04/01/2024 updated


100 % available
Modeller and 3d designer.2D draftsman
Argentina
Worldwide
University studiesHTMLJava (Programming Language)Computer Animation3D ModelingAutodesk 3DS Max (3D Graphics Software)Computer-Aided DesignAutoCADAdobe IllustratorAdobe PhotoshopAutodesk InventorC++ (Programming Language)Computer SimulationSolidWorks (CAD)Optical Fiber CablingProduct Lining
3D MODELS, 3D design, 3D modeling, 3D modelling, Adobe Illustrator, Adobe Photoshop, AutoCAD, AutoCAD 2011, 3dSmax, Autodesk, Autodesk Inventor, C/C++, Animation, computer simulations, CAD, HTML, Application programming, Excel, Microsoft Office, Power Point, Word, design programs, Rhinoceros 3D, Google SketchUp, Solid Edge, SolidWorks, Solid Works
Experience
Professional experience0 - 5 years
Freelancer since2024
Languages
EnglishGood
Project history
Tasks performed : Design and modeling of assemblies of
mechanisms and machines for the preparation of plans of
individual parts that intervene in the engineering process.
Assembly drawings, exploded drawings, parts list, coding,
preparation for plotting, conversion of CAD drawings for plasma
cutting, CNC waterjet.
mechanisms and machines for the preparation of plans of
individual parts that intervene in the engineering process.
Assembly drawings, exploded drawings, parts list, coding,
preparation for plotting, conversion of CAD drawings for plasma
cutting, CNC waterjet.
Tasks performed: Maintain the correct functioning of the sector
on the beverage bottling line in returnable containers.
Maintenance of the devices that make up the line, packaging
analysis machines for reuse and xy-sorting. Chains and links of
the transportation system.
Cleaning of elements that could obstruct the transportation of
bottles on the production line. Painting and cleaning of the
entire line.
on the beverage bottling line in returnable containers.
Maintenance of the devices that make up the line, packaging
analysis machines for reuse and xy-sorting. Chains and links of
the transportation system.
Cleaning of elements that could obstruct the transportation of
bottles on the production line. Painting and cleaning of the
entire line.
(FTTH-HFC networks).
Tasks performed: Drawing of fiber optic network plans using
georeferencing. Design under the supervision of a work team.
Preparation of one-line diagrams.
List of materials.
Connection labels for connection boxes. Printing of scale plans.
Digitization of surveys.
Modification of plans according to work.
Tasks performed: Drawing of fiber optic network plans using
georeferencing. Design under the supervision of a work team.
Preparation of one-line diagrams.
List of materials.
Connection labels for connection boxes. Printing of scale plans.
Digitization of surveys.
Modification of plans according to work.