Profileimage by ByoungSoo Kang SAP SD LE WM TM TD Consultant from Seoul

Byoung-Soo Kang

available

Last update: 26.02.2015

SAP SD LE WM TM TD Consultant

Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Limited professional)

Skills


Free-Lancer at Miwon 
 May 2014   to   November 2014 
Position Summary:
SD, LE Module Consulting
 - Integration of 3 company JICO Agung, PT Miwon, ABN with Intercompany business ;
 - Logistic for whole Indonesia and Local Tax
 - Sales process for Sales company ;
 - Sales and logistic process for producing company ;




Free-Lancer at Oriental Brewery Company 
 March 2014   to   April 2014 
Position Summary:
SD, LE, WM, MM Module Consulting
 - Improvement for logistic process and changing system ;
 - System for tax of alcohol ;
 - Preparing warehouse management system ;
 

Free-Lancer at MM Module Consulting 
 October 2013   to   February 2014 
Position Summary:
DKSH Korea Roll Out Project
SD, LE, WM, MM Module Consulting
 - Defining process of Purchasing, Sales and logistic process for hospital suppliance include medicine
 - Defining process of sales and logistic for external warehouse in hospital
 - Defining process for External warehouse ;
 - Using DKSH Global Template with upgrading ERP version from 4.6 to ECC6.0 ;
 

Free-Lancer 
 August 2013   to   August 2013 
Position Summary:
Hyundai-Sungwoo Analysis of sales & distribution in USA office
Sales, Logistic and Purchasing Business Consulting
 - Analysis requirement of Management, Wheel Sales, Weight Balance Sales, Battery Sales, Sales Engine Clamp
- Analysis totally 14 processes, Defining 12 long term tasks and 58 short term tasks
- Preparing ERP Project for each task. ;
- Supporting External warehouse management, Business with Carmaker ;


Free-Lancer at Module Consulting 
 March 2013   to   July 2013 
Position Summary:
SK Innovation ERP Roll-Out Project
TD (Transportation & Dstiribution) Module Consulting
 - Separating In-choen Plant and Trading Company ;
 - Transportation & Distribution System in IS-OIL Solution ;
 - Logistic System in Down-Stream Area. ;
 - Transportation System with Component for Tanklorry type ;
 - Delivery Confirm System for Pipeline ;
 - Analyzing several Tax for Oil with IS-Oil System ;
 - 3PL Process for SK Trading ;
 - System for Reporting Oil information to Government ;


Free-Lancer at DooSan Electronics 
 July 2012   to   February 2013 
Position Summary:
DooSan Electronics ERP Roll-Out Project in China
LE Module Consulting
 - Design Logistic Process & System for Company in China
 - Warehouse system with RF device (SAP WMS) for all type material (CCL, FCCL, OLED)
 - Logistic Process for analyzing China VAT
 - Different FIFO for Customer type. ;
 - Different delivery process and system for Customer & Material ;
 - Inputting raw material to Plant for PP ;
 - Strategy for Picking, Strategy for Put-away (Storing) with Batch characteristics.
 - Automatics calculation transportation fee with SAP TMS
 

Free-Lancer at DooSan Electronics 
 November 2011   to   June 2012 
Position Summary:
DooSan Electronics D-One ERP Project in Korea
LE Module Consulting
 - Logistics Process & System for Several type ;
 - Logistics with EXE WMS(for Warehouse management, Non-SAP System) for CCL
 - Logistics with MES(for Production, Non-SAP System) for FCCL,
 - Logistics & Warehouse management (SAP WMS) for OLED, CCL
 - Logistics with OFS(for forecasting requirement, Non-SAP System)
 - Logistics with SCM Portal (for Information, Non-SAP System)
 - Logistics with EXE TMS(for Transportation management, Non-SAP System) for CCL
 - Logistics & Transportation management (SAP TMS) for FCCL, OLED, CCL
 - Logistics for Export system (Local SAP Solution) ;


Free-Lancer at LE Module Consulting 
 April 2011   to   October 2011 
Position Summary:
Lotte Global ERP Project (Guylian chocolate in Belgium)
LE Module Consulting
 - Warehouse management (SAP WMS) with RF Device ;
 - Logistics process & System with I.E.D(Internal Expired Date), E.E.D(External Expired Date) for food
 - Optimized Strategy for Picking and Putaway(Storing) with several Pallet types
 - Good Receipting raw material with RF device and Storing strategy with RF Device
 - Managing External Warehouse ;
 - Receipting Goods Process and managing in warehouse for the Bulk type material
 - Efficiency Process and system for Physical Inventory in warehouse.
 - Supplying Raw and Half Material to each production Zone(Delivery Zone) like JIT.
 - Management Batch Characteristics including External warehouse.
 - Supplying Raw & Half material to External Plant ;


