09/06/2022 updated


100 % available
Contract Administrator, Cost Estimator Supervisor, Procurement, Contract Administrator/ Procurement
Venezuela
Venezuela
BACHELOR DEGREE. CIVIL ENGINEERMicrosoft ExcelHVACTelecommunicationsChemical ProcessClaim ProcessingContract NegotiationManagement AccountingInstrumentationFire Alarm SystemsEmployee BenefitsFurnacesPipes (Fluid Conveyance)RefineryInsulatorLighting
Selection Process, Bid Packages Preparation, Bid Commercial Evaluations, Contractual Claims. Handling of Change Orders and Contract, Discussion prices contract and Back charges, contract negotiation, Unit Price Contracts, Cost Reimbursable Contracts, Analysis of the wages, hours of work and fringe benefits, rights in the work place, agreement beginning and end dates, Cost Control, meeting minutes, Payments elaboration, Change Procedures Elaboration, The Contract documents preparation. Escalatory formula. Risk Analysis .Procurement.
Mechanicals Works: On-shore and Off-shore Pipelines, Production Facilities, Flow stations, Compressor Stations, Meter Stations, Pump Stations, Offshore fixed and Onshore Production Facilities, Oil Terminal and Tank Farm, Blow down /Vent / Relief / Flare, Furnace, Boiler, Drumps, Spool, Piping prefabrication and surface Preparation, Refinery Process Units, Petrochemical & Chemical Process Units, Utility Systems, Product Stabilizers, Compression, Gas Dehydration, LNG, LPG Recovery, Oil Dehydration, Oil and Gas Storage, Sour Gas Treating, Water Treating, Temporary Facilities, Heavy Lifting, Security Guards Services, Earth Works, Pipe rack, Civil & Concrete Works, Building Works, Duct Banks, Tailings ponds, Pavements Road, Utility & Sanitary, Sewer & Drainage Works, Cooling Tower, Electrical Works, Lighting, Instrumentation Works, Fire Alarm Systems, Insulation works and dress-up equipment, Communication System.
Mechanicals Works: On-shore and Off-shore Pipelines, Production Facilities, Flow stations, Compressor Stations, Meter Stations, Pump Stations, Offshore fixed and Onshore Production Facilities, Oil Terminal and Tank Farm, Blow down /Vent / Relief / Flare, Furnace, Boiler, Drumps, Spool, Piping prefabrication and surface Preparation, Refinery Process Units, Petrochemical & Chemical Process Units, Utility Systems, Product Stabilizers, Compression, Gas Dehydration, LNG, LPG Recovery, Oil Dehydration, Oil and Gas Storage, Sour Gas Treating, Water Treating, Temporary Facilities, Heavy Lifting, Security Guards Services, Earth Works, Pipe rack, Civil & Concrete Works, Building Works, Duct Banks, Tailings ponds, Pavements Road, Utility & Sanitary, Sewer & Drainage Works, Cooling Tower, Electrical Works, Lighting, Instrumentation Works, Fire Alarm Systems, Insulation works and dress-up equipment, Communication System.
Languages
EnglishGoodSpanishNative speaker
Project history
Administrator contract -PROCUREMENT
Linsay CA .-
- (ENI- REPSOL) . Project Cardon IV (on shore /off shore) Gas Processing and civil works.
- (PDVSA- CNPC Joint venture) Petro Urica project. Heavy oil early production Facilities.
* MONLOSA S.A..
Buildings, civil works. PROCUREMENT
GODI, C.A.
Civil and electrical works. PROCUREMENT
Linsay CA .-
- (ENI- REPSOL) . Project Cardon IV (on shore /off shore) Gas Processing and civil works.
- (PDVSA- CNPC Joint venture) Petro Urica project. Heavy oil early production Facilities.
* MONLOSA S.A..
Buildings, civil works. PROCUREMENT
GODI, C.A.
Civil and electrical works. PROCUREMENT
* " Reconstruction " Edificio sede de Vepica". Guaicay. La Trinidad.
