09/06/2022 updated


100 % available
Mechnaical Completion, Commissioning, and Startup
Denpasar, Indonesia
Indonesia
Bachelor’s degree in Marine EngineeringHVACAuditingAutomationCertified Project Management ProfessionalChange ManagementCompressed Natural Gas (CNG)CommunicationDatabasesContent ManagementElectric Power DistributionHigh VoltageProcess EngineeringFire Alarm SystemsFire SafetyLeadership
Commissioning Multi Skills
Ability in Commissioning Project
Specific Skills in Start-up
Ability in Commissioning Project
- Project Management Professional (PMP)
- Planning and Schedule
- Change Management
- Cost Consciousness
- Leadership
- Interpersonal Skills
- Communication
- Teamwork
- Initiative
- Systemization
- Design
- Technical Skills
- Procedure’s development
- Database set up
- Quality & Quantity
- Safety and Security
- Risk assessment
- Problem Solving
- Leading Indicator
- Commissioning plan (ICCS)
- Commissioning Protocol
- Commissioning Engineering
- Commissioning Strategy
- Opercom Methodology
- Systemization & Sequence
- Database Completion (CMS)
- Check sheet & Test sheet
- Managing Critical Milestones
- Saving Cost
- KPI start-up
- Leading Indicator (LI)
- Reporting
- Presentation
- Automation Control
- Risk Management
- Problem-solving
- Lesson Learned
- Procedure development
- Organization/Resource
- Compressors & Pumps
- Gas/Steam Turbines
- HVAC & Fire detection
- Boiler & Pressure Vessel
- Pipelines
- Saving life Equipment
- Oil Processing system
- Gas compression system
- Water Treatment
- Leak test & Purging
- LO & Chemical flushing
- Process Control Narrative
- ICSS (DCS, ESD, and FGS)
- Loop test & Communication
- Hardware & Software PLC
- Logic Development
- SCADA Automation
- FRS
- Gas Insulated Switchgear
- Power Distribution
- Load test & Black Start
- High Voltage Operation
- Interlock & Relay Setting
- Diesel Genset & UPS
- HSE Procedures
- Line of Fire
- Safety awareness & Audit
- Hazop & Hazid & SIMOP
- Working at High Voltage
- AK3 Electrical Assessment.
- Ability Electrical permit
- Hydrogen Sulfide (H2S) L 2
- LOTO
- PTW L3
- JSA & JRA
- Human Factor
- T-BOSIET
- H2S OPITO
- Working at Hight
- Confine Space
Specific Skills in Start-up
- PSSR
- HSE Risk Assessment
- Pre startup Audit (PSU)
- Performance Test
- Operation
- Startup on Paper (SUOP)
- Integrated Site test
- Process system
- Utility system
- Start-up Readiness
- Verification Certificates
- Statement of Fitness
Experience
Professional experience10+ years
Languages
EnglishFluent
Project history
(Brownfield Complex Rejuvenation Project Champion 07 & AMPA09-at BRUNEI)
Scope: Topsides, Turbine Compressor, and Upgrade Automation (USD 2 B)
Provided pre-commissioning/commissioning expertise, for planning, execution and prepared high-level technical
document. Involved all activities in the design phase and controlled the preparation of the complete data for the Go
Completion Management system. Developed and reviewed pre-commissioning, commissioning, and start-up
procedures. Executed mechanical completion, pre-commissioning, commissioning, Start-up, and performance testing
for gas export compressor, sea water pump, ESD, DCS, FGS, Switchgear, safeguarding system, dry commissioning, wet
commissioning, etc. Managed resource and mobilization commissioning team and vendor. Provided input related to
design, quality issues, cost, Shut Down in/or Turn-Around.
Achievements
* Implemented project on paper (IPOP) for TA, USD, TSD resulted in minimize problems onsite commissioning.
* Implemented ICCS (Integrated Construction Commissioning Sequence) resulted in an on-time schedule.
* Successfully perform function tests dynamic commissioning and fault test during USD, TSD, and TA.
* Finished Performance test of Gas turbine compressor plant safeguarding on time resulted in saving cost.
Scope: Topsides, Turbine Compressor, and Upgrade Automation (USD 2 B)
Provided pre-commissioning/commissioning expertise, for planning, execution and prepared high-level technical
document. Involved all activities in the design phase and controlled the preparation of the complete data for the Go
Completion Management system. Developed and reviewed pre-commissioning, commissioning, and start-up
procedures. Executed mechanical completion, pre-commissioning, commissioning, Start-up, and performance testing
for gas export compressor, sea water pump, ESD, DCS, FGS, Switchgear, safeguarding system, dry commissioning, wet
commissioning, etc. Managed resource and mobilization commissioning team and vendor. Provided input related to
design, quality issues, cost, Shut Down in/or Turn-Around.
