Keywords
Skills
Venezuelan Electrical Engineer with an Msc Degree in Electrical Engineer from Vanderbilt University, USA; with 25+ years of experience in Oil Refineries.
I have experience in managing integrated Multidisciplinary Projects, Electrical Maintenance, Utility Operation, Project Management, Commissioning Engineer in the Oil Industry, Construction Management, Project Engineer. Proficient in computer tools (Word, Excel, and PowerPoint). Speak Spanish (natural language), English (Fluent)
I have experience in managing integrated Multidisciplinary Projects, Electrical Maintenance, Utility Operation, Project Management, Commissioning Engineer in the Oil Industry, Construction Management, Project Engineer. Proficient in computer tools (Word, Excel, and PowerPoint). Speak Spanish (natural language), English (Fluent)
Project history
- BEV.CA Barcelona –Anzoategui State
- Senior Electrical Engineer
Since: March 2015 - September 2016
- FREELANCE
- Electrical Engineer Advisor – Refrigeration Coordinator
Since: June 2013 – March 2015
- PROENERGY SERVICES
- Resident Engineer
Since: July 2012 - May 2013
- FREELANCE
- Electrical Engineer Advisor – Refrigeration Coordinator
Since: September 2008 - July 2012
- Tecnicas Reunidas
- Electrical Engineer Specialist
Since: April 2008 - September 2008
- S.A.I.P, C.A
- Marketing Executive for Venezuela East Region
Since: August 2007 To: March 2008
- FREELANCE
- Electrical Construction Adviser
Since: September 2.002 - July 2007
- SINCOR C.A. (Joint Venture Total / Statoil / Pdvsa)
- Commissioning Electrical Engineer
Review and monitor EPCC Contractors Pre-commissioning & Commissioning Progress to ensure Deliverables, Milestones, and Schedule Completion Dates are Achieved.
Since: March 2000 - August 2002
- HIDROFALCON C.A. (STATE HYDROLOGIC)
- Project Management
Description: Assigned by PDVSA responsible for the Administration, Coordination, and Control of all activities related to the Hydrologic Investment Projects related to Engineering, Budget Control, Planning and Document Control to ensure a good Technical/Administrative effort in order to achieve cost, time and quality parameters.
During the assignment, I was a temporary Vice-president and President in several opportunities
From: July 1998 - February 2000
- PDVSA PETROLEO Y GAS
Centro Refinador Paraguaná
Punto Fijo- Falcón State
- Finance Management
Description: Responsible for all the Work and Services Contract Stages at the Paraguana Refinery Complex (900.000 daily Barrels installed capacity) including National and International Negotiation after PDVSA decided to consolidate the two main Refineries in the Country in one big Complex.
From: January 1998 - July 1998
- MARAVEN S.A. ( PDVSA, S.A. )
Punto Fijo- Falcón State
- Finance Management
Description: Responsible for all the Work and Services Contract Stages at the Paraguana Refinery Complex including National and International Negotiation
From: January 1997 - December 1997
- Project Management
Description: Responsible for the Coordination of the Energy Study (Electrical Power and Steam) to integrate the four main suppliers on the zone (Maraven, Lagoven, Eleoccidente y Genevapca) in order to get an integrated operational scheme to optimize and get reliable power supply reducing refineries operational costs.
From: May 1996 - January 1997.
- Project Management
Description: Responsible for the Administration, Coordination, and Supervision of all activities related to Contracting, Budget Control, Planning, Cost Control, Cost Engineering and Documentation Control of Refinery Investment Projects to guarantee lower cost, good time and high-quality parameters with reduced contractor claims.
From: March 1995 - May 1996.
- Operational Management
Description: Responsible for the Utility Plant Operation of Three Electrical Power Generation Areas consisting of: three (12 MW each) Gas Turbine Generators and four (12 MW each) Steam Turbine Generators; Steam Production Area for Electrical Power Generation and Process Use; Boilers Water Treatment Plant, Condensed Water Treatment Plant; Waste Water Treatment Plant; Cooling Water System; Air Compressed for Industrial use and Instrument.
From: July 1994 - February 1995.
- Project Management
Description: Responsible of a multidisciplinary team for the Control, Contracting, Constructing and Start Up of the (US Million 100) Project consisting of: installation of six Steam Boilers of 155 Tn/Hr each, four Steam Turbo-generators of 12 MW each, Explosion Proof Computerized Control Room and auxiliaries equipment related to this new plant. Between other function, attending FAT in: Japan (Mitsubishi-Generators), England (Brush-Transformers), France (Merlin Gerin-Switchgear), Venezuela/Colombia (Distral Termica-Boilers) also leading technical discussions with this group.
From: September 1988 - June 1994
- Operational Management
Description: Responsible for the coordination of the operational process of the utility facilities consisting of: Electrical Power Generation, Steam Generation and Distribution, Demin Water Plant, Waste Water Plant, Air Compressed, Fire Water System, Sea Cooling Water Pumps and Distribution.
From: February 1987 - August 1988
- Maintenance Management
Description: Responsible for the Preventive, Programmed and Unexpected Electrical Maintenance of all the electrical equipment installed in the Cardon Refinery
From: June 1984 - January 1987
- Maintenance Management
Description: Responsible for the Maintenance and Fault Correction of any unexpected fault occurred in the Refinery Electrical System
From: March 1982 - May 1984
- Maintenance Management
Description: Responsible for the Calibration, Coordination, and Test of all the Electrical Protective Devices and Buried Distribution Cables installed in the Refinery
From: August 1981 - February 1982
- MARAVEN S.A.
Lagunillas- Zulia State
- Engineering Management
Description: Responsible for the Control, Planning and Start-Up of Small Projects on the Welling Production Area
From: February 1979 - July 1981
- Engineering Management
Description: Responsible for Electrical Engineering Special Studies Preparation attending the Welling Production Area and Refineries
From: September 1978 - January 1979
Local Availability
Only available in these countries:
Venezuela