Profileimage by Anonymous profile, Contract Administrator, Cost Estimator Supervisor, Procurement, Contract Administrator/ Procurement
available

Last update: 06.09.2022

Contract Administrator, Cost Estimator Supervisor, Procurement, Contract Administrator/ Procurement

Graduation: BACHELOR DEGREE. CIVIL ENGINEER
Hourly-/Daily rates: show
Languages: English (Limited professional) | Spanish (Native or Bilingual)

Keywords

Procurement Management HVAC Telecommunications Chemical Process Claim Processing Contract Negotiation Management Accounting Instrumentation Fire Alarm Systems Employee Benefits + 21 more keywords

Attachments

Lorna Santos. Eng. 2019.doc
GERENCIA DE PROYECTOS.pdf
ESTIM. DE COSTOS.pdf
TITULO ING..pdf
PRIMAVERA.pdf
ANALISIS RIESGO 2.pdf
NEGO. EFECT.pdf

Skills

Selection Process, Bid Packages Preparation, Bid Commercial Evaluations, Contractual Claims. Handling of Change Orders and Contract, Discussion prices contract and Back charges, contract negotiation, Unit Price Contracts, Cost Reimbursable Contracts, Analysis of the wages, hours of work and fringe benefits, rights in the work place, agreement beginning and end dates, Cost Control, meeting minutes, Payments elaboration, Change Procedures Elaboration, The Contract documents preparation.  Escalatory formula. Risk Analysis .Procurement.
Mechanicals Works: On-shore and Off-shore Pipelines, Production Facilities, Flow stations, Compressor Stations, Meter Stations, Pump Stations, Offshore fixed and Onshore Production Facilities, Oil Terminal and Tank Farm, Blow down /Vent / Relief / Flare, Furnace, Boiler, Drumps, Spool, Piping prefabrication and surface Preparation, Refinery Process Units, Petrochemical & Chemical Process Units, Utility Systems, Product Stabilizers, Compression, Gas Dehydration, LNG, LPG Recovery, Oil Dehydration, Oil and Gas Storage, Sour Gas Treating, Water Treating, Temporary Facilities, Heavy Lifting, Security Guards Services, Earth Works, Pipe rack, Civil & Concrete Works, Building Works, Duct Banks, Tailings ponds, Pavements Road, Utility & Sanitary,  Sewer & Drainage Works, Cooling Tower, Electrical Works, Lighting,  Instrumentation Works, Fire  Alarm Systems, Insulation works and dress-up equipment, Communication System.

Project history

01/2012 - 12/2018
Advisor Cost / Procurement- Buyer
Free lance

Administrator contract -PROCUREMENT
Linsay CA .-
- (ENI- REPSOL) . Project Cardon IV (on shore /off shore) Gas Processing and civil works.
- (PDVSA- CNPC Joint venture) Petro Urica project. Heavy oil early production Facilities.
* MONLOSA S.A..
Buildings, civil works. PROCUREMENT
GODI, C.A.
Civil and electrical works. PROCUREMENT

01/2001 - 12/2011
Contract Administrator, Cost Estimator Supervisor, Procurement
Venezolana de Proyectos Integrados, C.A., VEPICA

* " Reconstruction " Edificio sede de Vepica". Guaicay. La Trinidad.
* Treatment Water Plant. Adecuacion de las Tomas del Rio Neveri. HIDROCARIBE
* PREFEASIBILITY STUDY REVIEW JUNIN 240 MPD(Upstream Facilities) Cost estimated Class IV. ENI de
Venezuela. ( SAEP) (ATP)
* Interlocks Systems & instrumentation Security Systems SIS. Detailed/ Basic Engineering Unity 12
and 31" Petrozuata, S.A, Jose Refinery. Anzoátegui Stated. Cost estimated Class II.
* PRE-FEASIBILITY STUDY OF JUNIN 5 BLOCKS PROJECT. CAPEX.-OPEX Cost estimated class V. ENI of
Venezuela
* Preparation of Bid Package for Electrical Station for Reconvertion Deep Project.
* Pre- Feasibility Study -Economic Study, Rail & Section Plant Project, Sensibility Analysis, EP
Rieles y Perfiles Company
* SINCOR Enhanced Oil Recovery (EOR) facilities" cost estimate class IV and class II phase Pre-feed
and Feed
* Long lead Item Equipments of the Teak Blowdown Project. Repsol E&P T&T Limited. Trinidad &
Tobago.
* Main Station Upgrade Project. MSUP: Sincor. Cost Estimated Class IV & II. 2007
* POUI WATER TREATMENT OPTIONS. Platform Off shore. Repsol--Cost Estimated
* TSP LIQUID METERING SYSTEM. Platform Off shore. Repsol--Cost Estimated
* WATER DISPOSAL AT TEAK E. Platform Off shore. Repsol--Cost Estimated
* TEAK COMPRESSOR DISMANTLING. Platform off-shore -Cost Estimated.
* TEAK BLOWDOWN. Platform. Repsol Cost estimated Off shore. 2006
* Cost Estimated, Elaboration Budget - CAPEX -REPSOL Trinidad 2007-2011.
* Skid HP. Flare Scrubber. Corocoro. Cost Estimate Class IV.CONOCO- PHILLIPS.
* Maintenance Plan 2007 for Sincor Plant. 2005. SINCOR
* Cable Monopole Replace .Electric Plant. Pueblo Viejo. CNPC -PDVSA
* Boiler and Fuel oil Adecuation & dispatch fuel System .PEQUIVEN
* Guajira Association Contract Extension. CHEVRON TEXACO
* Engineering Detail Flow Station EF-LL-77-1. CHEVRON- TEXACO
* Detail Engineering for The application of Fireproofing in Delayed Coking Unit 1300, 1400, 1500
1600 SINCOR.
* Free water Separator Pilot Modification. SINCOR
* Orifuels Sinoven,S.A. Orimulsion Project Plant. Sinovensa. Contract Administrator
* Valcor Plant Project -PDVSA-Chiyoda Corporation JCG-Vepica-Jantesa. Consortium Valcor . Contract
Administrator
* Basic design for the Field Facility System & Dehydration Desalting Plant Project - Sinovensa
* EPC for new Jose Shipping Terminal Project - TEJ Project - Ameriven
* PTO Desalting Plant (PDVSA)
* Pumping and Tank Increment Capacity Project for PTO Tank Farm PTO (PDVSA)
* Conceptual and Basic Engineering for Production Facilities, Maturìn (PDVSA)
* EPC Project for the Segregation Manifold and Gas Treatment Facilities, Muscar. (PDVSA)
* Basic Design for the Naphtha Hydrotreater Plant at CRP (PDVSA)
* Water Production Treatment for Production Main Station (SINCOR)
* Basic Design for the Diluents Pipeline COB - PTO (AMERIVEN)
* Basic Design for the Gas Pipeline COB - GUICO (AMERIVEN
* Bid preparation of Revamp Refinery Talara-Peru
* Increase Storage Pump ages Capacity PTO (Heavy Oil). (PDVSA)

