AL

Augusto Lozada

available

Last update: 06.01.2023

Project Manager Engineer, Project Manager Engineer & Processes, Project Manager Engineer

Graduation: Chemical Engineering (Chemical Engineer Superior Title) National Technological University, Buenos Aires Regional Faculty, 6 Year Plan (45 Finals). Join Finished State 1995 - Graduated in 2002.
Hourly-/Daily rates: show
Languages: English (Limited professional) | Spanish (Native or Bilingual)

Keywords

Engineering Tender Management Construction Technical Analysis Valves (Piping) Process Engineering Fuel Gas Hazard and Operability Study Heat Transfer Heat Exchanger + 11 more keywords

Attachments

curriculum-vitae-personal-data-ing-ing-augusto-jorge-lozada-eeuu--febr-2020.docx
CURRICULUM-VITAE-Eng-Eng-Augusto-Jorge-Lozada-January-2023-Project-EPC-Engineer_060123.docx
CV-Ing-Ing-Augusto-Jorge-Lozada-Ingeniero-Proyectos-EPC-Procesos-Enero-2023-AESA-SGS-SECIN_060123.pdf

Skills

Professional Profile
Twenty years of professional experience in which play the following positions: Project Manager, Lead Project Engineer disciplinary, Chief of Pre Commissioner, Chief of Engineering, Process Area Coordinator, Sr Process Engineer.
Work on projects of Engineering, Procurement and Construction (EPC), Detailed Engineering, Engineering and Basic Engineering ownership of oil refining
industries and power plants combined cycle.
Tasks performed:
Preparation and Review of Engineering Documents: Datasheet rotating & static equipment / valves / instruments, calculation report (equipment, lines, valves, control and relief), PDF, P & I, LO, Plot Plant, Mass Balance and Energy Cause-Effect Matrix, Equipment Operations Manual units
• Specification, revision-making Engineering for tender offers technical analysis, KOM, document review provider of static equipment (pressure vessels, towers, separators, accumulators, storage tanks) • Specification, revision-making Engineering for tender offers technical analysis, KOM, document review provider rotating equipment (compressors and pumps). • Systems and Subsystems Design services (fire, relief-flare, cooling water supply, return, drains, depressurization, high pressure steam, condensate plant air-Instruments / sweep gas, fuel gas, fuel oil ). • Design and Construction of heat transfer equipment (heat exchangers).
• HAZOP Studies-ACR-hazardous area classification, area classification, and FIRE
ENVIRONMENTAL IMPACT STUDIES

Project history

08/2019 - 01/2023
EPC Project Engineer

Project 1 Unit EPF Extraction and Refining of SHELLGAS
Client: WINTERSHALL
Workplace: Añielo Neuquén; Workshops and Technical Office of AESA Cannig, Ezeiza
Review of Technical documentation, consistency analysis of Basic Engineering, Coordination of
specialties, coordination of interdisciplinary work teams, Hydraulic calculations, assembly and
design of PEP, (Project Execution Plan)

Project 2. YPF LUZ cilp Cogeneration Unit
*Customer: YPF LUZ and GENERAL ELECTRIC
Workplace: La Plata Industrial Complex
Verification and Validation of Detailed Engineering
Review of technical documentation of the project
Management of meetings of different disciplines of the project
Coordination of critical supplies, resolution of critical deviations from the project
Monthly progress reports
Preparation and Management of Change Orders before Client and Technologist
Technical Analysis of Offers
Preparation of specifications of designs for supplies

07/2018 - 08/2019
Project Manager Engineer
ISA Company S.A

* NEW LP FLARE LINE Malvinas Peru
*Customer: Petroleum Company Pluspetrol -AESA
Engineering development: & I, Mass and energy balance,
FLARENET simulation, FLARESIM, HYSYS dynamic simulator, Utility balance, KOD hydraulic calculations
Client:Pluspetrol-AESA
*Integrity Study New Malvinas Gas Pipeline, Hydraulic calculations, mass balance and steady state
energy Hysys Simulator, dynamic state energy balance Multifario Multifase Simulator Transient
Software SPT Group OLGA 7.0.0
Client: PLUS PETROL-TECHINT - CONTRERAS

*ARC FLASH STUDIES, minimum load flow calculations, Study of
Short circuit,
Protective selectivity study, Arc Flash Elective Arc Study, CILP
ETAP 18.0 simulator