Free-Lancer 
 September 2010   to   February 2011 
Position Summary:
KT ERP Transformation Design
Consulting process from Order to Cash
 - Analyzing Sales & Distribution for Order to Cash in Telco Business
 - Analyzing As-Is for Traffic Service, Sales, Rental, Project service
 - Designing To-Be Process for Traffic Service, Sales, Rental, Project service
 - SAP ERP Prototyping for To-Be Process ;
 - Analyzing As-Is for Merging Multi-ERP of KT (Cable) & KTF(Mobile)
 - Design for RICEF(Report, Interface, Conversion, Exit, Function) & Functional Spec


Free-Lancer at SD-LE Module Consulting 
 October 2009   to   August 2010 
Position Summary:
HanHwa Chemical ERP Project
SD-LE Module Consulting
 - Sales & Logistic System for Chemical Product ;
- Warehouse Management for Package Product with RF Device
- Transportation Management for Chemical Product include Hydrochloric acid.
- Managing CY Stock in Container Level
- Plant-Issue for Export Package ;
 

Free-Lancer at Samsung Electronics 
 June 2009   to   September 2009 
Position Summary:
SD-LE Module Consulting
 - Design Logistic System for SMD(Small Mobile Display) ;
- WM System for Subsidiary Company ;
- Managing Serial No. for Production Machine for Sam-Sung. ;


Free-Lancer at Samsung Electronics 
 February 2009   to   May 2009 
Position Summary:
SD-LE Module Consulting
 - Design Logistic System for Europe with Warehouse Management in Slovakia
 - JIT System for Steady Suppliment LCD Panel for TV with Loading Plan
 - Managing the Serial No. for Non-difference between System and Real Stock.
 - System with Storage Unit and Handling Unit for Managing Stock with Pallet Level
 

Free-Lancer at Samsung Electronics 
 October 2008   to   January 2009 
Position Summary:
SD-LE Module Consulting
 - Design Logistic System for Electronic Goods like Semi-Conduct, TV, ... ;
- Logistic System Between Inter-Company ;
- Logic for Calculation in Variant Type Transportation ;
- Warehouse Management System for LSI Plant in KOREA. ;
 

Accenture Korea 
 April 2008   to   September 2008 
Position Summary:
Corn Product International Korea Wave 3 ERP Project
SD-LE Module Consulting
- Design ERP System for limited life Goods like Foods ;
- Transportation System for Bulk Product include Exporting in Brazil
- Picking system for FIFO of Limited life Goods in Warehouse Management.


Accenture Korea 
ERP
 December 2007   to   March 2008 
Position Summary:
Faurecia Korea ERP Project
SD-LE Module Consulting
 - Design ERP System for JIT for Automobile Company (Hyundai, KIA, GM-DaeWoo)
- Supporting Logistics for 4 hours Product Planning of Automobile Company
 (Hyundai, KIA, GM-DawWoo)
- Billing System for Automobile Company ;
- Alarm System for Supplying Finished-Goods to Automobile Company ;
 

Accenture 
 July 2007   to   November 2007 
Position Summary:
Ssang-Yong Cement Next generation ERP Project
SD-LE Module Consulting
 - Design Sales & Logistic System for Cement/Ready Mixed Concrete
 - Forecasting of mixing rate in Ready Mixed Cement for consumption of Cement, Rocks
 , Sands,...
 - Design Full-Automatic Logistic System for Night Cement Goods Issues with RFID. ;


BearingPoint Korea 
ERP
 March 2007   to   June 2007 
Position Summary:
Lotte Trading ERP Project
SD-LE Module Consulting
 - Setting SD Module with GTM for Openning ERP
 - Setting SD Module with KT Bizmeka (LCN)
 - Setting SD Module ;
 

BearingPoint Korea 
 November 2006   to   February 2007 
Position Summary:
(4 Months) Korea Ginseng Cooperation PI Project
SD-LE Module Consulting
 - Analysis As-Is of Sales and Distribution
 - Define Process Innovation Issues
 - To-Be Visioning ;


LS Cable 
 January 2006   to   November 2006 
Position Summary:
LS Cable ERP Machinery Part Roll-out Project
SD-LE Module Consulting
 - Design and Set-Up Full SD Module for Injection Machine Depart ;
 - Design the Strategy of Customer Grouping
 - Design the Strategy of Determination Price. ;
 - Design the Strategy of Customer Credit Management. ;
 - Design the Strategy of Determination appointed date for Customer ;


LE Implementation Consulting 
 January 2003   to  Present




Sales at Injection Molding Machine Domestic 
 January 2000   to   December 2002
 

Sales at Injection Molding Machine Oversea\'s 
 January 1999   to   December 1999 


