IC

Ireneusz Cwir

available

Last update: 12.09.2017

MM/WM/EWM Consultant

Company: Ireneusz cwir
Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Limited professional) | Polish (Native or Bilingual)

Keywords

Attachments

cv-ireneusz-cwir-en.doc

Skills

- good knowledge of MM (8 full cycles + 3 roll-outs + 4 upgrades + support)
- good knowledge of WM (5 full cycles + 2 roll-outs + 1 upgrade + support)
- EWM implementation – 1 project
- SD (basic configuration, main processes: 1 full cycle + 1 upgrade + support) - LE-TRA Transport (1 full cycle)
- Logistic Execution – selected functionalities as part of all projects

Bar codes:                           
Good knowledge of pallet identification (EAN/GS1 logistic pallet label), Odette shipping labels in automotive.
Five full implementations of bar codes printing and scanning (Zebra and Intermec printers; Symbol/Motorola/Zebra and Intermec RF terminals). Configuration of WebSAPConsole and ITS Mobile.
Several small support projects involving bar codes, Storage Units or HUM.

Data take over:                 
Good knowledge of LSMW and standard SAP’s programs; non-standard ABAP programs preparation (BAPI, batch-inputs)
EDI / IDOC / ALE:              
Good knowledge (4 full cycles + 1 roll-out) including blueprint, customizing, development and administration. This covers:
- orders, shipping notifications and invoices with customers
- orders and invoices with vendors
- interface with distribution centres/3PLs (several message types)
Basic knowledge of SAP Business Connector 4.6 and SAP PI/XI
ABAP programming:        
Good knowledge covering preparation of reports, dialog transactions, enhancements, BAdi, BAPI, RF terminal transactions, XML handling, debugging, SQL optimization. Object oriented programming.
Functional and technical specification preparation.
SAPscript and SMARTforms:      
Intermediate knowledge (forms preparation, modification of existing ones).
Workflow:                           
Administration, basic development – purchasing documents approval, incoming invoice verification.
Authorizations:                  
Good knowledge of authorization objects in MM, WM and SD; roles/profiles maintenance.

