SAP Project Experience
Projects undertaken by Fourth Signal
Name of the client: Piramal group , Mumbai, Maharashtra, India
Environment: SAP S/4 HANA (TRM Module Integration)
Responsibilities:
* Planning Implementation, Configuration of S4 HANA systems & DR.
* Roles & authorization to the users as per the required authorization, creation of roles with
new authorization requirements.
* Support & Troubleshooting for S/4 HANA & HANA DB.
Projects undertaken by Fourth Signal
Name of the client: Glenmark Pharma, Mumbai, Maharashtra, India
Environment: SAP R/3, ECC 6.0 Ehp7
Responsibilities:
* Daily support & troubleshoot for the SAP & Open Text systems.
* Roles & authorization to the users as per the required authorization, creation of roles with
new authorization requirements.
* Support for EHP7 upgrade.
Projects undertaken by Free lancing
Name of the client: UTI AMC, Mumbai, Maharashtra, India
Environment: SAP R/3, ECC 6.0
Responsibilities:
* Operating System & Database Migration from Windows 2003/MSSQL 2005 to
Windows 2012 / MS SQL 2012 R2.
* Upgrade of SAP ECC 6.0 to SAP ECC 6.0 EHP8 using SUM tool.
Projects undertaken at A5E Consulting.
Name of the client: CMC(Classic Marble Classic) Mulund, Mumbai, Maharashtra, India
Environment: SAP R/3, ECC 6.0 Ehp4
Responsibilities:
* Enhancement package upgrade from EHP 4 SPS 12 to EHP 7 SPS 11 for HANA migration using SUM
tool.
* Support for daily user issues during the Upgrade phase.
* Authorizations issued to the users as per the requirements.
Name of the client: Matrix Baroda, Gujrat, Maharashtra, India
Environment: SAP R/3, ECC 6.0 Ehp7
Responsibilities:
* Support for on going Implementation.
* Creation of roles as per the matrix given by the core users requirements.
Projects undertaken at AAkit Technologies.
Name of the client: SAP India, Mumbai, Maharashtra, India
Environment: SAP R/3, ECC 6.0
Responsibilities:
* Perform onsite/remote license audits at customers sites across APJ region based on SAP
standard practices.
* Check indirect usage of SAP system through RFC's and other methodology.
* Conduct onsite audit, focus on Multiple logons, Indirect usage, Total users in Production box,
Dev
users ,recently deleted users and other tech steps based on the MOM. The complete Process is
followed after the MOM.
* Manage critical customer situations and communicate software over usage data.
* In conjunction with Global License Auditing Services continuously optimize the quality of
audits
through continuous improvements and learning.
* Prepare consolidated report based on USMM evaluation report from GLAS team and onsite
findings.
Name of the client: Rustomjee, Mumbai, Maharashtra, India
Environment: ECC 6.0, EHP5
Responsibilities:
* Backup of all systems Online / Offline
* Troubleshooting all issues of support, on Rustomjee Portal.
* Roles and authorization revamping, with all the modules.
* Daily monitoring SM12, DB13, ST22, SM21, SM50, ST02.
* Solution Manager 7.0
Name of the client: Jyoti Plastics, Mumbai, Maharashtra, India
Environment: ECC 6.0, EHP5
Responsibilities:
* Backup of all systems Online / Offline
* Kernel Upgrades of Development, Quality System, Production System
* Daily monitoring of all systems.
Name of the client: Ahuja Group, Mumbai, Maharashtra, India
Environment: ECC 6.0, EHP5
Responsibilities:
* Backup of all systems Online / Offline
* Kernel Upgrade of Development, Quality System, Production System
* Upgrade SAP System using SUM
* Post upgrade activities
Name of the client: Kamala Mills, Mumbai, Maharashtra, India
Environment: ECC 6.0, EHP6 with Best practices DIMP
Responsibilities:
* Installation and Configuration
* System Refresh and Post refresh activities
* Creation of profiles and authorization with authorization matrix
* Profile parameter change, Client Copy / refresh.
* Backup of ASE Sybase 15.0.7 database and patch update .
* Solution Manager 7.1 Configuration
Projects undertaken as a Basis Consultant for Bigtec Pvt. Ltd.
Name of the client: Reliance Big Entertainment Ltd. Mumbai, Maharashtra, India
Project duration: from Apr 09 - Jul 09 Environment: My SAP ERP 2006 ECC 6.0
Responsibilities:
* Installation and Configuration
* OS / DB Migration from Windows Operating System to Sun Solaris 10 System.
* System refresh and post refresh activities
* Creation of profiles and authorization with authorization matrix
* Monitoring processes related to SAP and other interfacing Product
* Installation of Solution Manager and Configuration of Maintenance Optimizer and Service Desk
Name of the client: Ridham Synthetics, Mumbai, Maharashtra, India
Project duration: from May 08 -Aug 08 Environment: My SAP ERP 2006 ECC 6.0
Responsibilities:
* Sizing, Installation and Configuration
* Applying ABAP stack and JAVA Stack patches ( Support Packages )
* Recommendations after Monitoring reports (EWA Analysis)
* System Refresh and Post refresh activities
* SMTP Configuration
* Manage and monitor the database space requirements if extension of database is required and
control overflows, analyzing the database and periodic reorganization for effective
performance.
* Preparation of Documents and Presentation's for End User Training.