RAN Engineer

MO  ‐ Onsite
This project has been archived and is not accepting more applications.
Browse open projects on our job board.

Keywords

Description

Please Note: Macau Passport candidates only

Handling WRAN CSR. Daily Operation and Maintenance for RBS 6601 and 6201 W10B with IPRAN. Performing advance troubleshoot in RBS 6601 and 6201 and in RNC with W10B and IPRAN. Performing and monitoring DCH/HS/R99 Inter Frequency Hand Over and Inter Freq Load Share in RAN side and make sure all cells have no drop or performance degradation or make sure there less drop if any degradation. Performing daily operation and maintenance for more than 250 RNC's and more than 21000 RBS & 6201 with 1,5 GHz Frequency) and RBS with 2,1 GHz Frequency) with IPRAN configuration. Performing latest SW upgrade to P7.1.7 and W10B, test and acceptance in the RBS 6000, RBS 3000 and RNC 3810 also RNC 3820. FNI RBS using RRUW with 2 carriers using single DUW, IPRAN.FNI RBS using RRUW with 4 carriers using dual DUW, IPRAN. FNI 96 HS users on RBS on W10b software version. FNI W10b Ericsson latest SW on 3G Platform at RBS , RNC 3810 and 3820. CSR and TR follow up for High Case (HOT CSR and TR) and Medium Case. Performed Black Module Installation (Development SW for RBS and RNC). FNI RBS - W10B EU17) with GPS as Primary Sync References and Sync Over IP as the Secondary. FNI SPB3 in RNC3810 and RNC3820 with W10B Latest Software Version for RNC. Unified IPCAC with W10B Latest Software Version for RNC. FNI CBS (Cell Broadcasting System) in W10b SW level. FNI RNC L2 and L3 Switch and Verification. FNI Iur Over IP between RNC3810 (W10B) and RNC3820 (W11B with GPB75). LTE FDD with RBS6000 (DUL & RUS) Project Support and Troubleshooting.
Start date
ASAP
Duration
1 year
From
Morson International (IT)
Published at
13.02.2013
Project ID:
488567
Contract type
Freelance
To apply to this project you must log in.
Register