Project history

06/2016 – 07/2017         Boots Contract Manufacturing (as subcontractor of BCC)
SAP EWM implementation for production plants (in UK and France).  Cosmetics/pharmacy industry – extra requirements resulting from MHRA regulations. Integration of EWM with MM, SD, PP and QM.
  • Workshops with business owners and users, requirements gathering
  • Process flows preparation (MS Visio)
  • Detail design preparation
  • Technical specification preparation for RICEF objects
  • RFC, CIF and data replication setup between ERP and EWM systems
  • ERP and EWM system configuration (batch management, handling unit management, classification, inbound and outbound processes, integration with MM, SD, PP and QM)
  • Label printing configuration and development – SATO printers
  • ITSMobile configuration and RF screens modifications for hand-held terminals
  • Data upload and migration preparation in EWM (input file formats preparation, LSMW preparation, non-standard program preparation)
  • BAdi implementation, SMARTforms modifications
  • Cut-over plan preparation
  • Test scenarios and scripts preparation
  • Unit and system tests
12/2015 – 06/2016         ZCh Siarkopol
Designing and developing interface between SAP R/3 and B2B system based on XML files (master data replication, sales orders creation, orders confirmation sending).
  • Solution / flows preparation
  • XML file formats preparation
  • Interface program preparation in SAP system (full developments)
  • Technical documentation preparation
06/2015 – 05/2016         Volvo Poland
Implementation of WM in a new warehouse area and building extensions for existing WM functionality. Bus manufacturing plant.
  • As-is analysis and documentation (existing solution)
  • Requirements gathering
  • Technical documentation preparation for RF transactions, ODETTE label printing, picking transactions (dedicated to mobile tablets)
  • Developments: RF transactions, label printing (SAPscripts), reports
  • System configuration
  • System tests with HP QC
  • End user training
  • Go-live preparation and data upload (material master data, storage bins)
  • Post go-live support
2012 – 2015       Kraft Foods / Mondelez
Commercial area / Order To Cash (WM, SD, MM) support team lead for EMEA region. Cooperation with offshore teams.
  • Knowledge transfer preparation to offshore team
  • Direct end user support
  • New requirements verification
  • Participation in change management process – impact analysis, Change Authorization Board meetings
  • Coordination of offshore support team (tickets monitoring, tasks assignment – BMC Remedy software)
  • Verification of solutions provided by offshore team
  • UAT results verification in HP QC
2014-2015           Sun Garden
WM implementation for a new warehouse in production plant. Enhancements preparation.
  • As-is analysis and documentation (old existing solution)
  • Workshops with business owners and users, requirements gathering
  • Gap analysis
  • Detail design preparation
  • Blue-print documents preparation
  • Functional specification preparation for RF transactions and enhancements
  • WM system configuration (storage unit management, inbound and outbound processes, integration with MM, SD and PP)
  • RF transactions development
  • Test scenarios and scripts preparation
  • Unit and system tests
  • Data upload preparation (preparation of input file formats, LSMW)
  • Go-live preparation and data upload (material master data, storage bins)
  • Post go-live support
2013      Valeo Service Polska
WM project – expert consultant on customer’s side for Decentralized WM implementation in distribution company.
  • SAP project methodology presentation
  • Blue print and processes verification
  • GAP analysis
  • Verification of functional specifications (extensions – RF transactions, user exits)
2012      Zelmer SA
Implementation of purchasing processes based on MRP, contracts and scheduling agreements in production plant.
  • Blue print preparation
  • System configuration: contracts and scheduling agreements, approval process, consumption based MRP
  • Printouts preparation (SMARTforms)
  • Purchasing data upload
  • Go-live preparation and post go-live support
2011      Kraft Foods Polska
Migration / roll-out of Cadbury Poland to Kraft’s environment in WM area. New system was based on DWMS with HUM, batch management – food production.
  • Core process verification and GAP analysis
  • 3PL interface implementation (EDIFACT standard)
  • Label printing and RF scanners environment preparation (hardware setup, software installation and configuration on RF terminals)
  • End user training
  • Data migration from legacy to new SAP system
  • Post go-live support
2006 – 01/2011 Cadbury Wedel – MM, WM and SD
Several projects in food industry:
  • Implementation of MM, WM and SD in a new green field factory
  • Implementation of LE-TRA
  • Roll-out of Cadbury’s European platform to another plant in Poland (MM and WM)
  • Interface to 3PL provider – dedicated flat files
  • Interface to mobile sales solution (support of sales processes)
  • EDI interface with customers (incoming orders, outgoing invoices)
Post go-live / business as usual support for above implementations (MM, WM and SD).
  • As-is analysis and documentation (existing solution)
  • Workshops with business owners and users, requirements gathering
  • Gap analysis
  • Detail design preparation
  • Blue-print documents preparation
  • Functional and technical specification preparation for many reports, user exits, enhancements, interfaces, SMARTforms
  • Developments including reports, BAPI, BAdi, SMARTforms, SAPscripts and Workflows
  • MM, SD and WM system configuration (storage unit management, UM, inbound and outbound processes, integration with finance)
  • Label printing configuration – Zebra printers
  • WebSAPConsole installation and configuration
  • RF transactions preparation
  • Test scenarios and scripts preparation
  • Unit and system tests (HP QC)
  • End user training
  • Data upload and migration preparation (preparation of input file formats, LSMW, non-standard conversion program)
  • Post go-live support
  • Workflow implementation and administrations (purchasing documents approval, invoice verification)
  • EDI interfaces implementation and administration
05/2005 – 11/2005         PTC
System upgrade form 4.5B to 5.0 in MM area.
  • Initial delta workshops and key-user training
  • As-is analysis (existing solution)
  • Additional requirements verification
  • Customizing adjustments
  • Developments adjustments
  • Test scenarios and scripts preparation
  • Unit and system tests
  • Post go-live support
03/2005 – 02/2006         TORFARM
Implementation of MM module as leading consultant in pharmacy retail company. IS Retail implementation.
  • Initial workshops and key-user training
  • Workshops with business owners and users, requirements gathering
  • Gap analysis
  • Detail design preparation
  • Blue-print documents preparation
  • Functional specification preparation for enhancements
  • Functional and technical specification preparation for interface to external warehouse and transportation planning system
  • MM system configuration (purchasing, inventory management, automatic postings, invoice verification, batch management). Integration with SD.
  • Test scenarios and scripts preparation
  • Unit and system tests
