02/16/2024 updated

**** ******** ****
100 % available

Technical Program Manager

Dumbravita, Romania
Worldwide
Systems Engineering, Computer, and Information Technology | Electrical and Power Engineering
Dumbravita, Romania
Worldwide
Systems Engineering, Computer, and Information Technology | Electrical and Power Engineering

Profile attachments

CV Bogdan Berghezan - ENG 2024.pdf

Application Programming Interfaces (APIs)Agile MethodologySystems EngineeringAtlassian JiraTest AutomationC Sharp (Programming Language)Software Design DocumentsDevOpsField-Programmable Gate Array (FPGA)Identity ManagementWeb PortalsInventory Management SoftwareLookup TableRelease ManagementRequirements TraceabilitySimulation SoftwareSystem Integration TestingSystems IntegratorSystem TestingTest ManagementSystem AvailabilityBackendFront End Software DevelopmentMicroservices
Agile processes, API, APIs, Automation testing, Test Automation, automated test, backend, C#, DevOps, FPGA, front-end, HMI, Identity Management, Information Technology, Inventory software, Jira, Lookup tables, Microservices, Release Manager, Release Management, requirement traceability, simulation software, design documents, high availability, System Integration Test, System test, Systems Engineering, test manager, web portals

Experience

Professional experience10+ years
Freelancer since2019

Languages

GermanBasic knowledgeEnglishNative speaker

Project history

Technical Project Manager (System Integrator)

Virgin Media IE
Responsible for launching of a new suite of connectivity applications (web portals and phone app) for Virgin Media
Ireland.
* Overall accountable for the deliverables and delivery. My engagement started from the Impact assessment
phase and finished once we had the Commercial Go Live.
* Managing the project from a planning and delivery perspective: ownership of the Delivery Plan,
contracting, supervising, and motivating the delivery teams.
* Responsible for the integration of over 10 separate components developed by LGI teams but also external
vendors.
* During the project I had to engage close to 200 people and form cross-functional teams ranging between
10-20 members.
* Technical leadership and coordination of project software teams: development, QA, architecture,
hardware, operations, security, performance.
* A short classification of my deliverables: design documents, environment readiness, SIT deployments, SIT
testing, UAT deployments, Operational readiness activities (e.g. performance, security testing), PROD Go
Lives.
* SPOC for the customer for their UAT, TFT/FUT, warranty or any (technical) question.
* Managing clients' expectations and integration activities to achieve our milestones.
* Following the Agile processes in Jira: CR (change request creation, approvals, and updates), RM (release
management for code delivery in all the environments). In USMS CRQs and Incidents creation for engaging
the L2 and Ops teams for UAT & PROD). Weekly project updates and Wiki pages for maintaining an up-todate
API & URL information and delivery stories.
* Integration and management of the front-end platforms (web, app) with IT backend (Akana gateway,
Microservices, Identity Management, Backend mobile platforms, voice and TV DBs, Carto maps, ACS and
physical CPEs) hosted both in our datacenters and in AWS.
* All the responsibilities listed above have played a decisive role in ensuring a successful delivery in a
challenging timeframe (approx. 1y)

Delivery Lead

Vodafone Italy
* Point of contact between local and onsite Delivery Center
* Point of contact for IBM-Amdocs Delivery Center
* Release management for the Fulfilment and Inventory software (Comptel)
* QA Provisioning Delivery Lead for Integration and Automation testing
* DevOps Lead for Provisioning solution:
- Definition and validation of the infrastructure matrix (connectivity matrixes) required for the test
environment integration: northbound with Amdocs environments, southbound with network
elements
- Preparing and deploying our framework and components on standalone and high availability
environments both on our local and Vodafone labs
- Deploying and configuring Logic libraries, Lookup tables, Network element interfaces and all
necessary configurations.
- Installing certificates for NE authentication
- Deploying RSA keys
* System Integration Test Strategy development and implementation
* System Integration Test Plan development and implementation
* Review and support the work done by team members
* Workshops for the Amdocs SIT team with the newly integrated functionalities
* Project, cost and resource planning
* Defect triage and management
* Daily test status reports
* Test Summary Report at the end of each release
* Provide mentorship for all the team members
* Customer facing roles:
- Reporting
- Defect triage
- Escalation point

