Programming, Operating System, Windows 7, ERP, DB, SAP HANA 1909, ERP Components, Intel Series, SAP HANA, SAP PP, DMS, SAP, Microsoft Excel, Word, Visio, UAT, functional specifications, data handling, SQL, Hybris, ABAP, Microsoft Project, Logic, Unit testing, Oracle, Data Migration, decoding, CRM, barcode, Interface, barcode scanner, BDC, SAP R/3
Languages
EnglishFluent
Project history
Project 3
Project Name TRANSFORM Team Size 8
Start Date 12th Feb,19 End Date 1st Aug 19
Project SAP HANA 1809 implementation at Polybond India Pvt. Ltd
Description
Project Lead (SAP PP/QM/DMS)
* Business Process understanding
Role & * Walk thru with business about existing processes and GAP
Contribution * Solution design and document
* Training and UAT
* Designing key reports such as machine utilization andoperator
efficiency oduct wise profitability analysis.
Technology & Microsoft Excel, Word and Visio.
Tools
Key WIP batch concept successfully implemented in manufacturing.
Achievements
Project Name TRANSFORM Team Size 8
Start Date 12th Feb,19 End Date 1st Aug 19
Project SAP HANA 1809 implementation at Polybond India Pvt. Ltd
Description
Project Lead (SAP PP/QM/DMS)
* Business Process understanding
Role & * Walk thru with business about existing processes and GAP
Contribution * Solution design and document
* Training and UAT
* Designing key reports such as machine utilization andoperator
efficiency oduct wise profitability analysis.
Technology & Microsoft Excel, Word and Visio.
Tools
Key WIP batch concept successfully implemented in manufacturing.
Achievements
* Understanding Client's existing processes related to Contracting
business.
* Requirement gathering of existing business practices (high level) and
documenting.
* Understanding client's expectations from ERP implementation.
* Design processes for
Role & * Pre-Tendering
Contribution
* Estimation
* Post Tendering
* Project Mobilization
* Work order processing
* Project execution
* BOQ measurements and customer billing
* RMC plant
Page 18 of 18
* Design various key MIS
* Purchase register
* Budget burnt report
* Job Cost report
* Job look ahead report
Material monthly budget
business.
* Requirement gathering of existing business practices (high level) and
documenting.
* Understanding client's expectations from ERP implementation.
* Design processes for
Role & * Pre-Tendering
Contribution
* Estimation
* Post Tendering
* Project Mobilization
* Work order processing
* Project execution
* BOQ measurements and customer billing
* RMC plant
Page 18 of 18
* Design various key MIS
* Purchase register
* Budget burnt report
* Job Cost report
* Job look ahead report
Material monthly budget
Project 6
Project Name Project ONE-GE Energy Team Size 50
Start Date Oct 2012 End Date 31st July,13
GE Energy is an electrifying descendant of Edison's light bulb and a global
leader in the design, manufacture, installation, and maintenance of coal,
oil, natural gas, nuclear, wind, and steam-driven power generation plants.
One of General Electric's largest divisions, GE Energy serves utility,
Project industrial, and governmental customers worldwide, supplying products
Description such as turbines, compressors, generators, valves, and instrument
transformers. It also provides equipment that supports oil and gas
distribution and services ranging from consulting and field engineering to
environmental monitoring and product lifecycle management. GE Energy
operates in about 140 countries worldwide.
Role & SAP Variant configuration consultant
Contribution
Page 5 of 5
* Study of product (industrial valves) from engineering point of view.
* Understanding engineering rules (dependencies)
* Capturing rules in engineering logic sheet
* Development of product structure in SAP VC
* Variant pricing
* End to end process mapping for Configure to order scenario
* Master data handling for master data related to SAP VC
* Co-coordinating between SAP and SQL team for interfaces for valve
hydro tests
* Co-coordinating between SAP and SQT team for Spare quoting tool
interface
* Co-coordinating between SAP and Hybris team for configurator
simulator development for Green Tag center.
* Capture of business data which is one of most critical data in industrial
valve business.
Technology & Microsoft Excel, Word and Visio.
Tools
Key Automated tools development to seamlessly migrate comples variant
Achievements configurator product structure across SAP systems.
Project Name Project ONE-GE Energy Team Size 50
Start Date Oct 2012 End Date 31st July,13
GE Energy is an electrifying descendant of Edison's light bulb and a global
leader in the design, manufacture, installation, and maintenance of coal,
oil, natural gas, nuclear, wind, and steam-driven power generation plants.
One of General Electric's largest divisions, GE Energy serves utility,
Project industrial, and governmental customers worldwide, supplying products
Description such as turbines, compressors, generators, valves, and instrument
transformers. It also provides equipment that supports oil and gas
distribution and services ranging from consulting and field engineering to
environmental monitoring and product lifecycle management. GE Energy
operates in about 140 countries worldwide.
Role & SAP Variant configuration consultant
Contribution
Page 5 of 5
* Study of product (industrial valves) from engineering point of view.
* Understanding engineering rules (dependencies)
* Capturing rules in engineering logic sheet
* Development of product structure in SAP VC
* Variant pricing
* End to end process mapping for Configure to order scenario
* Master data handling for master data related to SAP VC
* Co-coordinating between SAP and SQL team for interfaces for valve
hydro tests
* Co-coordinating between SAP and SQT team for Spare quoting tool
interface
* Co-coordinating between SAP and Hybris team for configurator
simulator development for Green Tag center.
* Capture of business data which is one of most critical data in industrial
valve business.