Yhon Garcia available

Yhon Garcia

Design Systems, storage, pumps, piping, equipment installation, engineering project.

available
Profileimage by Yhon Garcia Design Systems, storage, pumps, piping, equipment installation, engineering project. from DiegoBautistaUrbanejaAnzoteguiVenezuela
  • 6001 Diego Bautista Urbaneja, Anzoátegui, Venezuela Freelancer in
  • Graduation: Mechanical Engineer
  • Hourly-/Daily rates:
  • Languages: English (Limited professional) | Spanish (Native or Bilingual)
  • Last update: 17.12.2020
KEYWORDS
PROFILE PICTURE
Profileimage by Yhon Garcia Design Systems, storage, pumps, piping, equipment installation, engineering project. from DiegoBautistaUrbanejaAnzoteguiVenezuela
ATTACHMENTS
CV - YHON GARCIA

You need an account to view this information.

SKILLS
Develop of Front End Conceptual, FEED and Detail Design.
Knowledge of all aspects of Piping and Layout for complex onshore facilities.
Familiarity with CIS, codes and standards and design experience.
Preparing SOW for contractors and monitoring progress and preparation of deliverables.
Reports to the Project Manager and responsible for overall control of AISTS ’s QC activities, implementation of Project Quality Management
Knowledges in AutoCAD for 2D and 3D part and assembly modelling, layout and design and working AutoCad.
Excellent communication skills in English with the ability to engage and work effectively with team players from various cultures.
Proactive, flexible and dedicated team player, able to achieve goals.
PROJECT HISTORY
  • 01/2019 - 05/2019

    • CONSORCIO PALDACA
  • Construction Supervisor
  • ? CONSORCIO PALDACA, C.A. / Puerto La Cruz, Anzoátegui
    Planning, control and monitoring of work for the construction of an expansion loop in the 8" gas line.
    Budget control. OSHA Compliance.

  • 10/2016 - 09/2018

    • CONSULTORES DE ORIENTE, C. A. (CONORCA)
  • Mechanical Leader
  • ? CONSULTORES DE ORIENTE, C. A. (CONORCA)| Lecherías, Anzoátegui
    Internal review and approval of engineering technical documents. Verification of compliance with
    national and international design standards. Supervision of the development of the electronic model.
    Interdisciplinary meetings. Presentation of progress reports.

  • 10/2010 - 07/2016

    • PDVSA, S. A. OFFSHORE DIV.
  • QA/QC Engineering Supervisor
  • ? PDVSA, S. A. OFFSHORE DIV. | Cumana, Sucre
    Follow-up to the implementation of the Quality Management System (ISO 9001-2008). Monitoring and
    Control of Quality Management in Engineering and Construction. Equipment Inspection (LTE), FAT
    Testing, SAT. Presentation of progress reports. Document Control. Verification of compliance with
    National and International Design Standards. Review and Approval of Engineering Technical
    Documents. EPS Plant Commissioner Early Production System (PAGMI). Verification of documentation
    for the formation of the Mechanical Engineering and Completion Dossier.

  • 08/1997 - 09/2010

    • DOSANCA, C.A. / GPAT CONSULTORES GENERALES, C.A.
  • Project Manager
  • ? DOSANCA, C.A. / GPAT CONSULTORES GENERALES, C.A. |Caracas, Dto. Federal
    Marketing. Kick-off meetings and start-up. Elaboration of technical and commercial offers. Budget
    management. Presentations to management. Execution of high-impact projects (short time - reduced
    budget). Communications. Project planning, monitoring and control. Evaluation, selection and
    recruitment of staff. Implementation of quality policies. Preparation, review and monitoring of
    valuations. Change control. Review of construction strategies. Filing claims. Hiring third parties.
    Material logistics. Start and close five concurrent projects.

  • 12/1987 - 08/1997

    • GPAT CONSULTORES GENERALES, C.A. / VEPICA, C.A. / YHON DESING, C.A.
  • Project Manager
  • ? GPAT CONSULTORES GENERALES, C.A. / VEPICA, C.A. / YHON DESING, C.A. | Caracas, Dto. Federal
    Preparation of engineering documents (specs, data sheets, calculations, drawings, Isometrics,
    requisitions, bills of materials, metric calculations, cost estimates). Design of piping systems, pumping,
    storage, fire, drainage, air conditioning and services. Operation and maintenance manuals.
    Application of national and international design standards. FAT and SAT tests. Inspection of equipment
    and materials.

  • 04/1987 - 10/1987

    • GERENCIA Y CONTROL DE INGENIERIA, S.A. (GYCSA)
  • QC Inspector
  • ? GERENCIA Y CONTROL DE INGENIERIA, S.A. (GYCSA) | Caracas, Dto. Federal
    Inspection of mechanical installations in buildings.

  • 08/1985 - 12/1986

    • METALMECANICA MACUMA, C.A.
  • Construction Foreman
  • ? METALMECANICA MACUMA, C.A.| Mariguitar, Sucre
    Construction in workshop and factory installation of food processing equipment. Metric computations.
    Procurator of equipment and materials. Operational tests. Start-up and start-up.

  • 03/1984 - 04/1985

    • GRANOS BARQUISIMETO, SRL (GRABAR)
  • Production Assistant
  • ? GRANOS BARQUISIMETO, SRL (GRABAR) | Barquisimeto, Lara
    Time study for packaging line optimization and grain storage.

  • 07/1982 - 02/1984

    • WARCHAUSKY & CARTAYA, C.A. (WARCA)
  • Regional Manager
  • ? WARCHAUSKY & CARTAYA, C.A. (WARCA) | Barquisimeto, Lara
    Control and monitoring in projects for the installation of air conditioning systems for hotels and
    shopping centers, complying with the estimates of cost, quality and time. Valuations and updating of
    technical documents.

GET IN TOUCH

Message:

Sender: