Marco Fischer partly available

Marco Fischer

System Enigineer, Consultant Virtual landscapes

partly available
Profileimage by Marco Fischer Senior System Engineer / System Architect from Tutzing
  • 82327 Tutzing Freelancer in
  • Graduation: Dipl. Wirtschaftsinformatik
  • Hourly-/Daily rates:
  • Languages: German (Native or Bilingual) | English (Full Professional) | French (Elementary)
  • Last update: 12.05.2020
KEYWORDS
PROFILE PICTURE
Profileimage by Marco Fischer Senior System Engineer / System Architect from Tutzing
ATTACHMENTS
Profile_M_Fischer_english-1.doc

You need an account to view this information.

OnePager

You need an account to view this information.

CV Stand 2020

You need an account to view this information.

SKILLS
Windows Server 2000/2003/2008/2012
AIX 4.3/5
VMWare ESX 3.5, VSphere 4, 5, VMWare Infrastructure
Lotus Notes/ Domino
Oracle
MS SQL Server
Backup Exec, Legato Networker
Landesk/Altiris/Deskcenter
EMC SAN, Navisphere, Netapp
IBM/HP/DELL Hardware
Unix, diverse Linux Distributionen,
DNS/DHCP/AD/DFS/Oracle/MSSQL/Apache /IPv4/IPv6
Server Windows NT/2000/2003/2003 R2/2008/2008 R2/AIX/FreeBSD/
Client OS Windows NT/98/ME/2000/XP/Vista/7/8
Ubuntu, Suse Linux
PROJECT HISTORY
Project Experience
01/2013-
Project: VMWare concept/AD implementation
Aufgabe:
• VMware ESXi 5.5 concept / sizing / implementation. 5 clusters HP Server Hardware with Netapp storage devices. About 400 VMs
• AD Migration with QMM Service / Server migration Win2003/Win2008










03/2012-12/2012 Getronics/Duerr
Project: Server migration to VMware
Aufgabe:
• VMware ESXi 5 concept / sizing / implementation. 2 clusters in different locations with about 300 Virtual Servers and 10 physi-cal ESX hosts
• Dell Server Hardware with Equalogic storage devices
• Analysis of given server landscape.
• After cluster implementation migration/consolidation of physical servers to ESX cluster
• Service / Server migration Win2003/Win2008
• VMware migration


















08/2011-02/2012 Hewlett Packard / Panasonic
Project: AD migration, Service migration
Aufgabe:
• Service / Server migration Win2003/Win2008
• AD Migration with QMM of 17 sites in EMEA
• Sizing / Implementation / Template design of ESX site clusters emea wide, about 2000 VMs






01/2011- Carefusion
Project: Migration to new domain structure
Tasks: • Prepare migration data
• Dual acl servers, migrate services
• Implement new hardware (riverbed, netapp)
• Coordinate with team
• VMware administration, storage mirror implementation


02/2010-01/2011 Bosch Siemens Haushaltsgeräte Giengen
Project: Serveradministration
Tasks: • Installation w2k8/w2k3 cluster EMEA
• Servicedesk 3rd level
• VMWare Vsphere 4 Administration/Implementation, about 3000 VMs, HP hosts with Netapp storage devices. Storage mirroring between 2 locations.
• Legato Networker
• HP OVO
• SCOM/SCCM



11/2009-01/2010 NTS GmbH
Project: VPN connection, Active Directory Implementation
Tasks: • Definition of Standards
• Domaincontroller installation in Bangkok and Stuttgart
• Clientmigration
• VPN Tunnel between Bangkok and Stuttgart via Watchguard Firebox


10/2008-07/2009 PALL Central Europe
Project: Serverconsolidation, Migration to VMWare 3.5
Tasks: • Evaluation and definition of standards with the projectteam,
• Responsible for Implementation in Central Europe (CE) , Bad Kreuznach, Crailsheim, Dreieich, Vienna, Portsmouth
• CE sites, 5 Cluster in 5 sites










03/2008-12/2008 Pall Europe Middle East
Project: AD Migration of Server 2000 to Server 2003, EMEA , 3000 clients, 40 Domain Controllers, 15 sites
Tasks: • Building a testsite
• Analysis
• Changing domain structure
• Defining standards in Projectteam
• Planning migrationsequence of objects and systems
• Evaluation monitoring
• Installation domaincontrollers
• Clientmigration by location





10/2007-02/2008 PALL Waldstetten/Crailsheim
Project: Site consolidation/ System migration (Waldstetten-Crailsheim)
Tasks: • Move of existing location to new site, integrating systems in ex-isting infrastructure
• Definition of requirements for taking over the systems (File/ printserver/ Lotus Domino, domain controller on Windows 2003)
• Delegating other external consultants





2006-2007 PALL Central Europe
Project: Upgrade/ Installation Lotus Groupware
Tasks: • Upgrade to Lotus Domino 7
• Planning and installation Lotus Domino 7


2005 PALL Deutschland
Project: Clientmigration and Rollout Windows 2000-XP
Tasks: • Rollout 500 XP Clients
• LANDESK (PXE Imaging))
• Clientvalidation XP
• Building a testing environment
• Analysis / Error logging


2003 PALL Crailsheim
Project: Migration NT to 2000 & Client upgrade DE Client & Server
Tasks: • Windows NT-4 auf 2000 migration
• Used Software Microsoft RIS


2004 PALL Crailsheim
Project: ERP System Migration und Upgrade
Tasks: • New hardware platform (F50/P620 AIX)
• Upgrade ERP System und upgrade Oracle to V 8i
• PSI PENTA ERP System on AIX 4.3.3/Oracle 8i









2000-2003 PALL Germany
Project: Responsible for central european helpdesk
Tasks: • Central european User Help Desk for about 1400 Clients
• Incident-, problem- and changemanagement
o Network
o Telephone
o Clients
o Office products
o Hardware
o Exchange (Outlook)
• Linux and Windows server administration
• Server system attendance (updates, patches, configuration)
• 3rd - Level support
• Receiving, priorising and categorisation of customer calls
• Support with remote tools


PALL Central Europe
Special tasks : Trainings VMWare ESX & Active Directory for internal IT
Tasks: • Internal trainings
• Design
• Preparation course materials
TIME AND SPATIAL FLEXIBILITY
fulltime starting may 1st.
GET IN TOUCH

Message:

Sender: