Project history
03/2021
-
03/2021
CEO
Operations / P and L / HR/ Projects / Customer Relationships / Continuous Improvement
12/2016
-
12/2020
CEO
NHEL Kathmandu
A Hydro Power equipment Manufacturing company in collaboration with IKNI Norway. Involved in
Manufacturing Hydro Turbines, Hydro Electric Plant Equipment's
Responsible for Operations, Projects , P and L.
Reporting to Norwegian and Local Board
Total 2 Plants Heavy Fabrication and weld shop , Turbine Shop
Manpower - Permanent is 256 and On Project sites is contractual and as per requirement (Present
over 500).
Ensuring Zero Delays in Projects.
Purchase Major equipment for Projects,
Import of all Major Project requirement
Monitoring and Controlling Technical Requirements of Shop-floor and Projects.
Co-ordinating with Norwegian counterpart for Turbine Manufacturing
Prepare annually a rolling longterm plan
Continuous Improvement Programs and Cost Reduction
Business generation and Expansion Technical Reviews of Contracts,
Manufacturing Hydro Turbines, Hydro Electric Plant Equipment's
Responsible for Operations, Projects , P and L.
Reporting to Norwegian and Local Board
Total 2 Plants Heavy Fabrication and weld shop , Turbine Shop
Manpower - Permanent is 256 and On Project sites is contractual and as per requirement (Present
over 500).
Ensuring Zero Delays in Projects.
Purchase Major equipment for Projects,
Import of all Major Project requirement
Monitoring and Controlling Technical Requirements of Shop-floor and Projects.
Co-ordinating with Norwegian counterpart for Turbine Manufacturing
Prepare annually a rolling longterm plan
Continuous Improvement Programs and Cost Reduction
Business generation and Expansion Technical Reviews of Contracts,
04/2014
-
11/2016
Plant Manager
Oerlikon Friction Systems
A Swiss MNC manufacturing Synchronizers for 4W Transmissions. This is Automotive Business Unit of
Oerlikon. Suppliers to Toyota / TATA / Mahindra and Ashok Leyland from India.
* Responsible in Project start-up and Stabilization.
* Team Building / Customer Relationship Management (Japanese, Indonesian/Thailand and Philippine's)
* LEAN Implementation, Trained at PORSCHE - Germany.
* TPS (Toyota) implementation.
* Continuous Improvement and Cost Reduction
* Materials Management and Logistics
* P and L of Plant.
* HR and Contract Labor management.
SAP Implementation.
Oerlikon. Suppliers to Toyota / TATA / Mahindra and Ashok Leyland from India.
* Responsible in Project start-up and Stabilization.
* Team Building / Customer Relationship Management (Japanese, Indonesian/Thailand and Philippine's)
* LEAN Implementation, Trained at PORSCHE - Germany.
* TPS (Toyota) implementation.
* Continuous Improvement and Cost Reduction
* Materials Management and Logistics
* P and L of Plant.
* HR and Contract Labor management.
SAP Implementation.
12/2003
-
03/2014
Asst General Manager
BEL Aurangabad
Vendor of Honda Motors / Bajaj Auto / Tata Motors / Mahindra 2wheeler and 3 Wheeler. Auto
Ancillary with Turnover of above 1500 Cr.
Profitability of the Plant
Responsible for Press Shop and Fabrication Production, Quality, Maintenance.
Inventory Control, Supply Chain Management.
Customer Relationship management
TPM / TS 16949 Implementation.
SAP Production and MM modules monitoring
Ancillary with Turnover of above 1500 Cr.
Profitability of the Plant
Responsible for Press Shop and Fabrication Production, Quality, Maintenance.
Inventory Control, Supply Chain Management.
Customer Relationship management
TPM / TS 16949 Implementation.
SAP Production and MM modules monitoring
05/1998
-
11/2003
Operations Manager
ISMT Ltd
Steel Rolling and Aluminum Die Casting.
Process /Pass /Tool Designing and Manufacturing for Hot and Cold Rolling Processes.
Import substitutions.
High Alloy Welding, Heat Treatment, Machining,
Hot Mill and Cold Rolling Mill Operations Management
Implementation of ISO 9001
OSHAS certification
Process /Pass /Tool Designing and Manufacturing for Hot and Cold Rolling Processes.
Import substitutions.
High Alloy Welding, Heat Treatment, Machining,
Hot Mill and Cold Rolling Mill Operations Management
Implementation of ISO 9001
OSHAS certification
05/1993
-
04/1998
Deputy Manager Engineering
SAW Pipes Ltd
Stainless Steel Hot and Cold Rolling.
Tools Designing
Manufacturing of Tools,
High Alloy Welding, Heat Treatment, Machining.
Tools Designing
Manufacturing of Tools,
High Alloy Welding, Heat Treatment, Machining.
08/1989
-
04/1993
Production Engineer
KLINGER (I) LTD.
Piston Valves and Steam Traps.
Machining of Valve and Steam Trap components,
Assembly of Valves, Steam Traps, Pumps
Testing, Painting
Machining of Valve and Steam Trap components,
Assembly of Valves, Steam Traps, Pumps
Testing, Painting
07/1987
-
07/1989
Assistant Engineer M/C Shop
RUSTON AND HORNSBY (I) Ltd
German MNC manufacturing Diesel Engines
Machine Shop Planning and Scheduling
Day to day production activities monitoring.
Machine Shop Planning and Scheduling
Day to day production activities monitoring.
Local Availability