Achievements
* Implemented project on paper (IPOP) for TA, USD, TSD resulted in minimize problems onsite commissioning.
* Implemented ICCS (Integrated Construction Commissioning Sequence) resulted in an on-time schedule.
* Successfully perform function tests dynamic commissioning and fault test during USD, TSD, and TA.
* Finished Performance test of Gas turbine compressor plant safeguarding on time resulted in saving cost.
(Brownfield and New Platform Offshore FPSO Merakes project - at JAKARTA INDONESIA
Scope: FPSO, and Pipelines (USD 850 M)
Provided pre-commissioning/commissioning expertise, for planning, execution and prepared high-level technical
document. Defined list of subsystems/systems, mark up battery limit, check sheets, test sheets, and PIMS database
set up. Reviewed the P & ID, SLD, 3D model, vendor documents, HAZOP, HAZID, Cause & Effect matrix, and FAT
procedure. Reviewed leak test procedure, flushing procedure, Loop test, and operating test procedures. Provided
input related to design, quality issues, cost, and Shut Down in/or Turn-Around. Developed both procedures the logic
of execution plan and handover plan. Managed execution commissioning activities and assist the start-up for the Gas
processing system, inlet pig trap, slug catcher, lifting equipment, turbine generator, ICSS, chemical, export gas
compressor. Controlled the budgets, manpower, material, and tools.
Achievements
* Completed all leak tests for 20 subsystems within two weeks.
* Completed all Automation loop tests, Electrical Interlock, and communication on time resulted saving costs.
* Signed the Ready for Startup certificate on time as milestone targeted.
* Completed execution of performance test/trial test within one week.
Scope: FPSO, and Pipelines (USD 850 M)
Provided pre-commissioning/commissioning expertise, for planning, execution and prepared high-level technical
document. Defined list of subsystems/systems, mark up battery limit, check sheets, test sheets, and PIMS database
set up. Reviewed the P & ID, SLD, 3D model, vendor documents, HAZOP, HAZID, Cause & Effect matrix, and FAT
procedure. Reviewed leak test procedure, flushing procedure, Loop test, and operating test procedures. Provided
input related to design, quality issues, cost, and Shut Down in/or Turn-Around. Developed both procedures the logic
of execution plan and handover plan. Managed execution commissioning activities and assist the start-up for the Gas
processing system, inlet pig trap, slug catcher, lifting equipment, turbine generator, ICSS, chemical, export gas
compressor. Controlled the budgets, manpower, material, and tools.
Achievements
* Completed all leak tests for 20 subsystems within two weeks.
* Completed all Automation loop tests, Electrical Interlock, and communication on time resulted saving costs.
* Signed the Ready for Startup certificate on time as milestone targeted.
* Completed execution of performance test/trial test within one week.
(Brownfield and New Facility Onshore LNG-Brownfield NCDT project - British Petroleum, BP)
Scope: LNG Facilities & Utilities (USD 800 M)
Defined scope of work and prepared LOSH markup. Developed, managed, and delivered the means, methods of the
commissioning execution strategy, schedule, and cost. Reviewed and approved check sheets, test sheets, FAT, SAT
procedures, dossier, and handover documentation. Executed commissioning and start-up activities to achieve RFSU
readiness for start-up, ramp-up, and performance tests for Condensate system, Diesel system, transfer pump, Tanks,
Electrical system, Control, automation system, and other utilities. Reduced critical potential delay, mitigated risks, and
ensured achieving the milestones target. Managed resource, mobilization commissioning team and vendor. Provided
input related to design, quality issues, cost, and Shut Down in/or Turn-Around.
Achievements
* Completed leak tests for 20 Subsystems within one week.
* Finished Automation loop check, Electrical interlock, and PLC communication to HMI on time.
* Completed Dynamic Commissioning on time resulted in saving cost.
* Achieved the milestone Ready For Startup within on time.
Scope: LNG Facilities & Utilities (USD 800 M)
Defined scope of work and prepared LOSH markup. Developed, managed, and delivered the means, methods of the
commissioning execution strategy, schedule, and cost. Reviewed and approved check sheets, test sheets, FAT, SAT
procedures, dossier, and handover documentation. Executed commissioning and start-up activities to achieve RFSU
readiness for start-up, ramp-up, and performance tests for Condensate system, Diesel system, transfer pump, Tanks,
Electrical system, Control, automation system, and other utilities. Reduced critical potential delay, mitigated risks, and
ensured achieving the milestones target. Managed resource, mobilization commissioning team and vendor. Provided
input related to design, quality issues, cost, and Shut Down in/or Turn-Around.
Achievements
* Completed leak tests for 20 Subsystems within one week.
* Finished Automation loop check, Electrical interlock, and PLC communication to HMI on time.
* Completed Dynamic Commissioning on time resulted in saving cost.
* Achieved the milestone Ready For Startup within on time.