Profileimage by WILLIAM COVA Project Manager from Puertolacruz

WILLIAM COVA

available

Last update: 17.11.2020

Project Manager

Graduation: Mechanical engineer Specialized in management of projects
Hourly-/Daily rates: show
Languages: German (Elementary) | English (Limited professional) | Spanish (Native or Bilingual)

Attachments

curriculum-pdvsa-wcova-english.doc

Skills

Mechanical Engineer for more 27 years of experience in development multidisciplinary Projects for national industry (oil and petroquimichal).
 
Projects manager, Leader of Projects, Coordinator and Mechanical leader in mutlidisciplanry projects for oil industry, Piping System design, Pressure Vessel, Oil Tanks, calculation Pumps and compressores, selection of rotative equipments, preparation of engineering packages (Conceptual, Básic and details), conceptual study, support to the disciplines process for preparation of the designs, start up of plants of processes, inspection and production of pipes and teams in shop and field, Preparation of test and inspection packages, Hazop, Preparation bid packages, cost estimate, estimate of men hours of Engineering, accounting, customses Tariff, Handling of Tariffs and National and International Purchases, Handling of contracts, invoice, valuation of Works. etc.
 

Project history

PDVSA, Executive direction of new Projects of Refineries, upgrade and Terminals (from 28/04/2009 until the current).
 
Leader of management Project, development of basic engineering  for the Project storage terminal and shipment crude of Araya-TAECA.
 
Project manager, Visualization and development conceptaul for the Project surface instalation for handlin solids and liquids coming from the field Carabobo and Junin of the Orinoco oil belt. National Oil Plan
  • Storage Terminal and shippment crude of the Araya-TAECA.
  • Storage Terminal and shippment solids of Orinoquia-TAESO.
  • Pipeline and Sotrage Tanks of Junin and Carabobo.
Support at the Project  Industrial condominium and services of Junin and carabobo.
Support to the development plan of Junin and Carabobo
Study of navigability for the Orinoco river.
 
PDVSA, Management of Commercialization and distribution Venezuela (from 11/11/2008 up to the 28/04/09). 
 
Boss of Plant of Distribution the Guamache-Margarita Nueva Esparta state. 
 
PDVSA, Management of Engineering and Projects Puerto la Cruz (from 01/03/2004 up to the 11/11/08). 
 
Project manager Visualization of the facilities of Surface for the Handling and shippment solids and liquids coming from the fields Junin and Carabobo of the FPO. 
 
Support in the Elaboration of the Plan of Development of Carabobo and their process of Bid. 
 
Consultent of the Project  reactivation Sideroca-Proacero Steel Complex.
Definition scope, strategy of execution and Analysis of alternative of the reactivation, elaboration the presentation for approval and requirements of funds before the joint directive .
 
Project manager  Increment of Storage Capacity of crude of the Puerto la Cruz Refinery.
Responsible of the execution the conceptual and Basic engineering of the projects.
 
Manager of the projects for  PDV Caribe in joint with GIPOR.
Responsible of the execution projects the Plants of distribution oil products to builds in the caribbean country in the caribbeans country that signatory of the agreement of energy cooperation through Petrocaribe. Support for development visualization and conceptual and postly development Basic engineering, definition of resources technical scope and coordination with works team in each projects. to verify the execution of the standards of quality, support to it offers it, inspection and construction, reaches and agreements with the client. Support to the Management of Infrastructure of PDV Caribbean.
 
Project coordinator for the deep conversión Project to level the off sites areas.
Responsible of the execution projects Sub Projects associate wings External Areas of the Project Deep Conversion of the General Management of Refinement. Revision of Visualization and completation of the Conceptual Engineering for later development of the Basic Engineering, Definition of the Resources, Technical Reaches and coordination with work teams assigned to each project, to verify the execution of the standards of quality, reaches and agreements with the client. Support to the Management.
 
Superintendent of Engineering of the Management of Technical Resources of IdeP. 
Responsible for the execution of Operational Projects of the Technical Management of the refinery  and Technical Management of Prosecution of Gas. Definition of the Resources, Technical Reaches and coordination with work teams assigned to each project, to verify the execution of the standards of quality, reaches and agreements with the clients. Support to the Management.
 
Leader of Projects. 
Project Desalation of crude Merey Agreement Phillips. 
Project Increment of Capacity of Storage of crude in PTO. 
Sub Projects: 
Preparation of the Place For the New storage Tanks in PTO. 
EPC Storage Tanks  T-3002, T-3004 and T-3006. 
Civil Work and Electromechanical (OCEMI) associated to the interconnections of the new Systems of pipes with the existent systems in the tanks farm.
 
PDVSA, Management Technique-Dtto North (24/09/2003 up to the 28/02/2004) 
Coordinator of Infrastructure 
Integral project Furrial FN-DTM.
 
Elaboration of Guide of Management of smaller Projects, according to the GGPIC. 
Facilitator of  Guide of Management of smaller Projects, in CIED Maturin. 
 
PDVSA, Engineering and Construction Dtto North-tip of Bush. (01/01/2003 up to 24/09/2003) 
Supervisor of projects (SDP) section of Electromechanical Works I. Oriconsult until the 16/06/2003 and PDVSA starting from the 17/06/2003. 
Installation Fifth Unit Compressor of Residual Gas Plants Extraction Santa Barbara. 
Recovery of Haulage of C+3 (Propane) in Towers in Plant of Extraction Santa Barbara. 
System of Relief, vent and handling condensed of hydrocarbons in U.P Pirital (Compressor Plants C.O.A. and C.O.T.). 
System of Relief, vent and handling condensed of hydrocarbons in U.P Carito. 
Substitutions of Filters of Glicol. 

Local Availability

Only available in these countries: Venezuela
ADDRESS:
Bella Vista Street, Bella Vista Urbanization Casa # 53,   Puerto La Cruz city, Anzoátegui state, Venezuela, Teléphone: +58-0281-2657234, Cel: +58-0416-6811216.

my mail:covaw64@gmail.com
Profileimage by WILLIAM COVA Project Manager from Puertolacruz Project Manager
Register