Solution Specialist/Delivery Lead

Alcatel-Lucent/Nokia

Delivery Lead

Ooredoo Qatar
* Point of contact between local and onsite Delivery Centers, placed in Qatar and India
* QA E2E Delivery Lead for Integration and Automation testing
* Release management for the Fulfilment and Inventory software (Comptel)
* System Integration Test Strategy development and implementation
- I joined an ongoing red flagged project and after discussions with project and line management I
agreed to try and started with a mitigation plan, which was accepted despite going over the budget,
increasing in the next month the size of the team from 5 to 10 members and get 2 more months
until RFA
* System Integration Test Plan development and implementation
- During on site period I decided together with the Solution architects to start from scratch
(scraping 8 months of previous work) the System test plan; a 2 weeks effort in prioritizing and
writing over 1000 scenarios covering only the most important sunny day scenarios.
* Review and support the work done by team members
* Environment configuration and preparation




* Demos for the customer with the newly integrated functionalities
* Project, cost and resource planning
* Defect triage and management
* Daily test status reports
* Implementing automation for project regression suite
* Test Summary Report at the end of each release
* Provide mentorship for all the team members
* Customer facing roles:
- Demos
- Reporting
- Defect triage
- Escalation point

Solution Specialist

Chorus (New Zealand's National Broadband Network)
Telco operator
* Point of contact for local team regarding technical issues
* Defect support, confirmation and analysis, for all team members
* Worked closely with solution architects and technical lead
* Onsite support for critical releases
* Creation of High-level scenarios
* Backup as test manager
* Creation of Test report

Support and Maintenance Lead

NBN (Australia's National Broadband Network)
tier Telco operator
* Start and Lead a team of 3 in Romania
* Point of contact between local office and offshore offices in Australia and India
* Investigating, testing and delivering the fix in a timely manner of production defects
* Worked for 8 releases starting from release 14 (complex solution with numerous documents from
previous releases)
* Worked closely with solution architects and technical leads covering all components
* Provide mentorship for team members
* Daily status reports
* Regression planning

Software System Test Engineer

Continental Automotive
Projects:
FPK (Free Programmable Cluster)
* testing VAGs (VW, Audi, Skoda, Seat Group) product, instrument cluster (full digital dash), by analyzing
requirements, creating test cases - with requirement traceability, manipulating simulation software
with a sequential programming method (uTAS - United Test Automation sequencer) therefore
improving efficiency (automatization) for numerous functionalities.




Graphic Modeling Tool
* I was involved as a coordinator in a new automation project. This required modeling the cluster as
HMI in GMT (graphic modeling tool developed internally), creating reference pictures of the display in
GS (graphic simulation tool developed internally) based on the customer graphic specification that were
compared pixel by pixel with actual pictures captured from our clusters during automated test by the
FrameGrabber (FPGA physical tool created internally).
* the modeling team was formed of 5 people, 3 developers and 2 system test engineers.
* this required from my side to create scripts in C# using GMTs APIs to create reference pictures
generated by GS, adapting the existing automation to support FrameGrabber screenshots, handling DBs
and modeling tool resources.
* our most important achievement consisted in creating fully automated warnings language tests, and
comparing more than 20k screenshots, saving time and reducing human error by cutting out a
tremendous amount of manual work.
* the effectiveness of our solution conducted to it being presented, sold and implemented in other
Continental projects.

Business Consultant

VDN BASE
* Worked in a team with average size of 10 people.
* Successfully implemented a management system organized in 25 standards each with specific
procedures.
* Offered a web-based platform for over 50 customers for document tracking, change management and
interaction with the customer.
* Handled over 10 customers with regulate visits on site.

E-Commerce Consultant

Marbis
* Worked in a team with average size of 4 people.
* Management and optimization of a Joomla based website.
* Sales analysis and market adaptation of the software.
* Graphic work for promoting our products.

Contact form

Log in to get in touch

You need to be logged in to use the contact form.

Sign upLog in