Controller at R&D Center 
 January 1996   to   December 1998

Project history


Free-Lancer at Miwon 
 May 2014   to   November 2014 
Position Summary:
SD, LE Module Consulting
 - Integration of 3 company JICO Agung, PT Miwon, ABN with Intercompany business ;
 - Logistic for whole Indonesia and Local Tax
 - Sales process for Sales company ;
 - Sales and logistic process for producing company ;




Free-Lancer at Oriental Brewery Company 
 March 2014   to   April 2014 
Position Summary:
SD, LE, WM, MM Module Consulting
 - Improvement for logistic process and changing system ;
 - System for tax of alcohol ;
 - Preparing warehouse management system ;
 

Free-Lancer at MM Module Consulting 
 October 2013   to   February 2014 
Position Summary:
DKSH Korea Roll Out Project
SD, LE, WM, MM Module Consulting
 - Defining process of Purchasing, Sales and logistic process for hospital suppliance include medicine
 - Defining process of sales and logistic for external warehouse in hospital
 - Defining process for External warehouse ;
 - Using DKSH Global Template with upgrading ERP version from 4.6 to ECC6.0 ;
 

Free-Lancer 
 August 2013   to   August 2013 
Position Summary:
Hyundai-Sungwoo Analysis of sales & distribution in USA office
Sales, Logistic and Purchasing Business Consulting
 - Analysis requirement of Management, Wheel Sales, Weight Balance Sales, Battery Sales, Sales Engine Clamp
- Analysis totally 14 processes, Defining 12 long term tasks and 58 short term tasks
- Preparing ERP Project for each task. ;
- Supporting External warehouse management, Business with Carmaker ;


Free-Lancer at Module Consulting 
 March 2013   to   July 2013 
Position Summary:
SK Innovation ERP Roll-Out Project
TD (Transportation & Dstiribution) Module Consulting
 - Separating In-choen Plant and Trading Company ;
 - Transportation & Distribution System in IS-OIL Solution ;
 - Logistic System in Down-Stream Area. ;
 - Transportation System with Component for Tanklorry type ;
 - Delivery Confirm System for Pipeline ;
 - Analyzing several Tax for Oil with IS-Oil System ;
 - 3PL Process for SK Trading ;
 - System for Reporting Oil information to Government ;


Free-Lancer at DooSan Electronics 
 July 2012   to   February 2013 
Position Summary:
DooSan Electronics ERP Roll-Out Project in China
LE Module Consulting
 - Design Logistic Process & System for Company in China
 - Warehouse system with RF device (SAP WMS) for all type material (CCL, FCCL, OLED)
 - Logistic Process for analyzing China VAT
 - Different FIFO for Customer type. ;
 - Different delivery process and system for Customer & Material ;
 - Inputting raw material to Plant for PP ;
 - Strategy for Picking, Strategy for Put-away (Storing) with Batch characteristics.
 - Automatics calculation transportation fee with SAP TMS
 

Free-Lancer at DooSan Electronics 
 November 2011   to   June 2012 
Position Summary:
DooSan Electronics D-One ERP Project in Korea
LE Module Consulting
 - Logistics Process & System for Several type ;
 - Logistics with EXE WMS(for Warehouse management, Non-SAP System) for CCL
 - Logistics with MES(for Production, Non-SAP System) for FCCL,
 - Logistics & Warehouse management (SAP WMS) for OLED, CCL
 - Logistics with OFS(for forecasting requirement, Non-SAP System)
 - Logistics with SCM Portal (for Information, Non-SAP System)
 - Logistics with EXE TMS(for Transportation management, Non-SAP System) for CCL
 - Logistics & Transportation management (SAP TMS) for FCCL, OLED, CCL
 - Logistics for Export system (Local SAP Solution) ;


Free-Lancer at LE Module Consulting 
 April 2011   to   October 2011 
Position Summary:
Lotte Global ERP Project (Guylian chocolate in Belgium)
LE Module Consulting
 - Warehouse management (SAP WMS) with RF Device ;
 - Logistics process & System with I.E.D(Internal Expired Date), E.E.D(External Expired Date) for food
 - Optimized Strategy for Picking and Putaway(Storing) with several Pallet types
 - Good Receipting raw material with RF device and Storing strategy with RF Device
 - Managing External Warehouse ;
 - Receipting Goods Process and managing in warehouse for the Bulk type material
 - Efficiency Process and system for Physical Inventory in warehouse.
 - Supplying Raw and Half Material to each production Zone(Delivery Zone) like JIT.
 - Management Batch Characteristics including External warehouse.
 - Supplying Raw & Half material to External Plant ;


