09/06/2022 updated


100 % available
SAP- PM, PP, PP-PI & QM Techno Functional Consultant
Bangalore, India
India
Bachelor of EngineeringMicrosoft WindowsDevOpsDOS (Disk Operating System)Enterprise Resource PlanningMicrosoft OfficeRoutingSAP ApplicationsSAP PMSAP R/3Catalogues
SAP PP, PP-PI, PM, QM as functional consultant and 2, MRP, BOM, WC, Resource, Routing, Recipe, PIR, Discrete, Catalogs, Notification, SAP, DevOps, SAP PM, Interface, Integration, PM-PPPM-MM, PM-WM, PM-SD, PM-CO, PM-HR, PM-QM, PP-MM, PP, CR, ERP, ECC 6.0 EHP6, EHP7, EHP8 application, MS-DOS, Windows 98/2000/2003, Windows XP/10, MS Office, Internet Concepts
Languages
EnglishGoodHindiNative speaker
Project history
PROJECT # 3 : IMPLEMENTATION ( CICP-Indian Army)
NAME : e-Tuskers
On ROLE : PM/PP Consultant (L&T Infotech Ltd.)
SCOPE : ECC 6.0 EHP 8
TEAM SIZE 85
DURATION : May'18-Dec'19
CLIENT : Indian Army
Roles & Responsibilities
Worked in ASAP methodology for the structure and systematic Sap Project Implementation.
* I have worked in all the phases of implementation project.
* Collected the objectives from the client in project preparation Phase.
* In the BBP phase most of the part I was involved in documentation work.
* Studied the CSBP documents provided by the core users and participated in the creation of FSBP
documents with suitable solution.
* Finalised integration modules in BBP phase.
* FS preparation-Forms, Reports, Enhancements.
* Configured the settings required for creation and maintaining data in BOM, Workcenter, Task list,
Equipment Master, Functional location Maintenance Plan, Notifications, Order types, Routing, MRP
Parameters
* Knowledge on Integration of PM-PP, PM-MM, PM-WM, PM-SD, PM-CO, PM-HR, PM-QM, PP-MM, PP-
SD, PP-HR, PP-CO.
NAME : e-Tuskers
On ROLE : PM/PP Consultant (L&T Infotech Ltd.)
SCOPE : ECC 6.0 EHP 8
TEAM SIZE 85
DURATION : May'18-Dec'19
CLIENT : Indian Army
Roles & Responsibilities
Worked in ASAP methodology for the structure and systematic Sap Project Implementation.
* I have worked in all the phases of implementation project.
* Collected the objectives from the client in project preparation Phase.
* In the BBP phase most of the part I was involved in documentation work.
* Studied the CSBP documents provided by the core users and participated in the creation of FSBP
documents with suitable solution.
* Finalised integration modules in BBP phase.
* FS preparation-Forms, Reports, Enhancements.
* Configured the settings required for creation and maintaining data in BOM, Workcenter, Task list,
Equipment Master, Functional location Maintenance Plan, Notifications, Order types, Routing, MRP
Parameters
* Knowledge on Integration of PM-PP, PM-MM, PM-WM, PM-SD, PM-CO, PM-HR, PM-QM, PP-MM, PP-
SD, PP-HR, PP-CO.
PROJECT # 2 : IMPLEMENTATION & HYPER CARE ( CGPL-Costal Gujrat Private Limited)
NAME : Power
On ROLE : PP/PM Consultant (Simar Infra Limited)
SCOPE : ECC 6.0 EHP 7
TEAM SIZE 25
DURATION : July'15- Oct '17
CLIENT : Costal Gujrat Private Ltd.
Roles & Responsibilities
Worked in ASAP methodology for the structure and systematic SAP Project Implementation.
* I have worked in all the phases of implementation project.
* Collected the objectives from the client in project preparation Phase.
* In the BBP phase most of the part i was involved in documentation work.
* Studied the CSBP documents provided by the core users and participated in the creation of FSBP
documents with suitable solution.
* Finalised integration modules in BBP phase.
* FS preparation-Forms, Reports.
* Worked on configuration settings for creation and assigning of MM namely Company, Company
Code, Plant and Storage location.
* Configured the settings required for creation and maintaining master data in BOM, Workcenter,
Equipment Master, Functional Location, Tasklist, Routing, Discrete Manufacturing.
* Configured the MRP settings such as MRP controllers, MRP types, Number ranges, Work scheduling
profile, plant parameters for MRP.
* Process knowledge on integration with Purchase requisition and Inventory Management.
* Knowledge on Integration of PP-CO, PP-MM, PP-SD.
NAME : Power
On ROLE : PP/PM Consultant (Simar Infra Limited)
SCOPE : ECC 6.0 EHP 7
TEAM SIZE 25
DURATION : July'15- Oct '17
CLIENT : Costal Gujrat Private Ltd.
Roles & Responsibilities
Worked in ASAP methodology for the structure and systematic SAP Project Implementation.
* I have worked in all the phases of implementation project.
* Collected the objectives from the client in project preparation Phase.
* In the BBP phase most of the part i was involved in documentation work.
* Studied the CSBP documents provided by the core users and participated in the creation of FSBP
documents with suitable solution.
* Finalised integration modules in BBP phase.
* FS preparation-Forms, Reports.
* Worked on configuration settings for creation and assigning of MM namely Company, Company
Code, Plant and Storage location.
* Configured the settings required for creation and maintaining master data in BOM, Workcenter,
Equipment Master, Functional Location, Tasklist, Routing, Discrete Manufacturing.
* Configured the MRP settings such as MRP controllers, MRP types, Number ranges, Work scheduling
profile, plant parameters for MRP.
* Process knowledge on integration with Purchase requisition and Inventory Management.
* Knowledge on Integration of PP-CO, PP-MM, PP-SD.