Profileimage by jonathan rodriguez PS Core Project Engineer from Spain

jonathan rodriguez

available

Last update: 23.10.2013

PS Core Project Engineer

Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Full Professional) | Spanish (Native or Bilingual)

Attachments

cv_jonathan_rodriguez_v2.doc

Skills

2G, GSM, GPRS, NSN, 3G, UMTS, HSDPA, LTE, Telecommunications, EDGE, IP, Commissioning, Troubleshooting, Testing, Core Network, Integration, Operation, Switches, Linux, Network Operations, Acceptance, SS7, Unix, Solaris, Unix Shell Scripting, Edge

Project history

TSSI Global Sourcing Solutions
PS Core Engineer
07.2013 - 08.2013
? 100% Responsible of Commissioning and Troubleshooting of TestBed Flexi NG.
Telecommunications


MSI International
PS Core Engineer
04.2013 - 04.2013
? Remote project activity collaboration of 29 GboIP reconfiguration from LRAS Model 2 to dynamic PCU Pooling.
? Report based on KPI & Clear Code query.
Staffing and Recruiting
51-200 employees

MSI International
PS Core Engineer
12.2012 - 02.2013
? Care Activity:
- Tier2 Second Line Maintenance support in Nokia PS Core NE’s.
- Provide support for HW and SW upgrades on NE\'s, out of hours on call support, over the phone or on site support and update and track to resolution Trouble Tickets relating to faults and performance issues.
- Report based on KPI & Clear Code query.
? Project activity:
- 100% Responsible of SAT, upgrade FNG1.0 to FNG 2.0, update FNG2.2.
- 100% Responsible of SAT CMD.
Staffing and Recruiting
51-200 employees

OSC Telecoms & Security Solutions
PS Core Engineer
10.2012 - 12.2012
? 100% Responsible of whole 3G network Cutover of 21 RNCs from 3 Flexi NS-SGSN DX to 1 new Flexi NS-SGSN ATCA full configuration in Cordoba
? 100% Responsible of whole 3G network Cutover of 25 RNCs from 3 Flexi NS-SGSN DX to 1 new Flexi NS-SGSN ATCA full configuration in Buenos Aires.
? 100% Responsible of 2G Rehoming from LRAS model 3 to model 2, Cutover & Expansion between 3 Flexi NS-SGSN DX’s and BSCs.
? Responsible activation LRAS model 1 in one PAPU group on Flexi NS-SGSN DX’s and BSCs.
? 100% Responsible of PAPU Group reconfiguration on3 Flexi NS-SGSN DX.
? 100% Responsible of 30 BSCs Expansion, 42 BSCs GboIP Rehoming from LRAS model 3 to model 2 on 3 Flexi NS-SGSN DX.
? 100% Responsible, Included 1 New RNC, 3 RNC Cutover, 2 Cutover RNC from ATM to IP on 2 Flexi NS-SGSN ATCA.
? Report based on KPI & Clear Code query.
Telecommunications
201-500 employees

Mobile Services International Inc.
PS Core Engineer
10.2011 - 10.2012
? 100% Responsible of installation, commissioning, integration & SAT of one 3G Flexi NS-SGSN ATCA full configuration for Argentine.
? 100% Responsible of HW expansion on Flexi NS-SGSN DX From medium to full configuration, Reconfiguration of PAPU Group and change SMMUs Signaling from S7 to SIGTRAN for Paraguay.
? 80% Responsible of HW expansion on Flexi NS-SGSN DX From medium to full configuration, Reconfiguration of PAPU Group for Uruguay.
? 70% Responsible, Included 2 New BSCs GboIP, 11 BSCs Expansion, 5 BSC Rehoming GboIP from LRAS model 3 to model 2, 4 BSC Rehoming GboFR to GboIP from LRAS model 3 to model 2 on 3 Flexi NS-SGSN DX’s for Argentine.
? 70% Responsible, Included 3 New RNC, 2 RNC Expansion, 2 RNC Cutover, 2 IuCs RNC Expansion on 3 Flexi NS-SGSN DX for Argentine.
? Report based on KPI & Clear Code query.
Staffing and Recruiting
51-200 employees

MSI International
PS Core Engineer
04.2011 - 09.2011
? Project Activities:
- 100% Responsible of 20 BSCs Rehoming from LRAS model 3 to model 2 on Flexi NS-SGSN DX.
- 100% Responsible of 4 RNC Cutover between Flexi NS-SGSN DX.
? Care Activity:
- Tier2 Second Line Maintenance support in Nokia PS Core NE’s.
- Provide support for HW and SW upgrades on NE\'s, out of hours on call support, over the phone or on site support and update and track to resolution Trouble Tickets relating to faults and performance issues.
- Report based on KPI & Clear Code query.
Staffing and Recruiting
51-200 employees

Avion Systems
PS Core Engineer
09.2010 - 03.2011
? * 100 % Responsible New Core IHSPA, of commissioning, integration 3G Flexi NS-SGSN ATCA small configuration.
? * 100 % Responsible New Core IHSPA, of commissioning, integration Flexi NG small configuration.
? ** 100 % Responsible New Core 2G TestBed, of Commissioning, integration Flexi NS-SGSN DX ( GboIP ).
? OJT, Introducing into R8 for MME and S-GW, P-GW. Interfaces: with Diamiter S6a (HLR), S13 (EIR) and GTPv2, S1 (E-UTRAN), S-GW (S11), S10 (MME), Sv (MSC). At BELL LABS.
Information Technology and Services
501-1000 employees

