Profileimage by Ulf Schiebener Direktor SW und KI basierter Systeme from BadHomburg

Ulf Schiebener

available

Last update: 06.09.2022

Direktor SW und KI basierter Systeme

Company: DS-Control
Graduation: Dipl.-Ing.
Hourly-/Daily rates: show
Languages: German (Native or Bilingual) | English (Limited professional) | Portuguese (Limited professional)

Attachments

Profile 2019 english.pdf

Skills

KI gestützte Modellbildung, Transformation Digitalisierung in Industrie, Automotiv und Big Data

Siehe dazu: kimetis.de

Project history

03/2020 - 03/2020
Planning Engineer

Project as employer

01/2019 - 03/2020
Senior Managment
Continental Corporation

Managment

Since 01 / 2019 Initial start of a completely new concept by BMW
Automotiv between the Cluster Instrument and Infotainment
unit as one part. The challenge about the project
Continental Corporation MGU21/IDC22 is, to combine Infotainment features
with safety relavant funktions in one unit together.
Senior Managment The task here is to coordinate the Continental
relevant SW parts in a multicore Autosar and Linux
environment, with different Tier 1 supplier.

Find SW agreement between all Tier ones
Ensure all legal aspects
Determine milestones and identify with
architects all SW relevant modules partsProfile Profile
Built a resource plan, rampup international
teams, Kick off
Lead the AC Elektrobit Autosar part in a
safety ASIL B environment
Find for all GC SW relevant modules parts a
meeting structur, based of a Yocto Linux file
system
Built Scrum teams based on Agile Safe
Manage structure of Git-HUB (Codecraft /
BCI)
Define JIRA tracking system with customer
interface
Handle different HW variants in one project,
setup of a flexible built Toolchain
Ensure all HLF and Requirments, assign User
Stories
Examine all security aspects
Define SW delievery packets in PDX format

01/2019 - 03/2020
Senior Managment Solution Manager
Continental Corporation

Rampup Teams, Resource planing,
coordination
Share with Audi and VW new concepts,
define new innovationsProfile Profile
Coordinate third party supplier
Project budget estimations
Determind about milestones and planning
Define the workflow for a delivery process
together with VW, Datamanager (API), VW
HMI Toolchain and AU - HMI eSolution
Responsible to ensure the ASpice / safety
criteria
Find solutions in complexed technical
problems
Plan with the customer new HMI ADAS
concepts
Requirmentsengineering and ensure the
project managment handling (QA)
Decided SW API Sync deliveries
Planning of prototypes / ABC samples
Preparation of series production, Gate
Maturity Process
Strengthening international cooperation
Improvement the workflow processes in
JIRA

09/2016 - 09/2017
global SW Manager
Continental Corporation

Managment

09 / 2016 - 09 / 2017 For VW /Audi I am the global SW Manager of the
Automotiv MQB FPK full display cluster instrument developing

Continental Corporation Coordinate cross function teams
International team coordination in Singapore
Global PM / Timisoa / Malaysia / Vietnam and German
Solution Manager locations (resource planning)
Share with the customer new concepts,
define new innovations
Coordinate third party supplier
Project budget estimationsProfile Profile
Determind about milestones and planning
Find solutions in complexed technical
problems, chaos manager
Responsible to ensure the ASpice / safety
criteria
Plan with the customer new ADAS concepts
Improve the work process in Scrum based
teams
Requirmentsengineering and ensure the
project managment handling (QA)
Decided SW integration strategy
Risk managment of technical concepts
Planning of prototypes and samples
Preparation of series production
Interview candidates to join the team
Improvement of workflow processes in
terms of trainings

02/2015 - 09/2016
Project lead regarding a new cluster instrument
Automotiv; Continental Corporation

Freelance Managment

02 / 2015 - 9 / 2016 Project lead regarding a new cluster instrument
Automotiv project for the customer BMW. Coordination and
controlling of an international team with a team
Continental Corporation size more than 110 members. Strongly ensure to
hold the quality and milestones
Global PM
Taskforce lead International teambuilding in Mexiko /
Singapore / Timisoa / Egypt / German
locations

Communication officer between customer /
Vice President and the developer team
Negotiate about milestones and planning
Controlling of error ticket handling
Requirmentsengineering, compliance about:Profile Profile
safety ASIL skills/ tracability/ quality and
documentation
Time scheduling about SW integration
strategy
Fast understanding of complex technical
problems (process architecture)
Direct contact to the chip supplier NXP
Responsible about the development third
suppliers
Assess HW errata consequences
Planning of prototypes and samples
Direct contact to the SW test team: system
test, integration test and PVV
Preparation to start the series production
Management presentation skills
Intercommunication part between CDS and
CES (Conti internal engineering service)

11/2010 - 05/2011
Corporate Firmware
Jenoptik Robot GmbH

Traffic engineering CAN-Boot-loaders for a radar traffic sensor. The
SW licence was expired and no code or licence was
Jenoptik Robot GmbH available.
Dept. Sensorik Therefore a variety of analytical processes were
necessary to analyse protocol and data
transmission. The compatibility to the old system
SW-Consulting must be guaranteed 100%.
SW-Development
Corporate Firmware Developing the PC Flashtools by Vector CAN
HW and Visual C
Documentation
Dualprocessor tms320f2812
Development of the embedded SW for
tms320f2812 with Code Composer Studio
von TI
Expanding the range of additional Features




Page 8 of 14




Freelance leading and developing project

07 / 2010 - 05 / 2011 Consulting of a BMW Project Radio 1.2 (PL7) for
Automotive more software stability and adapted tools.
International Consulting for the MIB-E Project
Continental-Corporation (VW/Audi/Skoda/Seat). Script implementation and
Dept. AV (Audio) development for the Lauterbach Debugger.
International presentation und introduction for
optimizing the development process-time.
Development Tooling
SW-Consulting PR-Analysis and implementation of the SW-
SW-Development solution
Freescale Processor: MCF5251
Renesas Processor: SH2 7264
Architecture of the media browsing concept
for compressed files (CD/SD-Card/USB/BT)
Adaptation of the audio-equalizing tool withProfile Profile
Visual Studio 2010
Target stability analysis with Lauterbach
Power Tracer
Presentation of improving methods for the
MIB Project International
Adaptation to the MOST-Audio-connectionmaster

Consulting for error reduction and
optimization for the Romanian staff
Tools: Rhapsody, Doors, Source Insight,
Telelogic Synergie, VS2010, Cygwin, Canoe,
etc.

04/2010 - 06/2010
project developer

Automotive automatically generated Mocca hpp classes for the
NBT (BMW) / MIB (Audi) / NTG5 (Mercedes).
Harman Becker
Concept and planning of the adaption of the
Continues improvement of diagnostic GUI (DCL) for outsourcing and
diagnostic platforms improved developer tools
Jamming within the Mocca-framework for
SW-Consulting the compiling-configuration
SW-Development Creating Diagnostic Requests / Response
through DCL
Optimization and expanding the Multiuserplatform
as GUI in Excel. The complete DCL
tool-framework is based on VBA script and
on the Excel-server as OLE programmed in
C++
Outsourcing of makros in AddIn's in VBA
Further tools: DOORS, Perforce, Mocca,
Araxis, MS-Project

07/2008 - 09/2009
project manager
BMW entertainment systemProfile

Automotive PL2 plus.

Continental-Corporation Architecture und SW development of
Department: Broadcast Coldfire and ST10 processor, based on
Freescale Core und Trio MP3 Codec
Integration of radio diagnostic jobs over
KWP2000 and UDS
Implementation of flash over CAN /
MOST
Adding new SW-loading of extra modules
at radio project including signature check
SW-Architecture Development of MOST-bus F-blocks and
SW-Development shadows
Consulting Further development of Windows based
development tools on Borland C++
Builder
Integrated of SDARS module for digital
satellite radio in USB and DAB for Europe
Implementation of communication
module, design F-block (MOST) for USB
and telephone with Bluetooth
Optimising the OSEK Gateway
processors with FlexOS
Checking all BMW conditions with
standard core 4 and 7
Integration of the alignment of a dice 2
tuner
Tools: Lauterbach Emulator, CM/CS
Synergie, Diab Datacompiler, Tasking
Compiler, Source Inside, Araxis Merge,
CANoe, BMW-Tools, Most Optoanalyzer,
Source Inside
CMMI Level 3
Misra-(QAC) and module check

01/2006 - 06/2008
developer

Telematic vehicles with radio control.
The control unit implementation on an ARM9
DS-Control processors with embedded Linux inside. The
extension of this module is possible with two
New development variants of construction. The first way to transfer
for series-production data over Internet is with GPRS/EDGE. WLAN with
an access point is the other possibility.
Connecting with vehicle CAN-bus system anybody
Project leader can check all dates and measurement values and
SW-Designer / settings. The bus protocol is KWP2000. The
Development integrated web-server shows with HTTP-service all
diagnostic data over TCP/IP.
These projects were coordinated by DS-Control and
cooperate with different SW developer team.

10/2002 - 06/2008
developer
KION Group

Automotive - Telematic system, based of an embedded Microcontroller
C167/XC167 for data recording of a forklift vehicle.
KION Group The unit was stored and transmit all relevant data
(Linde Material Handling) over antenna to a online server. The transmission
system based over GPRS/GSM.
I installed a external company for data reporting. I
coordinate all relevant development processes for a
web based platform.

Project leader C/C++ on C166 Family incl. new XC886
SW-Architect CAN Open driver-development for
SW- Development segmented data transferProfile Profile
Consulting KWP2000 Diagnostic
CAN data based on Vector dB
Adaptation of the controler of the V-Forklift
series 39x (VW Motor) combustion motor
Win32 class development for PC connection
Programming the Config-/Boot-
/Flashsoftware for the μC-System as well as
the PC
Data development through MySQL
CAN Communication for the GPRS/UMTS -
Module
Phyton as Web-Script
CANalyser from Vector
RFID and IButton as access code

05/2005 - 02/2006
developer
Marshall GmbH

Building services dialyse seat will be connected to the building
engineering service engineering. In addition a small radio is
Marshall GmbH accessible with a switch mode for TV.

Atmel Atmega88 / Silicon Labs
Win32 for flash and configuration
SW-Architect Design PCB and circuit-diagram
SW-Development Protocol-development PC/μC
Consulting

12/2000 - 01/2001
Planning Engineer
ZDF

Satellite and Major achievements:
communication Projecting a new satellite up-and-down-link-system
ZDF and developing the existing system.
The satellite station was direct linked to the ASTRA
Satellite-series and included the signal transmission
for analog as well as digital TV channels.

07/1996 - 06/2000
PIC/ Basic-Stamp- Controller
Marshall GmbH

Marshall GmbH development of hardware components as well as
Mr Felix Praetorius the software-programming. These systems have to
operate with a Master/Slave - Bus-system
(RS485).

SW-Development
Consulting

Local Availability

Open to travel worldwide
Profileimage by Ulf Schiebener Direktor SW und KI basierter Systeme from BadHomburg Direktor SW und KI basierter Systeme
Register