01/2000 - 01/2001
Contract Administrator/ Procurement Coordinator
OTEPI; EPC the Plant LASMO (LASMO)

* Reconstruction & Supervision the "Teresa Carreño Theater"
* Detail Engineering and Consulting Upstream Sincor (SINCOR).
* EPC the Plant LASMO (LASMO).

01/1999 - 12/2000
Contract Administrator/ Cost Adviser
Bovis Lend Lease; Australian Company

* Industrial Mega Plant Coca-cola .Karet Project.
* EPC for the Project MOVILNET ( MOVILNET).

01/1994 - 12/1996
Cost Estimating Supervisor & Procurement
INELECTRA

* Revamp Cardon Refinery. Adecuation Refinery Cardon Projects.(P.A.R.C) (MARAVEN)
* HDH Project. ( MARAVEN)
* TAME Project ( PDVSA
* Basic Engineering and Detail Engineering EPC of Petrozuata Office (PETROZUATA).
* Basic Engineering and Detail Engineer EPC Pertilagate Plant (VENCEMOS)
* Petroquimical Platform.Jose.State Anzoategui. ( PEQUIVEN)
* Basic Engineering Treatment Plant. CIPPA ( PDVSA) Conceptual Estimating

01/1993 - 01/1994
Development Manager
DATA-CONSTRUCION

* Cost estimating Software Developed and Database Unit Price Analysis, material database,
Performance, Productivity, Vendor list, depreciation of equipment.

01/1991 - 01/1993
Cost Estimator Supervisor & Procurement
Venezolana de Proyectos Integrados, C.A., VEPICA; Nabisco La Favorita Plant

Projects: RESILIN, El Tablazo Refinery. Cost Estimated: Site Preparation, Earthworks, Concrete
Structures, Civil Works, Electrical, Instrumentation and Mechanical. Warehouse services, Sanitary
services, Guard services, Building I y II, Mechanical Tanks aluminums, Tanks, Pipe racks, Drilled,
Offices services, Surveys. Studies, Geophysical prospecting, Site preparation, Fireproofing,
Insulation, Painting and procurement.
* Nabisco La Favorita Plant.
* Gas Sweetening Plant. Campo El furrial.
* Bauxite and Alumina Industrial Plant.
* Construction Laboratory C.C.R. Interalumina
* Dehydration Gas Plant. Maturín. Venezuela
* Potability Plant. Chilibre. Panamá
* MTBE Oxigenados Corpoven. Cost Estimated: earthworks and civil works. Tanks foundations.
* Elaboration of cost Estimate program.
* Bid of ECOPETROL Company. Colombia

01/1990 - 01/1991
Contract Administrator
Banco Interamericano de Desarrollo

* Projects: Regional del Centro System, Concrete Structures, Civil Works, Highway Bridge,
Mechanical, Pumps, pipe 12 "to 56", Treatment Plant, Sanitary services, Guard services, tanks,
Surveys Studies, Geophysical prospecting, Site preparation, Insulation and procurement.

01/1985 - 01/1990
Cost Estimating Supervisor and Inspector
CONTRALORIA GENERAL DE LA REPUBLICA

* Coordinator system Cost (SICOST) Elaboration Price Unity Analysis: Civil Works, Highway Bridge,
Mechanical, Sanitary, Electrical, Site preparation, Road Pavement
* Inspector Engineer of different civil work

Local Availability

Only available in these countries: Venezuela
anywhere
Profileimage by Anonymous profile, Contract Administrator, Cost Estimator Supervisor, Procurement, Contract Administrator/ Procurement Contract Administrator, Cost Estimator Supervisor, Procurement, Contract Administrator/ Procurement
Register