Skills
Dear Mrs.:
It´s a pleasure for me greeting you and have the opportunity of present my resume to study the chance for get a job position in this important company.
It´s very important tell you that I´ve two proffesional certificates. One of them is computers technician and the other is mechanical engineer, also I´ve a master degree in general management for administrative sciences.
The professional experience in these areas is more than eighteen years. Aditional, I want to expose you my strongest habilities:
Sincerely,
Jorge Ybrahim Mukdassi
ybrahimj@gmail.com
tlf +58 416 4918952, +58 414 8694394
It´s a pleasure for me greeting you and have the opportunity of present my resume to study the chance for get a job position in this important company.
It´s very important tell you that I´ve two proffesional certificates. One of them is computers technician and the other is mechanical engineer, also I´ve a master degree in general management for administrative sciences.
The professional experience in these areas is more than eighteen years. Aditional, I want to expose you my strongest habilities:
- High efficiency equipment coordination.
- Mechanical Leader of Oil and Gas Project.
- Elaboration of Mechanical Specifications Document (PIP, PDVSA, Shell, etc.)
- Piping Designer for Oil and Gas Industries, piping designer for refineries and other industries.
- Design of equipments like knockouts drums, separators, pumps, tanks, heat exchangers and others. PvElite, Compress.
- Piping stress calculations using ceasar´s program
- Simulators programs managements (Pipephase, Hextran, Pro/II).
- Development and reviewing of conceptual, basis and details enginerings
- Repair and computers maintenance.
- Third generation programming languages.
- System analysis.
- Database mangement.
- Maintenance plans development.
Sincerely,
Jorge Ybrahim Mukdassi
ybrahimj@gmail.com
tlf +58 416 4918952, +58 414 8694394
Project history
Period: September 2017 - February 2018
Company / City: RORANCA / Maturin
Position: Mechanical Lead Project
Project: “Ingeniería, Procura y Construcción de Facilidades para incremento de producción 105 MBD a 165 MBD de crudo extrapesado en las instalaciones de PETROLERA SINOVENSA en planta de mezcla Jose, Morichal y Bloque MPE-3 (PDVSA-Ingeniería y Construcción; PDVSA-PETROLERA SINOVENSA; HQCEC
Client: HQCEC
Technical highlights and accomplishments: Engineering document and drawing review, elaboration of tanks´construction procedure, elaboration of welding´s document procedure, elaboration of lifting procedure document, elaboration of voucher´s material from warehouse, mechanical inspection of pumps installation. Mechanical supervising of pipes welding and flare lifting. Elaboration of mechanical documents like calculation memory, material estimate, valves list, welding specification, paint specifications, pumps specifications, packages equipment specifications, static equipments specifications, etc. Elaboration of mechanical drawings like piping layouts, elevations and details.
Period: June 2013 - January 2017
Company / City: Ecotek Investment, Inc / Panamá City, Panamá
Position: Mechanical Lead Engineer Project
Projects:
- Indian Creek Power Generation Project (Pentacles Electric-USA).
- Solmico Facilities Basic and Details Engineering Phase II (LYTHAM GROUP-Colombia).
- Dehydration Guaduas Plant (Pacific Rubiales-Colombia)
Client: Pentacles Electric –USA; LYTHAM Group- Colombia; Pacific Rubiales-Colombia.
City: Panamá City, Panamá
Technical highlights and accomplishments: Elaboration of Criteria Design Document, Static Recipients Specification Document, Static Equipment Data Sheet Document, Reviewing and Design of Mechanical Piping Drawings, VDDR Static Equipment’s, Pumps Specification Documents (Centrifugal and Rotatives) VDDR Pumps Isometrics Drawings. Material Specification Document. Calculation Memory Document for Pipes, Pump Specification Document.
Assigned as Mechanical Lead Engineer.
Involved in P&ID development, datasheet preparation for pumps and vessels, vessel sizing.
Attended inter-department coordination meeting and directly reporting to Project Manager.
Additionally, prior to Proposal submission, has been involved in the Manhour Estimation and directly reporting to Project Manager and to Engineering Division Manager.
Supervision of Static Equipments Fabrication, and EPC of Recipients.
Period: January 2012 - June 2013
Company / City: TDR Organization/ Maturin - Venezuela
Position: Mechanical Engineer Lead Project
Projects:
- Water Process Handling for Centro Operativo Rusio Viejo.
- Auditorium´s Design of PDVSA New Exploration Building.
- Educative Institute of Exploration (PDVSA Field).
Client: PETROLEOS DE VENEZUELA, S.A. (PDVSA)
City: Maturin, Monagas, Venezuela
Technical highlights and accomplishments: Elaboration of Criteria Design Document, Static Recipients Specification Document, Equipment Data Sheet Document, Reviewing and Design of Mechanical Piping Drawings, Isometrics Drawings. Material Specification Document. Calculation Memory Document for Pipes, Pump Specification Document. Strenght Analysis. Reviewing and Design of Mechanical Piping Drawings. HVAC Design. Extinguish Fire Systems, Pump Specification Document. Pump datasheets.
Assigned as Mechanical Lead Engineer.
Involved in P&ID development, datasheet preparation for pumps and vessels, vessel sizing.
Attended inter-department coordination meeting and directly reporting to Project Manager.
Additionally, prior to Proposal submission, has been involved in the Manhour Estimation and directly reporting to Project Manager and to Engineering Division Manager.
Tracing to vessels fabrication and procurement activities. Supervision to fabrication vessels procedures per ASME code.
