VC

vinothkumar Chandrabose

available

Last update: 06.09.2022

Project Lead, Technical Manager (Principal Engineer), Technical Lead

Graduation: not provided
Hourly-/Daily rates: show
Languages: English (Limited professional)

Attachments

Vinoth Kumar. C_Honeywell.doc

Skills

Flight Management Systems (FMS), Flight Control Systems (FCS), EMB27.1, 27.2 variants, Dassault DF7X, DF5X, Sklearn, Numpy, Keras, Tensorflow, Pandas, NLTK, Matplotlib, Agile, C++, IBM, Rhapsody, Vector CAST, Vector cover, DOORS, Clear case, Clear Quest, Sage Maker, SDLC, Agile/Scrum, C, MATLAB, RESTful, API, Django, Python, Docker, Amazon AWS EC2, System Testing, CIM, PERF, GPS, refactoring, Signal Processing

Project history

04/2013 - 08/2020
Senior Embedded Eng Supervisor
Honeywell Technology Solutions

* Develop CTPs for FC programs and execute it in the FCM target and reporting issues to Sw
team (Sw / Tools: C, MATLAB, and Vector Cover). Coordinate with multiple stake holders for
better project planning and execution.
* Involved in Requirement management and Involved in PDR and CDRs in various Flight Control
System application development / verification activities.
* Managed Various Micro Services Architecture projects to develop RESTful API using Django
in Python. Develop Docker Containers and Deployment made using Dockers in Amazon AWS EC2
* Coordinating the FAA, ANAC, EASA SOI-3 Technical Audits and Involved in Requirements
Analysis.
* Responsible for Project planning and Estimation. Responsible to achieve the project
Commitments/milestones in planned Schedule, Cost and with right Quality.
* Responsible for Performance Management of the team based on their Career aspirations.

Noteworthy Accomplishments
* Honoured with Top - 10 Mentor Award for mentoring Engineer for Green Belt Project across
Honeywell Aero.
* Instrumental in accomplishing flawless planning & executing EMB27.2, G500, DF7X 2nd cert
and E2 programs.

04/2013 - 08/2016
Project Lead

* Lead team of 10 to 20 members and meet project goals. Drive V & V COE STRAP goals and
achieve TTI.
* Pursue people management such as goal setting, performance management, mentoring and
coaching.
* Lead team to develop Unit Level, Integration Level and System Level Test Procedure for
Next Generation Flight Management Systems

Noteworthy Accomplishments
* Instrumental in developing common IO strategies saved 2800+ hours and acknowledged from
Program Manager.
* Successfully executed NGFMS transition plan to bring the NGFMS V & V to HTS Madurai.

08/2010 - 04/2013
Technical Manager (Principal Engineer)
Cognizant Technology Solutions

* SOM24 System Testing WESTRACE MKII Inter Lockings (SIL 4).
* CIM System Testing WESTRACE MKII Inter Lockings (SIL 4).
* Validation of Signal output Module (SIL4).

Key Deliverables
* Act as Functional Manager for the validation activities of SOM24 and lead approximately 15
to 20 Engineers.
* Examined the validity of defects by coordinating with system engineers and provide
conclusion of the defect as a part of CCB.

07/2006 - 08/2010
Technical Lead
THALES software India

Technical Lead:

* Software Development of PERF APPROACH, INIT, MIL GPS and DATA STATUS Page.
* Maturity Testing of Various HMI Pages.

Key Deliverables
* Lead technical activities for HMI refactoring of FMS pages in A400M.
* Function as Team Lead; track PR status and help team members to resolve technical
problems.

05/2002 - 04/2006
Engineer
Hindustan Aeronautics Limited/AK Aerotek software private Limited

* Engine Vibration Signal Processing Module, Air Data Unit.
* Engine Monitoring Unit.
Key Deliverables
* Contribute in Development of test cases for module testing (using CANTATA tool) of
electronic control unit, and engine monitoring unit. System level testing activities.

Local Availability

Only available in these countries: India
Profileimage by vinothkumar Chandrabose Project Lead, Technical Manager (Principal Engineer), Technical Lead from Bengaluru Project Lead, Technical Manager (Principal Engineer), Technical Lead
Register