* FIRE FIGHTING SYSTEM LA AMAGA CHICA NEUQUEN, engineering reviewer, red redesign, verification of
hydraulic calculations. Fathom AFT simulator stationary hydraulic calculation of power systems, open
and closed systems, complex networks and loops. Pipe, valve and accessory, flow calculation,
pressure drop, heat transfer with or without thermal insulation. Sizing of pipes, pumps, valves,
calorie exchangers, pipe insulation.
*CIE ERGONOMETERIC STUDY
Client: YPF-CIE

10/2017 - 07/2018
Project Manager Engineer & Processes
JOSE CARTELLONE CONSTRUCCIONES CIVILES S.A

Draft:
*Plants of Biogas Tønder A / S, ENVO Group A / ENVO Biogas Aabenraa Denmark
*Project adaptation of LTS YPF plants Loma de la Lata Neuquen Argentina

12/2015 - 10/2017
Project Manager Engineer
TEMA; HAZOP AXION ENERGY PLANTA CAMPANA

Project: Hazop Studies for the Oil & Gas industry
HAZOP AXION ENERGY PLANTA CAMPANA

05/2014 - 12/2015
Project Manager Process & mechanical Engineer disciplinary
EMPRESARIOS AGRUPADOS SRL (SPAIN COMPANY)

Work place: Manuela Sáenz 324 Puerto Madero Buenos Aires
Project 1: Combined Cycle Power Ensenada de Barragan 450 MW
Project 2: Combined Cycle and Central Brigadier Lopez 230 MW
Client: ENARSA ISOLUX CORSAN IECSA
Project: SIEMENS GAS TURBINE SGT5-4000F,NEM , Steam Turbine SIEMENS SGen5-2000H, SCON-1000 SIEMENS
CONDENSER, Auxiliaries and Mechanical Systems Electrical Equipment Control System Verification of
compliance in the documentation produced in the engineering phase of the technical requirements of
the tender documents and construction bidding:
Verification of compliance in the documentation produced in the engineering phase of the Technical
Requirements of the tender documents and construction bidding: P & I, MASS AND ENERGY BALANCE,
PURCHASE ORDERS, ANALYSIS OF OFFERS, REVISION OF ENGINEERING PROVIDER,
COMPLIANCE VERIFICATION OF SIEMENS

09/2013 - 02/2014
Project Manager
OVEN BUILDINGS

Project: Y-TEC
The project stands in the town of Berisso, on the Avenue
Oil Argentino, in an area of 47 hectares compared to the Refinery
La Plata and close to Technological Pole. The architectural program is
in a building for offices and laboratories for the
research and exploration of oil and gas. The plan is completed
engine rooms, auditorium, reception and foyer, and programs
complementary staff canteen, library, gym and
costumes. A total of 11,000 m2 under construction, with the possibility of
extend similar surface.

11/2012 - 07/2013
Project Manager
HIDROCINETIC S.A

Project: 1: LIMPIEZA QUIMICA CENTRAL TERMOELECTRICA LOMA DE LA
LATA NEUQUEN
Project: 2: PARO DE PLANTA COMPRESORA GASCOMP REPSOL YPF

05/2012 - 10/2012
Lead Project & Process Engineer
INELECTRA -PETRO TIGER INTERNATIONAL COMPANY

Ashuganj 450 MW Combined Cycle Bangladesh. Client: TSK Construction Electronics, Electrical,
Ashuganj Power Station Company Ltd. (APSCL). Project: SIEMENS GAS TURBINE SGT5-4000F, CMI HRSG,
Steam Turbine SIEMENS SGen5-2000H, SCON-1000 SIEMENS CONDENSER, Auxiliaries and Mechanical Systems
Electrical Equipment Control System Tasks: Balance of water consumption of the unit of mass and
energy, balance of the gas fuel system, HYSYS 7.0 Simulation fuel gas consumption of the unit,
selection and definition of compressor power to regulate gas pressure fuel, Specification diameters
lines fuel gas supply system, Technical review of the offer. Project: Combined Cycle Power Plant
Client: DURO FELQUERA Tasks: Estimate of hours required specialty processes, Development of
specialty papers list of processes to provide conceptual engineering services, basic and detail for
the EPC of a combined cycle plant based 1x209FA STAG-MS (50 Hz) of 800 MW General Electric.

