OSP Access Site Engineer

North Carolina  ‐ Onsite
This project has been archived and is not accepting more applications.
Browse open projects on our job board.

Description

OSP Access Site Engineer

Client Location: 100% Remote

CTH: 6 months

Rate: Market rate based on experience and word examples

If you are looking for a great opportunity that is 100% remote work please contact me now. Hiring will be through February of 2018.

Required criteria:

  • Must have CTL experience in design and build of Remote sites with an emphasis on Copper
  • Must know CTL Systems- NDS is the most important. We can work around not knowing that but they are not as attractive to the client
  • Must be able to show examples of work

Job Description:

In coordination with the Project Implementation Plan, a Site Surveys to be performed to determine the physical status of the site itself to include a determination of suitability for the installation of the Network Element (NE), required power, cable and conduit placement recommendation, hand-hole locations, stake, pole or H-frame requirements and pedestal placement.

Deliverables include:

  • Complete Site Survey Form template
  • Analyze the site conditions and recommended NE and placement
  • An itemized work task summary for site preparation and NE installation
  • Identify installation issues (ie material delivery issues, gate codes, access restrictions, etc.)
  • Digital photographs of work location (as able)
  • Marked drawings associated with the scope of work will include: Floor, High Cable, Low Cable, Grounding, Power Attributes, DFE, AC, Fiber and Front Equipment
  • Revise redlines to existing CenturyLink drawings as required
  • (New Sites so unlikely)
  • Engineering includes normal permitting (Town, City, County, State)
  • (Carrier handles this part historically)
  • Site Survey includes Telco Co. Meeting and Power Co. Meeting.
  • 911 Address Application as required.
  • Power Company Service Application as required.
  • (Phoenix will Handle this as part of project management)

Unit of Measure - Per Site

Exclusions

  • OSP Systems Engineering
  • No Pole Permit or Wind Loading required (To be priced separately is necessary and agreed to before work commences.)
  • Complex permitting requirements involving Federal, Environmental, Railroad, etc. (To be priced separately and agreed to before work commences.)
  • Assume No Maintenance of Traffic (MOT) Required in Field (No Barricade Plans). (To be priced separately and agreed to before work begins.)
Start date
n.a
Duration
6 Month CTH
From
iStaff
Published at
03.02.2018
Project ID:
1496890
Contract type
Freelance
To apply to this project you must log in.
Register