* Treatment Water Plant. Adecuacion de las Tomas del Rio Neveri. HIDROCARIBE
* PREFEASIBILITY STUDY REVIEW JUNIN 240 MPD(Upstream Facilities) Cost estimated Class IV. ENI de
Venezuela. ( SAEP) (ATP)
* Interlocks Systems & instrumentation Security Systems SIS. Detailed/ Basic Engineering Unity 12
and 31" Petrozuata, S.A, Jose Refinery. Anzoátegui Stated. Cost estimated Class II.
* PRE-FEASIBILITY STUDY OF JUNIN 5 BLOCKS PROJECT. CAPEX.-OPEX Cost estimated class V. ENI of
Venezuela
* Preparation of Bid Package for Electrical Station for Reconvertion Deep Project.
* Pre- Feasibility Study -Economic Study, Rail & Section Plant Project, Sensibility Analysis, EP
Rieles y Perfiles Company
* SINCOR Enhanced Oil Recovery (EOR) facilities" cost estimate class IV and class II phase Pre-feed
and Feed
* Long lead Item Equipments of the Teak Blowdown Project. Repsol E&P T&T Limited. Trinidad &
Tobago.
* Main Station Upgrade Project. MSUP: Sincor. Cost Estimated Class IV & II. 2007
* POUI WATER TREATMENT OPTIONS. Platform Off shore. Repsol--Cost Estimated
* TSP LIQUID METERING SYSTEM. Platform Off shore. Repsol--Cost Estimated
* WATER DISPOSAL AT TEAK E. Platform Off shore. Repsol--Cost Estimated
* TEAK COMPRESSOR DISMANTLING. Platform off-shore -Cost Estimated.
* TEAK BLOWDOWN. Platform. Repsol Cost estimated Off shore. 2006
* Cost Estimated, Elaboration Budget - CAPEX -REPSOL Trinidad 2007-2011.
* Skid HP. Flare Scrubber. Corocoro. Cost Estimate Class IV.CONOCO- PHILLIPS.
* Maintenance Plan 2007 for Sincor Plant. 2005. SINCOR
* Cable Monopole Replace .Electric Plant. Pueblo Viejo. CNPC -PDVSA
* Boiler and Fuel oil Adecuation & dispatch fuel System .PEQUIVEN
* Guajira Association Contract Extension. CHEVRON TEXACO
* Engineering Detail Flow Station EF-LL-77-1. CHEVRON- TEXACO
* Detail Engineering for The application of Fireproofing in Delayed Coking Unit 1300, 1400, 1500
1600 SINCOR.
* Free water Separator Pilot Modification. SINCOR
* Orifuels Sinoven,S.A. Orimulsion Project Plant. Sinovensa. Contract Administrator
* Valcor Plant Project -PDVSA-Chiyoda Corporation JCG-Vepica-Jantesa. Consortium Valcor . Contract
Administrator
* Basic design for the Field Facility System & Dehydration Desalting Plant Project - Sinovensa
* EPC for new Jose Shipping Terminal Project - TEJ Project - Ameriven
* PTO Desalting Plant (PDVSA)
* Pumping and Tank Increment Capacity Project for PTO Tank Farm PTO (PDVSA)
* Conceptual and Basic Engineering for Production Facilities, Maturìn (PDVSA)
* EPC Project for the Segregation Manifold and Gas Treatment Facilities, Muscar. (PDVSA)
* Basic Design for the Naphtha Hydrotreater Plant at CRP (PDVSA)
* Water Production Treatment for Production Main Station (SINCOR)
* Basic Design for the Diluents Pipeline COB - PTO (AMERIVEN)
* Basic Design for the Gas Pipeline COB - GUICO (AMERIVEN
* Bid preparation of Revamp Refinery Talara-Peru
* Increase Storage Pump ages Capacity PTO (Heavy Oil). (PDVSA)
* Treatment Water Plant. Adecuacion de las Tomas del Rio Neveri. HIDROCARIBE
* PREFEASIBILITY STUDY REVIEW JUNIN 240 MPD(Upstream Facilities) Cost estimated Class IV. ENI de
Venezuela. ( SAEP) (ATP)
* Interlocks Systems & instrumentation Security Systems SIS. Detailed/ Basic Engineering Unity 12
and 31" Petrozuata, S.A, Jose Refinery. Anzoátegui Stated. Cost estimated Class II.
