Profileimage by sandeep koyya SAP SCM conusltant(MM/PP/WM) from

sandeep koyya

available

Last update: 31.08.2023

SAP SCM conusltant(MM/PP/WM)

Company: Birlasoft
Graduation: PGDIE
Hourly-/Daily rates: show
Languages: English (Native or Bilingual) | Hindi (Native or Bilingual)

Attachments

Sandeep-Koyya-Resume_310823.docx

Skills

Education:
  • MBA from NITIE(Tier-1 management institute in India) in SCM and Operations   
Profile Highlights:
  • Proactive professional with around 3 years of experience in Management Consulting in Supply Chain.
  • Solution expert for supply chain challenges in Warehouse Management, Order Management, Transportation Management, Inventory Management, Data Analytics, and Statistical Modelling across big Manufacturing, Aviation, O&G and Retail Industries.
  •  Author of whitepaper in WMS (http://www.birlasoft.com/next-generation-warehouse?view=brochure)
Key Skills:
  • Supply Chain Management and Operations Management, Statistical Modelling, Stake-Holder management, Process Reengineering, Six Sigma (Green Belt) ERP Functional Consulting, Technical Writing, Video Making etc.
Software Skills:
  • Microsoft Visio , MS Office Suite – Word, Excel(VBA), Power Point ,R ,SPSS Modeller, SAP S/4 HANA (MM,EWM), After-Effects, SQL(Basic)
Certification/Training:
 Six Sigma Green Belt, Creative Problem Solving (EDX-Delft University)

Project history

SAP s/4 Hana Material Management , Procure to pay, solution advisory and implementation for trading goods industry, Canada( Onsite)
Challenge :Ref,(Jay khaware,canada,+14163993257)
  • The client’s legacy ERP (SAP B1) suffers from lack of automation elements and efficiency.
  • To fill this gap SAP s/4 Hana has been proposed.
  • The challenge is to define efficient business processes involving material management and procure to pay processes
Solution:
  • Implementation of Materials Management module for the proposed ERP i.e S/4 Hana.
  • The solution includes finalizing master data parameters for enabling procure to pay process.
Material Requirement Planning
  • A forecast based Material requirement planning (VV) has been designed to cater the customer demands.
  • Planning strategy “40” along with forward consumption has been configured as per demand profile and
  • Optimized demand planning by analysing 24 months consumption data and fitting efficient forecast algorithms that led to 20 % improvement in forecast accuracy and implementation in S/4 Hana in forecasting view of material master
  • Optimized inventory by configuring MRP parameters like lead time and safety stock service levels
Pricing procedure
  • Defined pricing procedure for both imports and domestic with chargeable volume concept for freight.
Release strategy and lean processes
  • Maverick spend has been prevented by designing a release strategy and has been implemented to block purchase orders exceeding the threshold purchase order value.
  • Subsequent processes like vendor returns, third party procurement has been designed and implemented
Integration and technical enhancements
  • Enabled integration with other modules like Extended Warehouse Management via inbound delivery confirmation.
  • Defined functional specs for automation in project like Auto EAN generation, Auto French translation etc
Rebate management
  • Rebate management has been configured via settlement management in new s/4 Hana
Documentation
  • Business blue printing, project management, issue resolution, manuals and SOD preparation.
Business process Re-engineering of MRP  in SAP ECC for a Leading Rail Car Leasing Company
Challenge : 
  • The challenge is to minimize working capital in form inventory(Spares) without sacrificing service levels
Solution:
  • The solution is built of Single Echelon Optimization(optimization around Distribution Centre(LDC))
  • Created root cause analysis (RCA) for increased inventory inside the Logistic Distribution Centre (LDC).
  • Several root causes like demand forecast inaccuracy, long supplier lead times increased the Reorder Point (ROP).
  • Supplier constraints like MOQ also contributed to over ordering of inventory. Defined an alert system to prevent MOQ over ordering
  • A solution has been designed based on supplier evaluation and correcting demand forecasting procedure like correction of parameter update like model selection, number of seasons, implementing tolerance range in forecasting view of material master.
  • In transit tracking report has been designed to evaluate the MRP suggestions.
  • MRP type(PD,V2,ND,VV) has been set based on the class of items(A,B,C)
  • Discount sale has been modelled as planned Independent requirements in the new MRP
  • A lot of dead stock was detected ($2 Mn approx.) due to lack of reports and visibility into the warehouse. This has been eliminated by creating deadstock report with value and other parameters
  • Cycle Counting has been re-configured in the WMS and inventory aging report is introduced.
SAP EWM Warehouse Automation advisory  for an Oil and Gas Major Ref,(Jay khaware,canada,+14163993257)
  • Currently working on new Implementation for S4HANA 1610 & 1709– EWM on Fiori Apps and Requirement gathering and discussion with Business Owners during AS-IS and TO-BE workshops
    S4HANA 1610/1709 -EWM configured, Tested and Prepared Scripts and conducted Internal Webinars.
  • Core team member of the Greenfield implementation of SAP project having modules like EWM, TM, GTS, and EHS. Involved in analysis design, POC and development of the solutions. With cross module integration TM, GTS, APO, EHS, SD, PP, QM etc.
  • Part of the design and architecture of advanced production integration in EWM. used standard APIs for custom solution, developed RFC enabled function module to integrate with process instruction (PI) sheet of PP module
  • Worked in setting up of ERP EWM interface, enterprise structure, master data and objects for delivery mapping
  • Design complex Inbound processes including for bonded ware house deconsolidation, quality inspection, put away as per the EHS and GTS norms,
  • Streamline of Outbound process for bonded and non-bonded ware house with TM delivery, cartonization planning, consolidation, wave and 2 step picking, packing, Handling unit management, staging, and loading with TU.
  • Design of Internal warehouse processes bin-bin movements, issue to cost center, scrapping ,slotting, rearrangement, VAS and kitting and reverse kitting, follow on action customer returned, Vendor returned quality rejected products, physical inventory.
  • Designed automatic output determination of all the relevant outputs namely HU label, UN label, MSDS, IBGI and delivery note for outbound process and auto GR and auto WT creation for inbound though PPF automation.
  • Worked the design part of Interface with third party software like XPS and loft- ware for the different type of label.
  • Obtained EWM official MFS training EWM210, Working on MFS project in automated warehouse in Canada
  • Design of custom Z reports for the print frame work and shipping and receiving process Moderate debugging skill including ABAP object oriented class and interface.
SAP MM Support And Vendor Evaluation Strategy For Leading Automotive Servicing Company, Canada,Ref,(Jay khaware,canada,+14163993257)
  • Implementation of vendor evaluation strategy in SAP ECC
  • Definition of vendor main criteria, sub criteria, weightage and reporting
  • Support of daily activities like specifying functional specification for  WRICEF objects, dealing all new configuration aspects, business process mapping etc. in SAP
  • Enhancement of Purchase order layout with custom fields and release procedure for purchasing documents
  • Implementation of  third party (K) mode of procurement in SAP ECC
  • Customizing of enterprise structure like Plant, Storage Location, Purchasing Organization and Purchase Groups
Mass update of master data in material master, vendor master and purchase documents.

Local Availability

Only available for remote work
Had a canadian /us visa
Profileimage by sandeep koyya SAP SCM conusltant(MM/PP/WM) from SAP SCM conusltant(MM/PP/WM)
Register