Free-Lancer 
 September 2010   to   February 2011 
Position Summary:
KT ERP Transformation Design
Consulting process from Order to Cash
 - Analyzing Sales & Distribution for Order to Cash in Telco Business
 - Analyzing As-Is for Traffic Service, Sales, Rental, Project service
 - Designing To-Be Process for Traffic Service, Sales, Rental, Project service
 - SAP ERP Prototyping for To-Be Process ;
 - Analyzing As-Is for Merging Multi-ERP of KT (Cable) & KTF(Mobile)
 - Design for RICEF(Report, Interface, Conversion, Exit, Function) & Functional Spec


Free-Lancer at SD-LE Module Consulting 
 October 2009   to   August 2010 
Position Summary:
HanHwa Chemical ERP Project
SD-LE Module Consulting
 - Sales & Logistic System for Chemical Product ;
- Warehouse Management for Package Product with RF Device
- Transportation Management for Chemical Product include Hydrochloric acid.
- Managing CY Stock in Container Level
- Plant-Issue for Export Package ;
 

Free-Lancer at Samsung Electronics 
 June 2009   to   September 2009 
Position Summary:
SD-LE Module Consulting
 - Design Logistic System for SMD(Small Mobile Display) ;
- WM System for Subsidiary Company ;
- Managing Serial No. for Production Machine for Sam-Sung. ;


Free-Lancer at Samsung Electronics 
 February 2009   to   May 2009 
Position Summary:
SD-LE Module Consulting
 - Design Logistic System for Europe with Warehouse Management in Slovakia
 - JIT System for Steady Suppliment LCD Panel for TV with Loading Plan
 - Managing the Serial No. for Non-difference between System and Real Stock.
 - System with Storage Unit and Handling Unit for Managing Stock with Pallet Level
 

Free-Lancer at Samsung Electronics 
 October 2008   to   January 2009 
Position Summary:
SD-LE Module Consulting
 - Design Logistic System for Electronic Goods like Semi-Conduct, TV, ... ;
- Logistic System Between Inter-Company ;
- Logic for Calculation in Variant Type Transportation ;
- Warehouse Management System for LSI Plant in KOREA. ;
 

Accenture Korea 
 April 2008   to   September 2008 
Position Summary:
Corn Product International Korea Wave 3 ERP Project
SD-LE Module Consulting
- Design ERP System for limited life Goods like Foods ;
- Transportation System for Bulk Product include Exporting in Brazil
- Picking system for FIFO of Limited life Goods in Warehouse Management.


Accenture Korea 
ERP
 December 2007   to   March 2008 
Position Summary:
Faurecia Korea ERP Project
SD-LE Module Consulting
 - Design ERP System for JIT for Automobile Company (Hyundai, KIA, GM-DaeWoo)
- Supporting Logistics for 4 hours Product Planning of Automobile Company
 (Hyundai, KIA, GM-DawWoo)
- Billing System for Automobile Company ;
- Alarm System for Supplying Finished-Goods to Automobile Company ;
 

Accenture 
 July 2007   to   November 2007 
Position Summary:
Ssang-Yong Cement Next generation ERP Project
SD-LE Module Consulting
 - Design Sales & Logistic System for Cement/Ready Mixed Concrete
 - Forecasting of mixing rate in Ready Mixed Cement for consumption of Cement, Rocks
 , Sands,...
 - Design Full-Automatic Logistic System for Night Cement Goods Issues with RFID. ;


BearingPoint Korea 
ERP
 March 2007   to   June 2007 
Position Summary:
Lotte Trading ERP Project
SD-LE Module Consulting
 - Setting SD Module with GTM for Openning ERP
 - Setting SD Module with KT Bizmeka (LCN)
 - Setting SD Module ;
 

BearingPoint Korea 
 November 2006   to   February 2007 
Position Summary:
(4 Months) Korea Ginseng Cooperation PI Project
SD-LE Module Consulting
 - Analysis As-Is of Sales and Distribution
 - Define Process Innovation Issues
 - To-Be Visioning ;


LS Cable 
 January 2006   to   November 2006 
Position Summary:
LS Cable ERP Machinery Part Roll-out Project
SD-LE Module Consulting
 - Design and Set-Up Full SD Module for Injection Machine Depart ;
 - Design the Strategy of Customer Grouping
 - Design the Strategy of Determination Price. ;
 - Design the Strategy of Customer Credit Management. ;
 - Design the Strategy of Determination appointed date for Customer ;


LE Implementation Consulting 
 January 2003   to  Present




Sales at Injection Molding Machine Domestic 
 January 2000   to   December 2002
 

Sales at Injection Molding Machine Oversea's 
 January 1999   to   December 1999 


Controller at R&D Center 
 January 1996   to   December 1998

Local Availability

Only available in these countries: South Korea
If I should work out of Korea, I need house and transportation.
 
Profileimage by ByoungSoo Kang SAP SD LE WM TM TD Consultant from Seoul SAP SD LE WM TM TD Consultant
Register