* Facilitated meetings for discovery of business unit identity requirements.
* Prepared a business use cases as well as a plan for going forward.
* Created a requirements document and architecture that then became the
underpinning of three RFP's he produced (one for product, one for
implementation and the other for customized work). He then led the RFP review
team and selected vendors.
* In parallel to these efforts Guy mapped out existing business flows and then
created proposed business flows.
* Identified detailed requirements for a centralized identity data repository.
* He prepared an extensive project plan that included testing and data migration
* Mr. Huntington oversaw the creation of a communication strategy for identity
management.
* Hydro was the first utility in North America to deploy smart meters to all its
customers. Guy convinced the management team to hire two groups of
consultants to come in and do penetration tests on the smart meters, SCADA
and corporate IT infrastructure to ensure customer and corporate security.
* Mr. Huntington worked closely with the executive team designing the security
architecture that was in sync with their business architecture and their strategic
enterprise goals. He also made numerous executive presentations.
* Subsequently Guy was contracted to work with the Director of Infrastructure in
parallel to create a business case to reduce total operating costs for the different
type of servers. They then went on to virtualize about 80% of their servers.
* Mr. Huntington was contracted back a third time by the CIO to prepare the
architecture for "smart grid".
* Guy prepared a series of detailed use cases and added to it cases for electric
vehicles operating under different situations.
* Then he prepared a conceptual architecture for this identifying each type of
service that would be required.
* Guy created supporting workflows for each step in the use cases and then traced
out the interactions between the different architectural pieces.
* Mr. Huntington prepared several white papers for senior management to
communicate the complexity of implementing smart grid. He also prepared a
business case that included cost estimates as well as a suggested roadmap.
* Environment: Oracle identity suite 11g, AD, SQL, Oracle RAC, Remedy,
Homegrown HRMS, Firewall products, Telvent, Elster, Sharepoint, Gridpoint,
Ellipse, Banner, Novell eDirectory, Oracle CRM, MS Project, COBIT, ITIL