quality Assurance Plans, Potential and training plans of professional staff; Monitoring and application of best practices to increase the value of engineering for cost optimization and investment of the project portfolio.
Leader of basic engineering activities, Detail instrumentation, coordinate and standardize the application of designs for Instrumentation control and Automation Specification and Selection (RTU, PLC, Control Strategies, control valves, transmitters for the collection of process data for measurement of the variables, analysis of the quality of crude oil, gas, treatment of the formation water and injection to the wells, stations, mini gas plants (implementation using digital control system for compressor control, custody transfer station for the projects named Specials in the Eastern Division of Venezuela:

  • FIELD JUSEPÍN Project - Development of the Furrial field production with a nominal flow of 1,200,000 BPCD and 240.MMSCFPD, Supervision and remote control of 230 crude producing wells, 4 steam recovery units, 2 tank capacity 600,000 BC, 2 Pumping Unit, 12 Well Test Units 300 Km of Pipeline, Gas pipelines.
  •  OROCUAL RECOR Project, First project for the injection of 24 million cubic feet of high pressure gas (6500 Psia), to maintain the decline in oil production of 20,000 BCPD in the field, the remote control of gas collection, injection to wells, dehydration and gas treatment and control of 2 reciprocating compressors.
  • JUSEPÍN RESOR project, treatment and filtration of water from Injection to the Furrial field formation (650,000 bblsd) to maintain the production decline of 800,000 BPD Crude Includes control of producing wells and water injectors, water treatment plant and use of 3 frame 3 turbines to turn the water injection pumps to 4500 psig.
  • FIELD JUSEPÍN AUTOMATION PLAN project, master plan of automation of the Furrial field for all operational facilities production facilities, gas pipeline, pipeline, electric generators and production of the Furrial field with a nominal flow of 1,200,000 BPCD and 240.MMSCFPD, for the Supervision and remote control of 230 Crude producing wells, 4 vapor recovery units, 2 tank capacity 600,000 BC, 2 Pumping Unit, 12 Well Test Units 300 Km of Oil Pipeline, Gas Pipelines.

 


01/1990 - 12/1991
Lead Engineer Special Projects
PDVSA (Other, >10.000 employees)

Lead Technologies approval for I&C designs, leader of project of automation eastern division Venezuela for, data
collection and transmission. Aplication for Conceptual Engineering, Basic Detail and Construction the homologation of the Instrumentation design and control and instrumentation, application of best practices of Increase in value to the engineer that optimizes project investment costs: 
  • Replacement of Mini Plant Control System 4 MP of 40 MMSCFD each.
  • Four (4 RVU) vapor recovery
  • Update of 23 flow stations, 10 New and expansion of 30 plus 6 Gas dehydration plants.
  • Oil pipelines, gas pipelines and remote well protection.
  • Replacement of 4 Lighters capacity of 40-1,200,000 SCFD.
  • 10 Oil Heating and Treater Systems. Development of the fire detection and fire protection system for 60 production areas.
  • For 10 Tanks of 50 Mbls for crude storage.
  • Pumping Stations and Multi-Valve Valves for 60 Raw / Water Separation Stations, 120 Multi-Valves, Installation of 40 well test systems of the automatic separator type
  • 30 Chemical injection systems.
  • For 140 oil producing wells with mechanical equipment, safety automation.
  • Improved quality measurement of crude oil and Gas in 6 stations with LACT unit units, based on ultrasonic measuring equipment.

01/1989 - 11/1989
Maintenance Engineer

Maintenance Supervisor Instrumentation lead and promote in natural work equipment, control and monitoring of
maintenance, HSE

Fixed and portable 12 and 20 MGW Electricity generating plants, Fixed and portable steam generating plants, crude and liquid gas shipping docks, gas cooling plant, Propane and liquid and crude Butane storage tanks (Capacities 20- 50MBD)


Local Availability

Only available in these countries: Venezuela
Av. Libertador,centro residencial Libertador Edf.Panama, El Bosque , Caracas Venezuela Code: 1050
Profileimage by Samuel Guerrero Senior Instrumentation and Control Engineer from Caracas Senior Instrumentation and Control Engineer