Period: June 2011-December 2011
Company / City: Tecnesp - Venezuela / Maturin - Venezuela
Position: Mechanical Engineer Lead Project
Project: - Auxiliary Pump installation for Stabilization Tanks of Jusepin Complex.
Client: PETROLEOS DE VENEZUELA, S.A. (PDVSA)
City: Maturin, Monagas, Venezuela
Technical highlights and accomplishments: Elaboration of Criteria Design Document, Paint Specification Document, Construction Specification Document, Material List Document, Reviewing and Design of Mechanical Piping Drawings, Isometrics Drawings. Material Specification Document. Calculation Memory Document for Pipes, Tanks and Recipients. Strength Pipe Analysis.
Mechanical Designer for the facilities to stabilization tanks of Jusepin Complex, meeting coordination with pumps vendor and elaboration of mechanical piping drawing. Interdisciplinary coordination activities and report to Direct Engineering Department Manager.
Company / City: RORANCA / Maturin
Position: Mechanical Lead Project
Project: “Ingeniería, Procura y Construcción de Facilidades para incremento de producción 105 MBD a 165 MBD de crudo extrapesado en las instalaciones de PETROLERA SINOVENSA en planta de mezcla Jose, Morichal y Bloque MPE-3 (PDVSA-Ingeniería y Construcción; PDVSA-PETROLERA SINOVENSA; HQCEC
Client: HQCEC
Technical highlights and accomplishments: Engineering document and drawing review, elaboration of tanks´construction procedure, elaboration of welding´s document procedure, elaboration of lifting procedure document, elaboration of voucher´s material from warehouse, mechanical inspection of pumps installation. Mechanical supervising of pipes welding and flare lifting. Elaboration of mechanical documents like calculation memory, material estimate, valves list, welding specification, paint specifications, pumps specifications, packages equipment specifications, static equipments specifications, etc. Elaboration of mechanical drawings like piping layouts, elevations and details.
Period: June 2013 - January 2017
Company / City: Ecotek Investment, Inc / Panamá City, Panamá
Position: Mechanical Lead Engineer Project
Projects:
- Indian Creek Power Generation Project (Pentacles Electric-USA).
- Solmico Facilities Basic and Details Engineering Phase II (LYTHAM GROUP-Colombia).
- Dehydration Guaduas Plant (Pacific Rubiales-Colombia)
Client: Pentacles Electric –USA; LYTHAM Group- Colombia; Pacific Rubiales-Colombia.
City: Panamá City, Panamá
Technical highlights and accomplishments: Elaboration of Criteria Design Document, Static Recipients Specification Document, Static Equipment Data Sheet Document, Reviewing and Design of Mechanical Piping Drawings, VDDR Static Equipment’s, Pumps Specification Documents (Centrifugal and Rotatives) VDDR Pumps Isometrics Drawings. Material Specification Document. Calculation Memory Document for Pipes, Pump Specification Document.
Assigned as Mechanical Lead Engineer.
Involved in P&ID development, datasheet preparation for pumps and vessels, vessel sizing.
Attended inter-department coordination meeting and directly reporting to Project Manager.
Additionally, prior to Proposal submission, has been involved in the Manhour Estimation and directly reporting to Project Manager and to Engineering Division Manager.
Supervision of Static Equipments Fabrication, and EPC of Recipients.
Period: January 2012 - June 2013
Company / City: TDR Organization/ Maturin - Venezuela
Position: Mechanical Engineer Lead Project
Projects:
- Water Process Handling for Centro Operativo Rusio Viejo.
- Auditorium´s Design of PDVSA New Exploration Building.
- Educative Institute of Exploration (PDVSA Field).
Client: PETROLEOS DE VENEZUELA, S.A. (PDVSA)
City: Maturin, Monagas, Venezuela
Technical highlights and accomplishments: Elaboration of Criteria Design Document, Static Recipients Specification Document, Equipment Data Sheet Document, Reviewing and Design of Mechanical Piping Drawings, Isometrics Drawings. Material Specification Document. Calculation Memory Document for Pipes, Pump Specification Document. Strenght Analysis. Reviewing and Design of Mechanical Piping Drawings. HVAC Design. Extinguish Fire Systems, Pump Specification Document. Pump datasheets.
Assigned as Mechanical Lead Engineer.
Involved in P&ID development, datasheet preparation for pumps and vessels, vessel sizing.
Attended inter-department coordination meeting and directly reporting to Project Manager.
Additionally, prior to Proposal submission, has been involved in the Manhour Estimation and directly reporting to Project Manager and to Engineering Division Manager.
Tracing to vessels fabrication and procurement activities. Supervision to fabrication vessels procedures per ASME code.
Period: June 2011-December 2011
Company / City: Tecnesp - Venezuela / Maturin - Venezuela
Position: Mechanical Engineer Lead Project
Project: - Auxiliary Pump installation for Stabilization Tanks of Jusepin Complex.
Client: PETROLEOS DE VENEZUELA, S.A. (PDVSA)
City: Maturin, Monagas, Venezuela
Technical highlights and accomplishments: Elaboration of Criteria Design Document, Paint Specification Document, Construction Specification Document, Material List Document, Reviewing and Design of Mechanical Piping Drawings, Isometrics Drawings. Material Specification Document. Calculation Memory Document for Pipes, Tanks and Recipients. Strength Pipe Analysis.
Mechanical Designer for the facilities to stabilization tanks of Jusepin Complex, meeting coordination with pumps vendor and elaboration of mechanical piping drawing. Interdisciplinary coordination activities and report to Direct Engineering Department Manager.
Local Availability
Only available in these countries:
Venezuela
Available for travel any time