AM
available

Last update: 14.02.2018

Manager and SAP Senior Basis Netweaver / AS400

Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Limited professional) | Portuguese (Limited professional) | Spanish (Native or Bilingual)

Attachments

cv---detail_eng_jgmez.pdf

Skills

- COORDINATION TRAINING IN THE AREA OF INFORMATION TECHNOLOGY
- LEADER AND SAP BASIS NETWEAVER SPECIALIST
- SAP LEADER PROJECT MANAGEMENT OPTIMIZATION LEADER TO ENVIRONMENT IBM AS400 - ISERIES
- BEST PRACTICES TO AUDIT SAP SECURITY / INSTALLATIONS / UPGRADES

Project history

LACTEOS DOS PINOS Country : Costa Rica 07/2011 - 2015 Tlf. +506 24373465 www.dospinos.com Team Leader SAP NetWeaver, ERP - PI – BO – GRC - BPC - PMO SAP NetWeaver
- Upgrade ERP ECC6 EHP4-EHP6-EHP7
- Upgrade Oracle 11.x to Sybase 15.7.x (SAP international recognition)
- Implement SAP NW GRC 10.1 AC RM PC
- Security Integrations /roles & profiles 1000
- Implement Solution Manager 7.1
- Implement TDMS 4.0
- Implement SAP Screen Persona 3.0
- Implement SAP NW Gateway/Fiori.

AVANZA CONSULTING Country : Costa Rica 04/2009 – 05/2011 Lic. Johanna Angulo – jangulo@avanzaconsulting.net Tlf. +506 22962718 / 22903016 www.avanzaconsulting.net
Project Leader NetWeaver BC
- SAP Security workshop instructor
- SAP Administration workshop instructor
- Lead projects SAP NetWeaver

LA SIRENA – GRUPO RAMOS Country: Rep. Dominican 01/2011 – 04/2011 Ing. Adriano Cruz – acruz@gruporamos.com Tlf. +18099191327 www.gruporamos.com Team Leader Technical NetWeaver Update ver. BW
- Technical project leader for upgrade of BW-BI
- Configuration to connect BI to ECC 6
- Setting User Profiles
- Installation of SAP BO
- Implement basic SAP GRC, SOD-SOX

OPSA – Diario LA PRENSA Country : Honduras 09/2010 – 02/2011 Ing. Victor Chavez – Víctor.chavez@go.com.hn Tlf. +504 89991671 www.laprensa.hn
Manager Basis Upgrade NetWeaver vers. 4.7 Ent.
- Upgrade to version R/3 4.7 to ECC 6 EHP4
- Development and application of Security Roles and Profiles for 350 users
- Installation and configuration of Solution Manager 7.1
- Implement SAP GRC, SOD-SOX

WAL-MART CENTRO AMÉRICA Country : Costa Rica 02/2010 – 07/2010 www.wal-mart.com Team Leader Technical NetWeaver vers. 4.7
- Operational Maintenance Technical Leader
- Issue Basis workshops Administrative Tools
- Best Practices for Security Role Changes 267 users
- Access Audit

CABLE & WIRELESS PANAMÁ Country : Panamá 05/2009 - 05/2010 Lic. Saneth Quiel – saneth.quiel@cwpanama.com Tlf. +507 210-7288 www.cwpanama.com
Team Leader Technical configuration Netweaver vers ECC6.0 /Oracle 10 / Linux RH5 64bit
- Technical Leader for Oracle migration to MaxDB in SAP Solution Manager
- Integration of landscape SM 7.1 for SCM, BW, ERP
- System Administrator
- Issue Basis workshops Administrative Tools
- Change the structure of user security roles 630
- Access Audit

GALFISS, C.A. Country : Venezuela 12/2008 - 04/2009 www.galfiss.com Team Leader BASIS Netweaver vers. JDEdwards to ECC6.0
- Technical inclusive leader SAP JDE Migration
- Set landscape processes
- Configured Solution Manager 4.0

PETROZUATA, AMERIVEN Y PETROPIAR Country : Venezuela / 03/2008 - 07/2008 Ing. Victor Briceño Tlf. +58 4141113193 www.pdvsa.gob.ve Consultant BASIS SAP R/3 vers. 4.7
- Apply security policies Roles for 1550 users.
- Installation and configuration of ERP and BW
- Application Plug-in Support Package and Patches.

RECOPE Country : Costa Rica / 02/2008 - 03/2008 www.recope.go.cr Consultant Basis SAP NetWeaver Upgrade 4.7 ext 200 a 7.0
- Installing and configuring Solution Manager 4.0

LOCATEL Country : Venezuela - Mexico 09/2007 - 02/2008 Lic. Vilismary Romero – vilismary.romero@locatel.com.ve Tlf. +58 4166116038 www.locatel.com.ve
Project Leader BASIS NetWeaver SAP ECC5.0
- Technical Leader for UNICODE conversion of Landscape.
- Technical Leader for Venezuelan currency redenomination
- Project Manager Security and control of audit processes.
- Setting up test environments for redenomination.
- Implement security policies and profiles ERP Roles for 350 users.

LACTEOS DOS PINOS Country : Costa Rica 08/2007 - 08/2007 www.dospinos.com Team Leader BASIS Netweaver vers. ECC5.0
- Configured Customer Basis SOLMAN-DEV-PRD.
- Landscape Set TMS processes.
- Implementation of Plug-in Support Package and Patches.
- Backup and Recovery Processes.