MSI International
PS Core Engineer
07.2010 - 08.2010
? * KPI Consultor.
? Care Activity:
- Tier2 Second Line Maintenance support in Nokia PS Core NE’s.
- Provide support for HW and SW upgrades on NE\'s, out of hours on call support, over the phone or on site support and update and track to resolution Trouble Tickets relating to faults and performance issues.
- Report based on KPI & Clear Code query.
? Project Activities:
- Responsible of integration 2 RNCs & 4 BSCs GboIP.
Staffing and Recruiting
51-200 employees

MSI International
PS Core Engineer
03.2010 - 03.2010
Customer Movistar ( Bogota - Colombia)

KPI Consultor.
Staffing and Recruiting
51-200 employees

Avion System
PS Core Engineer
09.2009 - 01.2010
? 50% Responsible New Core HSPA R7, of 1st PS Call, troubleshooting (DNS, NS-SGSN DX SG7 & FISN 4.0) for SaskTel.
? 50% Responsible New Core TestBed HSPA R7, of 1st PS Call troubleshooting (DNS, LIG4.0, NS-SGSN DX SG7 & FISN 4.0) for Bell .
Information Technology and Services
501-1000 employees

Lemcon
PS Core Engineer
06.2009 - 07.2009
? 50% Responsible New Core HSPA R7, of 1st PS Call, troubleshooting (DNS, NS-SGSN DX SG7 & FISN 4.0) for SaskTel.
? 50% Responsible New Core TestBed HSPA R7, of 1st PS Call troubleshooting (DNS, LIG4.0, NS-SGSN DX SG7 & FISN 4.0) for Bell .
Telecommunications
201-500 employees

Lemcon
PS Core Engineer
12.2007 - 06.2009
Project Activities:
? 80% Responsible New Core HSPA R7 of commissioning, integration, features test and activation for one NS-SGSN DX and one Flexi ISN for Telecom.
? 100% Responsible from R.99 to HSPA R7 for Movistar:
- Flexi NS-SGSN DX: SW upgrade from SG5 to SG6. 3G HW Capacity. HW expansion from medium to large configuration. Reconfiguration VLANs & IPs configuration and enable of 3G functionality. Integration of NSN RNC, Activation of feature DT at Bogota.
- Flexi NS-SGSN DX: SW upgrade from SG5 to SG6. 3G HW Capacity. HW expansion from medium to large configuration. Reconfiguration VLANs & IPs configuration and enable of 3G functionality. Integration of NSN & Ericsson RNC, Activation of feature DT at Cali.
? 100% Responsible New Core TestBed HSPA R7. of Integration, SATs and features activation with different vendors NE’s:Huawei, Ericsson and Cisco for Movistar International.
? 100% Responsible New Flexi ISN: Installation, commissioning & integration at Bogota.
? 100% Responsible New Flexi ISN: Installation, commissioning & integration at Cali.
? 100% Responsible HW & SW Upgrade for Charging Gateway: 1 Admin node, 2 Application node at Bogota.
Care Activity:
- Tier2 Second Line Maintenance support in Nokia PS Core NE’s.
- Provide support for HW and SW upgrades on NE\'s, out of hours on call support on a rota basis, over the phone or on site support and update and track to resolution Trouble Tickets relating to faults and performance issues.
Telecommunications
201-500 employees

Lemcon
PS Core Engineer
07.2007 - 12.2007
? Care Activity:
- Tier2 Second Line Maintenance support in Nokia PS Core NE’s and OSR CISCO.
- Provide support for HW and SW upgrades on NE\'s, out of hours on call support on a rota basis, over the phone or on site support and update and track to resolution Trouble Tickets relating to faults and performance issues.
? Project Activities:
- Collaboration Upgrade from R.99 to HSPA R6.
- Collaboration SAT MVIV integration for 2 SGSN SG6 Iu-CP and Iu-PS with RNC Huawei in Guayaquil.
- 100% Responsible SAT MVIV integration for 2 SGSN SG6 Iu-CP and Iu-PS with RNC Huawei in Guayaquil.
Telecommunications
201-500 employees

Digitel GSM
Junior System Specialist. VAS, GPRS Engineer.
03.2001 - 07.2007
-First Line Maintence support, configuration, O&M of GPRS NE’s Nokia, Firewalls (Checkpoint and PIX) and Cisco IP SW Nokia.
-Provide support for HW and SW upgrades on NE\'s, out of hours on call support on a rota basis, over the phone or on site support and update and track to resolution Trouble Tickets relating to faults and performance issues.
-Another activities: CAPEX/OPEX,planning, implementing, configuration, operation and management of
SMSC, MAR, VMS, RBT.
Wireless


McDonald\'s Corporation
Operation Manager
07.1999 - 12.2000
Management of daily operation.
Restaurants
10,001+ employees

Indra
Technical operator machine
12.1998 - 12.2000
Special technical support of machine
Information Technology and Services
10,001+ employees

UNEXPO
Assistant Teacher
01.1997 - 03.2000
Teacher supplementary of AutoCAD cathedra
Education Management

Local Availability

Only available in these countries: Spain
PS CORE
Profileimage by jonathan rodriguez PS Core Project Engineer from Spain PS Core Project Engineer
Register