Profileimage by Libor Toman Radio Network Planning and Optimization Engineer from

Libor Toman

available

Last update: 24.10.2017

Radio Network Planning and Optimization Engineer

Graduation: not provided
Hourly-/Daily rates: show
Languages: German (Full Professional) | English (Full Professional) | Czech (Native or Bilingual)

Attachments

cv_libor_toman.pdf

Skills

Excellent LTE, WCDMA and GSM optimisation skills
Site planning from location hunt up to final site configuration
Experience with Huawei (U2000), Nokia Siemens Networks (NetAct) and Ericsson
Strong analytical skills
Professional reporting skills, project management and leadership
KPI monitoring of Air interface and Transport layers, KPI definition
Ability to develop applications in MapBasic, Visual Basic and SQL
Excellent knowledge of tools such as Planet, Asset, Atoll, TEMS Investigation, TEMS Discovery, Actix, QVoice, Nemo, NQDI

Project history

Radio Optimization Consultant, 3G swap, Telekom DE
NET CHECK – Germany [2017]
-    Supporting Huawei during 3G Swap and 2G and 4G modernization for Deutsche Telekom
-    KPI monitoring and optimization
-    Site configuration supervision
-    Troubleshooting and tracking of the incidents
-    Preparation of Cluster Acceptance Reports

Radio Optimization Consultant, 4G rollout L800, Føroya Tele
NET CHECK – Faroe Islands [2017]
-    Supporting Huawei during 4G LTE800 rollout for Føroya Tele
-    Drive test analysis, optimisation and reporting, TEMS Investigation, TEMS Discovery
-    Coverage analysis, comparison and optimisation
-    KPI monitoring and optimisation 
-    Preparation of Cluster Acceptance Reports
-    Interaction with customer

Radio Planning Consultant, DAS, Prague Subway, T-Mobile CZ
NET CHECK – Czech Republic [2016]
-    Audit of planning documentation for Distribution Antenna System (indoor solution) in Subway in Prague
-    Setup of processes and design rules for future indoor solution in the whole subway network including tunnels
-    Interface between subcontractor and the mobile operator

Radio Optimisation Consultant, 2G, 3G Swap, 4G Rollout, Føroya Tele
NET CHECK – Faroe Islands [2015 – 2016]
-    KPI monitoring, optimisation, reporting
-    Supporting Huawei during 2G, 3G swap, 4G rollout for Føroya Tele
-    LTE CA (Carrier Aggregation) deployment, testing and optimisation
-    UMTS900 deployment and GSM Refarming
-    Drive test analysis, TEMS Investigation, TEMS Discovery
-    KPI monitoring and optimisation 
-    Managing the stability period of the assigned cluster
-    Preparation of Cluster Acceptance Report and interaction with customer

Radio Planning Consultant, LTE site nominal planning, VDF DE
NET CHECK – Berlin, Germany [2014]
-    LTE Site nominal plan for Berlin to fulfil the traffic growth expectation
-    New site planning and tilt optimization in Atoll

Radio Optimisation Consultant, 2G, 3G swap, 4G rollout, TDC Denmark
NET CHECK – Denmark [2014 – 2015]
-    Supporting Huawei during 2G, 3G swap and 4G rollout for TDC Denmark
-    Drive test analysis, optimisation and reporting, TEMS Investigation, TEMS Discovery
-    KPI monitoring and optimisation 
-    Managing the stability period of the assigned cluster
-    Cluster Acceptance Report creation

Radio Optimization Consultant, 2G and 3G swap, 4G rollout, Vodafone DE
Huawei – Munich [2014]
-    2G and 3G swap from NSN and Ericsson to Huawei for VDF DE
-    LTE rollout
-    Site functionality verification, performance review
-    KPI monitoring and optimisation
-    Cluster performance audit
-    Reporting towards customer

Radio Optimisation Consultant, Multivendor comparison, Huawei, NSN, ZTE, Munich, Hamburg Subway optimisation
NET CHECK – various projects [2012 – 2013]
-    LTE multivendor comparison for upcoming 4th network operator
-    Comparison of Huawei, ZTE and NSN hardware in various scenarios, simulating extreme radio conditions as well as high load
-    Munich and Hamburg Subway drivetest and optimisation, coverage analysis, accessibility and retainability audit.

RF Optimisation Engineer, 2G Swap, T-Mobile AT
NET CHECK – Austria [2011 – 2012]
-    Supporting Huawei during the Swap Project for T-Mobile
-    MML Script generation and implementation in M2000
-    Drive Test planning and coordination, Logfile analysis (Qvoice, TEMS)
-    KPI supervision and optimisation
-    Preparation of Cluster Acceptance Reports

WCDMA RF Optimisation Engineer, 3G Dual Carrier rollout, NSN South Africa
Nokia Siemens Networks – South Africa [2011]
-    3G and Dual Carrier rollout (Multi-radio)
-    Coordination of DT teams, planning according rollout schedule
-    Cluster DT analysis in Actix, KPI supervision in NSN Reporter Suite

WCDMA RF Optimisation Engineer, 3G rollout, Vodacom Mozambique
Nokia Siemens Networks – Mozambique [2010 – 2011]
-    3G rollout
-    Cluster DT analysis in Actix, antenna layout optimisation
-    Parameter audit and inconsistency checking
-    Statistics checking in NSN Reporter Suite

WCDMA RF Optimisation Engineer, 2G, 3G swap, 4G rollout, Telenor
NET CHECK – Norway [2010]
-    2G, 3G SWAP, LTE Rollout
-    Drive test logfiles analysis, optimisation, reporting, KPI monitoring, parameter tuning
-    Preparation of MML scripts and implementation in M2000


Teamleader RF Optimisation, Wataniya Kuwait
Wataniya Telecom – Kuwait [2007 – 2010]
-    Successful deployment of 2nd carrier and RU10
-    Optional feature testing, tuning and deployment
-    KPI definition and monitoring
-    Business Objects administration
-    Node-B capacity dimensioning and coordination with core team
-    Future strategy planning and coordination with vendors
-    Transfer of knowledge to other team members

RF Planning & Optimization specialist
T-Mobile – UK [2006 – 2007]
-    KPI definition and monitoring
-    Customer complaints analysis and rectification
-    Optimisation of SW parameters and features, traffic load distribution
-    Coverage optimisation and site redesign

Senior RF Consultant
Wataniya Telecom – Kuwait [2005 – 2006]
-    Managing of swap of BSS from Siemens to Ericsson, parameter inconsistency checking
-    KPI definition, implementation into Business Objects and development of reports

RF Planning and Optimization Engineer
Vodafone – Czech Republic [2001 – 2005]
-    Nominal planning
-    Site planning from initial location hunt up to antenna design and site parameters
-    Optimization of existing network after new sites are On-air
-    Day to day evaluation of statistics and KPIs, capacity dimensioning
-    Covering hot spots, dimensioning for special events Trade Fairs and Exhibitions Brno, Gauloises Grand Prix Brno, CIAF Airshow
-    Design of indoor solutions in shopping malls

RF Engineer
T-Mobile – Czech Republic [1998 – 2001]
-    CW simulations for new sites, coverage plot analysis, site design recommendations
-    Day to day optimisation

 

Local Availability

Only available in these countries: Czech Republic
Profileimage by Libor Toman Radio Network Planning and Optimization Engineer from Radio Network Planning and Optimization Engineer
Register