10/2010 - 03/2012
Chief of Engineering Project
NORBERTO ODEBRECHT CONSTRUCTION

catalytic reforming unit with continuous catalyst regeneration (CCR) UOP, New Flare and Remodeling
of existing units in the CIE (Industrial center..
Ensenada) Tasks: Technical Analysis deals, KOM, engineering review of suppliers, monitoring of the
construction process, coordination of technical consultations Works, Position: Chief of
Pre-Commissioner New Flare Preparation of test procedures of pre-commissioning, testing schedule,
review of systems and subsystems, equipment manuals reviewing, coordinating interdisciplinary
meetings.

05/2008 - 09/2009
Coordinator Specialty Chemical Processes
SKANSKA

Company: SKANSKA

Project: New customer Furnaces Topping III YPF Located INDUSTRIAL CENTER OF WHICH LUJAN Workplace:
Bartolomé Mitre°n 401 Capital Federal Buenos Aires Argentina Function: Coordinator Specialty
Chemical Processes
Position: Area Coordinator chemical processes
Project: New Oven Lujan de Cuyo customer YPF Project: Recap Ure Brazil, Petrobras client,
consistencies Analysis Project: Conversion Increase Refining and Refining Quality Adaptation located
in Puerto General San Martín (ACOR / ACAR PGSM) Project: RERATING exchanger units and UDV UDP-1 of
the Pampilla Refinery
Tasks: Review of documentation, P & ID Licensee interconnections
REPSOL YPF
Revision, Preparation of Piping and Instrumentation Diagrams (P & ID's) of utility systems: Fuel
system Fuel gas, fuel oil, cooling water system.
Review of P & I, Data Sheet and calculation memory of rotating and static equipment
Adapting a norms de REPSOL YPF documents and technical specifications Licensee
Revision Control System, Cause and Effect Matrix
Preparation of technical descriptions of ancillary services
Fire System Design
Review of mass and energy balance of the ancillary services

06/2004 - 05/2008
Chemical Process Engineer SR
SENER Engineering and Systems

Project 1: Combined Cycle Power Plant Manuel Belgrano
Project 2: Combined Cycle Power Plant San Martin Project: Combined Cycle Power Plant Manuel Belgrano
(TMB) Features: 2 x 2 x1 Two turbo generators whose turbines (V94.3A) powered by natural gas and /
or gas oil. The turbines are equipped with by-pass chimney used to anticipate the entry generating a
single cycle and to operate in this mode to maintain the steam generation
system. Two units of recuperative heat HRSG content in the exhaust gases of the gas turbine, taking
it from 560 ° C to just over 100 ° C., generating steam. Turbo generator set powered by steam from
the boilers. Water demineralization plant. Hybrid type cooling tower (wet / dry) Plume Abatement.
Neutralization system and effluent treatment. System gasoil supply consists of two subsystems: a
truck unloading station diesel oil at the site of the TMB, and a gas storage plant with 4 oil-tanks
each with a capacity of 7,500 m3, and TK is smaller than 500 m3 of capacity, equipped purification
system diesel oil. 820MW capacity Project: Combined Cycle Power Plant San Martín. Features: 2 x 2 x1
Two turbines Siemens (Model: SCC5-4000F 2x1) of 825 MW (ISO Condition) Net Heat Rate: 6220 kJ / kWh
(ISO Condition) Two units of recuperative heat HRSG CMI model. A Siemens steam turbine model
SST5-5000 (steam parameters: 565 ° C/125bar, C/30bar 565 °, 565 ° C/5bar A capacitor Siemens double
box type with stainless steel tubes Three Siemens Generators, SGen5-1000A air-cooled Eight storage
tanks of 5000 m3 Gas Oil TMB and TSM Tasks: Verification of compliance in the documentation produced
in the engineering phase of the technical requirements of the tender documents and construction
bidding: THIRD PART I TECHNICAL SPECIFICATIONS CONDITIONS SECTION CHAPTER 5 TECHNICAL SPECIFICATIONS
OF THE EQUIPMENT. Review of documentation, P & ID Licensee interconnections SIEMENS Revision,
Preparation of Piping and Instrumentation Diagrams (P & ID's) of utility systems: Fuel system Fuel
gas, fuel oil, cooling water system. Review of P & I, Data Sheet and calculation memory of rotating
and static equipment providers units demineralized water plants (Veolia and DEGREMON) Adapting KKS
system documents and technical specifications SIEMENS Licensee Revision Control System, Cause and
Effect Matrix Preparation of technical descriptions of ancillary services Fire System Design Review
of mass and energy balance of the ancillary services

