Didit Hermawan available

Didit Hermawan

LTE RF Planning & Optimization

available
Profileimage by Didit Hermawan LTE RF Planning & Optimization from
  • Freelancer in
  • Graduation: degree Electrical Engineering Departement
  • Hourly-/Daily rates: not provided
    negotiable
  • Languages: English (Limited professional)
  • Last update: 22.04.2018
KEYWORDS
PROFILE PICTURE
Profileimage by Didit Hermawan LTE RF Planning & Optimization from
ATTACHMENTS
CV Didit Hermawan_LTE RF Planning & Optimization
The download of this file requires a paid membership.
SKILLS
PT.Ericsson Indonesia - Nexwave
Project: Telkomsel Kalimantan Area
Lead LTE RF Optimization (Januari 2017 – Present )
Job Desk
  • Leader for QC SSV Acceptance Progress
  • Initial Tuning&Optimization for Ericsson LTE FDD TDD Network
  • Event,Trial&VIP Support Sales activity
  • Performance Optimization for cluster acceptance
  • Single Site closures for E// Kalimantan
  • Customer Facing for site Acceptance
  • Improvement for Mobility HO,Throughput,DCR,CA,PCI RSI conflict
  • Handling for Customer/VIP Complain from finding,action,solution&summary problem
  • Propose,Execute upgrade Power and Bandwidth




PT.Ericsson Malaysia – OCK Setia Eng
Project: Celcom Malaysia
2G 3G LTE RF Optimization (Sept 2016 – Jan 2017)
Job Desk
  • Initial Tuning&Optimization for Ericsson 2G 3G LTE FDD&TDD Network
  • Event & VIP Support
  • Performance network cluster Optimization
  • Single Site closures
  • Customer Facing for FTV Acceptance
  • Improvement for Mobility HO,Throughput,DCR,CA,PCI RSI conflict
  • Handling for Customer/VIP Complain from finding,action,solution&summary problem
  • Propose,Execute upgrade Power and Bandwidth
PT.Ericsson Indonesia - Nexwave
Project: Telkomsel Kalimantan Area
LTE RF Optimization (Januari 2016 – August 2016)
Job Desk
  • Initial Tuning for Ericsson LTE Network
  • Event & VIP Support activity sales
  • Performance Optimization
  • Single Site closures for BPP, BJM & SMR area
  • Customer Facing for site Acceptance QC SSV
  • Improvement for Mobility HO,Throughput,DCR,PCI RSI conflict
  • Handling for Customer/VIP Complain from finding,action,solution&summary problem
  • Propose,Execute upgrade Power and Bandwidth
PT.ZTE Indonesia
Project: Telkomsel Sulawesi Area
Radio Network Planning (March 2014 – January 2016)
Job Desk
  • Site Supervision for new candidate site&Coverage prediction
  • Create and provide Engineering parameters for site 2G 3G,U880,U900 and LTE
  • Create and Provide 1st Tier Optimization cluster,coverage,identity neighbor and recommendation change to improve performance network.
  • Create Gcell and Mapinfo Update&Creating Sysinfo database.
  • DRM site with tower provider and customer from Telkomsel.
  • Biweekly meeting with customer to discuss network,progress and related issue.
  • Support engineering parameter for swap integration,new site& Upgrade
  • JPP (joint Planning Program) with Telkomsel to define annual programs.
PT.Obelix Worldwide
Project: Indosat Modernization-Ericsson Jakarta
2G RF Tunning Engineer (January 2014 – March 2014)
Job Desk
  • Analyse DT Report and provide recommendation
  • Report  VIP/Customer Complain in cluster area
  • Weekly report Cluster&recommendation
  • 2G Initials Tuning Optimization.
  • Pre & Post Refarming Analisis WorstCell.
  • Audit Site Parameters, coverage, identify neighbors, and recommend changes to improve performance.
PT.Obelix Worldwide
Project: MS Axis Sumatera
2G3G RF Engineer (August 2011 – September 2013)
Job Desk
  • Analyse DT&Site Audit Report and provide recommendation
  • Report for VIP/Customer Complain
  • Biweekly meeting with customer to discuss progress,complain and other issue.
  • Manage DT team for all activity at Sumatera
  • Audit Site Parameters, coverage, identify neighbors, and recommend changes to improve performance.
  • Cluster KPI Achievement and solving problems.
          
PT.Feedco Solution
Project: Indosat -Ericsson Jakarta
DT Engineer (June 2009 – May 2010)         
Job Desk
  • Drive Test&Site Audit and reporting Basic KPI 2G 3G
  • Drive Test&Site Audit and reporting for Manage service
REFERENCES
LTE Deployement for Ericsson Eqp - Telkomsel Indonesia both FDD&TDD
-Responsible for Quality Acceptance Roll Out and Upgrade for more than 700 eNB
-Single site acceptance and Cluster Accpetance more than 700 eNB
 
TIME AND SPATIAL FLEXIBILITY
Worlwide
GET IN TOUCH

I accept the Conditions

I accept the terms of the privacy policy

Note: sending your contact request is free of charge