TELEFÓNICA MOVISTAR C.A. Country : Venezuela - Argentina 06/2007 - 09/2007 Lic. Martha Restrepo – martha.restrepo@movistar.com.ve Tlf. +58 4143225784 www.movistar.com.ve
Consultant Basis SAP R/3 vers. 4.7
- Apply security policies ERP-HR Roles for 150 users.
- Implementation of Organizational Structure and adit Roles and Profiles
- Implement SAP VIRSA, SOD-SOX

IND.TEXTIL OBEJITA Country : Venezuela 05/2007 - 05/2007 www.obejita.com.ve Consultant BASIS SAP Netweaver 2004
- Installation and configuration of Solution Manager.
- Setup Development Environment.
- Landscape Set TMS processes.
- Application of OSS notes and patches.
- Creating Roles and profile development environment for 32 users

IMPORTADORA MONGE Country : Costa Rica 04/2007 - 06/2007 Ing Ihaara Orozco - iorozco01@imonge.com Tlf. +506 88404633 www.grupom.com
Consultant Basis SAP R/3 vers. 4.6C
- Basis of Client Configurator DEV-CAL-PRD.
- Landscape Set TMS processes.
- Application Plug-in Support Package and Patches.
- Backup and Recovery Processes.
- Homogeneous Copy Client.

ENEL Country : Costa Rica 04/2007 - 05/2007 www.enel.it.cr Consultant BASIS SAP R/3 vers. 4.7 - Basis of Client Configurator DEV-PRD.
- Implement security policies and profiles ERP Roles for 150 users.
- Landscape Set TMS processes.
- Application Plug-in Support Package and Patches.
- Backup and Recovery Processes.

SINCOR Country : Venezuela 01/2007 - 03/2007 www.sincor.go.ve
Security Technical Adviser NetWeaver 2004s
- Solution Manager Configured centralized user and roles to 250 users.
- Implement security policies and profiles Roles ERP-Portal-BI for integration.
- Set CUA landscape.
- Homogeneous Copy Client.

TODESCHINI – FIAT Country : Venezuela 06/2006 - 11/2006 www.fiat.com.ve Consultant BASIS SAP NetWeaver 2004s - Installed SAP Netweaver 5.0 and configured in OS/400, database DB2, platform AS/400.
- Installed Sap Netweaver in DEV, QAS and PRD.
- Managed the Transport Management System (TMS) process.
- Maintained CTS policies and procedures and performed CTS (transports)
- Monitored job scheduling and execution

INNOPACK Country : MX, CO y VE 03/2006 - 05/2006 www.innopack.com.mx Consultant Basis SAP R/3 vers. 4.6C
- Successfully performed Unification of security to 4.6C, region Center and south-American 290 users.
- Implement SAP methodology SOD-SOX
- Managed the Transport Management System(TMS) process
- Maintained CTS policies and procedures and performed CTS (transports)
- Applied OSS notes, R/3 Support Packages
- Configured, managed, monitored and maintained SAP R/3 printing facilities

LABORATORIOS NOVARTIS Country : MX, GT, CR, EC, BR, AR, CH, RD, CO y VE 03/2005 - 02/2006 Ing. Cesar González Tlf. +52 448116217183 www.novartis.com
Security and Technology Coordinator R/3 vers. 4.6C
- Successfully performed Unification of security to 4.6C, region Center and south-America 600 users in ERP an BW
- Implement SAP GRC, SOD-SOX
- Maintained CTS policies and procedures and performed CTS (transports)
- Monitored job scheduling and execution
- Managed/supported R/3 client’s strategy of data security and risk

HOLCIM GROUP CEMENTS Country : MX, CR, EC, BR, AR, CH, CO y VE 07/1996 - 08/2004 Contacto: Ing. Carlos Reyes – carlos.reyes@invecem.com Tlf. +582122074136 www.holcim.com - Manager IT and Segurança R/3 vers. 4.6C - Chief of Systems and platform SAP R/3 vers. 3.0F, 4.0 y 4.5B
- Configured Digitization of Documents systems Ixos - SAP R/3
- Implemented SP stacks
- Direction and Control the security of the infrastructure network LAN-WAN
- Performed post installation/upgrade configuration tasks.
- Managed the Transport Management System(TMS) process
- Maintained CTS policies and procedures and performed CTS (transports)
- Monitored job scheduling and execution
- Applied OSS notes, R/3 Support Packages, Add-ons and SPAM/SAINT updates - Managed/supported R/3 client’s strategy.
- Configured, managed, monitored and maintained SAP R/3 printing facilities
- Conducted installations and upgrades of new hardware components
- Delivered support for attached server peripherals (e.g., disk and tape drives, printers).
- Install, configure and test backup and recovery system with brtools
- Design and implement Basis administration process and procedures for SAP landscape
- Implemented Early Watch Alert reports requirements.
- DBA instances ORACLE in HP-UX.
- Implementation AIS R/3
- Successfully performed Unification of security upgrade 4.5B to 4.6C, region south-America 820 users
- Cooperation Cluster platforms OS/400 and WNT 4.0 SAP R/3 – Apasco, Mexico

BANCO PROVINCIAL S.A.C.A. Country : Venezuela 02/1989 - 06/1999
Technical Coordinator AS/400 to filial Finalven, Lara y Provincial Banks.
- Planned and executed OS/400 technical upgrade from 3.1 to 3.6
- Installed, administered PC support GUI/400
- Configure and install Novell network
- Installed, administered OS 2
- Administered Cytibank System
- Administered connection Lara Bank- Finalven – Provincial Bank
- support final users
 

Local Availability

Only available in these countries: Costa Rica
For now only remote support from 3:00 p.m. to 3:00 a.m.
Profileimage by Anonymous profile, Manager and SAP Senior Basis Netweaver / AS400 Manager and SAP Senior Basis Netweaver / AS400
Register