02/2007 - 05/2007
Chemical Process Engineer SR

International experience
Project: 3 months in Spain "1000.REDUCCION AD1-FUEL OIL-VB3 MODIFICATIONS OF RESIDUE PROCESSING UNIT
FOR LONG" MUSKIZ, (VIZKAYA), SPAIN CLIENT: Repsol Petronor

08/2004 - 02/2007
Chemical Process Engineer SR
Lujan de Cuyo Industrial Complex

Project: CCR La Plata Detailed Engineering Project: HTN La Plata Engineering Design Project: HTN
LUJÁN Location : Industrial Lujan de Cuyo Client: Repsol-YPF * Preparation of P & ID & PFD *
Preparation of Data Sheets and Reports for calculating process equipment (reactors, rectify towers,
pumps, air coolers, heat exchangers, furnaces, pressure vessels, storage vessels, storage tanks,
etc..) * Balance of auxiliary services * Simulation of auxiliary services (Hysys 3.2) * Preparation
of Process Book * List of lines of auxiliary services. * List and verification of instruments and
control valves. Engineering Property:
Project: FLARE GAS RECOVERY Location: Complejo Industrial La Plata Engineering Property: Project:
NFPA Spheres Store
Location: Lujan de Cuyo Industrial Complex

06/2004 - 08/2004
Chemical Process Engineer JR
TEPSI

Location: LPG PLANT Paracas, Pisco, Perú
Tasks:Hydraulic test system
Alignment, verification and programming of control loops,
Alignment system for startup

03/2002 - 06/2004
Assistant Technical Office-Commercial
STUDIO GEOTECNIC ATTERBERG

Standards and codes used in the tasks
Pressure Equipment and Heat Exchangers: * ASME VIII Div 1 & Div 2 (Pressure Vessels, Spheres Store,
Columns, Reactors, Heat Exchangers) * TEMA (heat exchangers) * API 661 (Aero refrigerants) * API620
API 660 (Storage Tanks) 2. Furnaces and Heaters * API Std 560 (general services refinery furnaces) *
API RP 530 (heaters except steam and water services) * ASME / ANSI B.31.3 (pressure parts outside
the oven) 3. Machinery * API 610 (centrifugal pumps general refinery services) * API 617 (axial and
centrifugal compressors) * API 618 (reciprocating compressors) * API 675 (positive displacement
metering pumps) * API 682 (shaft sealing systems for pumps) 4. Reliefs Systems * API 520 (relief
systems in refineries) * API 521 (refinery despresurisación Systems) * API 2510 (Design and
Construction of LPG plants) 5. Electricity * IEC 60079-10 / 20 (Hazardous Area Classification) 6.
Instrumentation * ISA S-5.1 (Identification Symbols and Instruments) * NFTA 72 (Fire and Gas
Systems) * API 550 (Installation of Instruments) 7. Fire Protection * API RP 2001 (Fire Protection
in Refinery) * NFPA 10,11,11 A, 12,13,15,16,17,20,22,24,72 * API 2218 (Fireproofing) * ACT 13660 8.
Other ISO 9000/14001, OHSAS 18001, design specifications: TOTALFINALF, Shell, Petrobras, Repsol-YPF,
WORLEY PARSON Computer Tools * HYSYS process simulator / BJAC / INTRUCALC / ESI / FEP / PIPE FACE *
AUTOCAD DESIGN WITH DATABASE * EXCEL-WORD * DATABASE PROJECT Language English - Advanced - Reading,
conversation, translation of technical documents, bidding documents, manuals and Plant Operation
Chemical Process Units Studied: British Institute
Remuneration: $50.000 - $80.000. py plus 10 day vacation

Local Availability

Only available in these countries: USA
Profileimage by Augusto Lozada Project Manager Engineer, Project Manager Engineer & Processes, Project Manager Engineer from EEUU Project Manager Engineer, Project Manager Engineer & Processes, Project Manager Engineer
Register