  • End-users documentation preparation and end-users training
  • Data conversion and upload
  • Go-live preparation and post go-live support
03/2004 – 03/2005         Roto Frank
MM module implementation as leading consultant for production factory
  • Initial workshops and key-user training
  • Workshops with business owners and users, requirements gathering
  • Gap analysis
  • Detail design preparation
  • Blue-print documents preparation
  • Functional specification preparation for enhancements
  • MM system configuration (purchasing, inventory management, automatic postings, invoice verification, batch management). Integration with SD, PP and QM.
  • Test scenarios and scripts preparation
  • Unit and system tests
  • End-users documentation preparation and end-users training
  • Data conversion and upload
  • Go-live preparation and post go-live support
03/2004 – 08/2004
Several projects covering system extensions resulting from access of Poland to European Union. Projects covered:
  • Tax codes setup in purchasing and sales for VAT reporting
  • Pricing procedures adjustments for reporting purposes
  • Processes and system adjustments for proper INTRASTAT preparation
  • Intrastat declaration printing and XML file generation
Implementations done for the following customers:
  • British America Tobacco Polska
  • DaimlerChrysler Automotive Polska
  • Cadbury Wedel
  • Ecolab
  • Danfoss
  • LEK
  • Jelfa
  • Logstor
  • GU
07/2003 – 12/2003         Prettlnoma Systems Polska
Rollout of MM and WM to Polish plants.
  • Core process verification and GAP analysis
  • Polish SAPscripts preparation
  • System tests
  • End user training
  • Data migration to SAP system
  • Post go-live support
07/2003 – 12/2003         Siemens Sp. z o.o.
Implementation of EDI messages with core customer based on XML format (orders, confirmations, invoices). Digital signature of electronic documents implementation (private keys stored in smart-cards).
  • Requirements verification on both sides
  • Solution preparation – blue-print
  • Developments preparation (EDI messages, digital signature)
  • Infrastructure preparation
  • Post go-live support
01/2003 – 12/2003         Glaspol Sp. z o.o.
SAP R/3 system support (MM area) and support coordinator for all modules.
  • Support: requirements gathering, system configuration, functional specification for developments preparation, report modifications (ABAP)
  • Coordination – tickets monitoring, tasks assignment, resources booking, invoice preparation
01/2003 – 12/2003         Siemens Sp. z o.o.
SAP R/3 system support in MM and WM area.
  • Tickets monitoring (Remedy)
  • Requirements gathering
  • System configuration
  • Functional specification for developments preparation
  • Developments (reports, SAPscripts)
02/2002 – 01/2003         Siemens Sp. z o.o.
Implementation of MM and WM modules in distribution company.
  • Initial workshops and key-user training
  • Workshops with business owners and users, requirements gathering
  • Gap analysis
  • Process flows preparation (MS Visio)
  • Detail design preparation
  • Functional and technical specification preparation for WRICEF objects
  • Interfaces preparation to external applications (product master data, prices)
  • EDI implementation with vendors
  • MM and WM system configuration, integration with MM, SD and PS
  • Test scenarios and scripts preparation
  • Unit and system tests
  • End user training
  • Data take over (preparation of input file formats, LSMW, non-standard conversion program)
  • Cut-over plan preparation
  • Go-live preparation and post go-live support
02/2001 – 12/2001         Tenneco Automotive Polska Sp. z o.o.
Implementation of MM and WM modules in automotive industry.
  • Initial workshops and key-user training
  • Workshops with business owners and users, requirements gathering
  • Gap analysis
  • Detail design preparation
  • Functional and technical specification preparation for WRICEF objects
  • EDI implementation with vendors (including JIT related messages)
  • MM and WM system configuration, integration with MM, SD and PP
  • Test scenarios and scripts preparation
  • Unit and system tests
  • End user training
  • Data take over (preparation of input file formats, LSMW, non-standard conversion program)
  • Cut-over plan preparation
  • Go-live preparation and post go-live support
09/2000 – 08/2001         BSH Sp. z o.o
Project coordinator for rollout of financial modules from Germany to plants in Poland.
  • Project resource management
  • Schedule preparation
  • Project progress verification
  • Project costs monitoring, financial reporting
06/2000 – 07/2000         Relpol
System upgrade from 3.0F to 4.6C in production plant.
  • Initial delta workshops and key-user training
  • Customizing adjustments
  • Developments adjustments
  • Unit and system tests
  • Post go-live support
03/2000 – 04/2001         Naftobazy Sp. z o.o.
Coordination of project tasks during the second phase of implementation (SD extensions).
  • Project resource management
  • Schedule preparation
  • Project progress verification
  • Project costs monitoring, financial reporting
03/1999 02/2000         Naftobazy Sp. z o.o.
Implementation of MM module in oil industry (23 plants/locations in Poland).
  • Initial workshops and key-user training
  • Workshops with business owners and users, requirements gathering
  • Detail design preparation
  • Functional and technical specification preparation for WRICEF objects
  • MM system configuration, integration with SD
  • Test scenarios and scripts preparation
  • Unit and system tests
  • End user training
  • Data take over (preparation of input file formats, LSMW, conversion in MS Access)
  • Go-live preparation and post go-live support
06/1998 – 02/1999         Cadbury Poland – MM
Support of MM and WM area in production plant (food industry).
  • Tickets monitoring
  • Requirements gathering
  • System configuration
  • Functional specification for developments preparation
01/1998 – 12/1998         ZWUT S.A.
Implementation of MM and WM in production plant.
  • Initial workshops and key-user training
  • Workshops with business owners and users, requirements gathering
  • Detail design preparation
  • Functional and technical specification preparation for WRICEF objects
  • MM and WM system configuration, integration with SD
  • Test scenarios and scripts preparation
  • Unit and system tests
  • Data take over (preparation of input file formats, LSMW, conversion in MS Access)
  • Go-live preparation and post go-live support
09/1998 – 07/1999         Relpol
Implementation of MM module in manufacturing plant.
  • Initial workshops and key-user training
  • Workshops with business owners and users, requirements gathering
  • Detail design preparation
  • MM system configuration, integration with SD and PP
  • Test scenarios and scripts preparation
  • Unit and system tests
  • Data take over (preparation of input file formats; standard and bespoke programs)
  • Go-live preparation and post go-live support
08/1998 – 06/2000         Raab Karcher Energy Services
System upgrade from 2.2 to 3.1 in MM area.
  • Customizing adjustments
  • Unit and system tests
  • Post go-live support

Local Availability

Only available in these countries: Poland
Location: Wroclaw, Poland
Flexible to travel in Europe
Profileimage by Ireneusz Cwir MM/WM/EWM Consultant from MM/WM/EWM Consultant
Register