Profileimage by Sadiq Sadi Data Entry,  Power Point Developer, from Jhang

Sadiq Sadi

available

Last update: 18.03.2020

Data Entry, Power Point Developer,

Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Native or Bilingual)

Attachments

CV.pdf

Skills

Objective 
           I’m highly motivated and encouraged student of Engineering.  To utilize my expertise in the field of electrical engineering and implement my innovative ideas and creative mind towards the area of specialization. 
 I am a well-motivated student of engineering, and many new ideas are based on ensuring the positive results of selected jobs. During the course of my undergraduate study I was exposed to various courses with applications Engineering Analysis, High Voltage Engineering, Modern Control Systems, Power Electronics, Fields and Network Theory, Power System Economics and Planning, Internet Technologies. I have done my final year Research project “GSM base Energy Meter Billing”. I am fond of exploring the science and planning to devote my life for research work in the field of Electrical. I have completed my undergraduate studies in Electrical Engineering from University of Engineering and Technology Lahore, Pakistan with CGPA 3.500 out of 4.00. Our major subjects were Power system Analysis, Power system Protection Techniques, Renewable energy, embedded system, Power Electronics and Process instrumentation & Control. I did final year projects with the group of two members like; “Traffic Density Control System” and I was made group leader. While works on these projects I found well motivation in myself towards graduate study and research in the field of power system and its automation. I have also did 3 Years Diploma of Associate Engineering (DAE) in Electrical Technology from Punjab Board of Technical Education Lahore, Pakistan in 2014. 
 I have learned and practically applied the applications of power system automation along with the maintenance process of extra ordinal knowledge about power system devices such as Digital Relays, ALS & OLS system, DCS System, Vacuum & oil circuit breakers, Motors control system, Boiler protection, Auxiliary system, Transformer protection system, Synchronizing and load sharing with WAPDA. There is a fully automated control room for monitoring and controlling the power plant different parameters. There my curiosity arose about the working of power system and I decided to learn more advance knowledge about this field. Now my objective is to purse career in the field of Artificial Intelligence. 

Project history

Local Availability

Only available in these countries: Pakistan
Profileimage by Sadiq Sadi Data Entry,  Power Point Developer, from Jhang Data Entry, Power Point Developer,
Register