* PRE-FEASIBILITY STUDY OF JUNIN 5 BLOCKS PROJECT. CAPEX.-OPEX Cost estimated class V. ENI of
Venezuela
* Preparation of Bid Package for Electrical Station for Reconvertion Deep Project.
* Pre- Feasibility Study -Economic Study, Rail & Section Plant Project, Sensibility Analysis, EP
Rieles y Perfiles Company
* SINCOR Enhanced Oil Recovery (EOR) facilities" cost estimate class IV and class II phase Pre-feed
and Feed
* Long lead Item Equipments of the Teak Blowdown Project. Repsol E&P T&T Limited. Trinidad &
Tobago.
* Main Station Upgrade Project. MSUP: Sincor. Cost Estimated Class IV & II. 2007
* POUI WATER TREATMENT OPTIONS. Platform Off shore. Repsol--Cost Estimated
* TSP LIQUID METERING SYSTEM. Platform Off shore. Repsol--Cost Estimated
* WATER DISPOSAL AT TEAK E. Platform Off shore. Repsol--Cost Estimated
* TEAK COMPRESSOR DISMANTLING. Platform off-shore -Cost Estimated.
* TEAK BLOWDOWN. Platform. Repsol Cost estimated Off shore. 2006
* Cost Estimated, Elaboration Budget - CAPEX -REPSOL Trinidad 2007-2011.
* Skid HP. Flare Scrubber. Corocoro. Cost Estimate Class IV.CONOCO- PHILLIPS.
* Maintenance Plan 2007 for Sincor Plant. 2005. SINCOR
* Cable Monopole Replace .Electric Plant. Pueblo Viejo. CNPC -PDVSA
* Boiler and Fuel oil Adecuation & dispatch fuel System .PEQUIVEN
* Guajira Association Contract Extension. CHEVRON TEXACO
* Engineering Detail Flow Station EF-LL-77-1. CHEVRON- TEXACO
* Detail Engineering for The application of Fireproofing in Delayed Coking Unit 1300, 1400, 1500
1600 SINCOR.
* Free water Separator Pilot Modification. SINCOR
* Orifuels Sinoven,S.A. Orimulsion Project Plant. Sinovensa. Contract Administrator
* Valcor Plant Project -PDVSA-Chiyoda Corporation JCG-Vepica-Jantesa. Consortium Valcor . Contract
Administrator
* Basic design for the Field Facility System & Dehydration Desalting Plant Project - Sinovensa
* EPC for new Jose Shipping Terminal Project - TEJ Project - Ameriven
* PTO Desalting Plant (PDVSA)
* Pumping and Tank Increment Capacity Project for PTO Tank Farm PTO (PDVSA)
* Conceptual and Basic Engineering for Production Facilities, Maturìn (PDVSA)
* EPC Project for the Segregation Manifold and Gas Treatment Facilities, Muscar. (PDVSA)
* Basic Design for the Naphtha Hydrotreater Plant at CRP (PDVSA)
* Water Production Treatment for Production Main Station (SINCOR)
* Basic Design for the Diluents Pipeline COB - PTO (AMERIVEN)
* Basic Design for the Gas Pipeline COB - GUICO (AMERIVEN
* Bid preparation of Revamp Refinery Talara-Peru
* Increase Storage Pump ages Capacity PTO (Heavy Oil). (PDVSA)
* Reconstruction & Supervision the "Teresa Carreño Theater"
* Detail Engineering and Consulting Upstream Sincor (SINCOR).
* EPC the Plant LASMO (LASMO).
* Detail Engineering and Consulting Upstream Sincor (SINCOR).
* EPC the Plant LASMO (LASMO).