ABAP, Windows 2000 / XP / Vista, windows 2003 server, HP UNIX 4, Database, SQL, Oracle, Sybase 4, Packages MS Office 4, ERP SAP 4, SAP, 12c, Interface, HANA, DB, Oracle Database, SQL DB, Windows 2003, SAP Basis, BPC, Backup, SAP R/3, HP UNIX, SOX, IDoc, IDoc server, System Monitoring, FI, system status, VB
Project history
12/2020
-
12/2020
Sr. SAP BASIS Consultant
Ahana systems
1.Current Company: Ahana systems, Bangalore.
Client : AMNS(ESSAR Steel)
Designation: Sr. SAP BASIS Consultant
Job Responsibility: Ensure 24/7 support for All SAP Systems
Oracle Upgrade 11g to 12c
Patching and Kernel Upgrade.
L2 & L3 Ticket support
Mentoring juniors for L2 and L3.
To ensure Client is following SAP Best Practices
Support for New Banking Interface
ADS Troubleshooting
Support and Assistance for Domain Change Activity for All SAP Landscape
Certificate Change Activity for Carve out Project
Solution Manager Re Configuration after Domain Change
Audit Handling
Assisting Client in Migration from Oracle to HANA DB and S/4 Hana
HANA Reports, BSR Reports, Custom code reports etc..
12/2020
-
12/2020
Team Member
Tech Mahindra
Environment : ECC 5.0, Solution Manager 4.0
Team Size :12 members
Duration : 1 month
Project Exposure (Implementation / Support Project)
* Installation and configuration of ECC 5.0
* Installation and configuration of Solution Manager 4.0
* Authorization and Security
* Support package Manager and Patch up gradation
* Client Copy
12/2020
-
12/2020
Team member
E2V Technology Ltd.
Project :
Client : E2V Technology Ltd.
Role : Team member
Environment : SAP R/3 4.7
Team Size : 8 members
Duration : 9 months
Project Exposure (Support Project):
* Project planning & detailing for IDoc requirement
* Connection between SAP and IDoc server
* In Bound and Out bound Directories set up
* Identification of IDoc Types
* Setting up Port for IDoc configuration
* Posting program for IDoc
* Service programs for IDoc Processing
12/2020
-
12/2020
Team Member
Client : Lloyds Steel
Role :Team Member
Environment : ECC 5.0
Team Size : 12 members
Duration : 1 Month
Project Exposure (Support Project):
* Project Planning and Strategy for Archiving
* Archiving of FI Objects
* Archiving of SD Objects
* Configuration of archiving Object links
* Configuration of Archiving Directories path
* Re organization of Tables
12/2020
-
12/2020
Team Member
Josts Engineering Ltd
Environment : ECC 5.0
Team Size : 12 Members
Duration : 1 Month
Project Exposure (Support Project):
* Recovery of lost DDIC and SAP* Passwords
* Unlocking of SM01
* Maintenance of Check list for system status and heath
* Patch Up gradation for ABAP, Basis and logistic
* End User Training for Patch uploading and other Basis Activities
* System Monitoring for Logs and Dumps
* Database Growth Monitoring
12/2020
-
12/2020
Team Member
NON SAP Experience
Client :Koyal Textiles
Role : Team Member
Environment : VB/Oracle
Team Size : 5 Members
Duration : 2.4 Years
12/2017
-
04/2020
Sr. Basis Consultant
Engibrains Technologies
Client: Siyaram, Mumbai.
Solution Manager 7.2 SP9 Installation
Solution Manger Configuration
Defining Timelines for Installation and Configuration for Solution Manager
Net weaver version upgrade 7.40 to 7.50
EWA setup
HANA system Monitoring
HANA Revision update
Housekeeping jobs
Mentoring juniors
Defining Project Timelines for New Projects
Designing Road maps
05/2017
-
11/2017
Team Lead
Adarsh Credit Society/Adarsh Banking
Ensure 24/7 SAP support
HANA Revision update
HANA SPS Upgrade
Mentoring juniors for Level L2 and Level L3
GST Implementation
Evaluation of New SAP Products
Defining and designing Road map for upgrade
Resource Management
10/2016
-
03/2017
Sr. Basis consultant
Atos
Support Project for Monsanto, NAM
Responsible for Non Production and Production window Activates
Responsible for Shift as a Sr Basis consultant
Recycle Products
Provide Support In case of Unplanned Outage and Event
Implementation for New Change in production Environment
Support for other Projects
Mentoring juniors for Level L2 and Level L3
01/2009
-
05/2015
SAP Basis Manager
Financial Technologies Ltd
Environment : SAP ECC 6.0, 7.0, BPC 5.0, Solution Manger 7.0
Team Size :10 members
Duration :Jan 2009 to May 2015
Project Exposure (Implementation / Support)
* Cluster Installation as well as administration with SQL and Oracle Database
Of ECC 6.0, BI 7.0 and BPC 5.0
* Solution Manager Configuration
* SAP Landscape Transformation (2.0) Configuration
* ADS configuration
* Digital Signature Configuration
* Single Sign on configuration
* EHP1-EHP4 Upgrade
* ITS configuration
* Planned Activities Performed:
* System Refresh ( SQL DB on Windows 2003 SR2)
* Kernel Upgrade
* Support Patches- Add-on Upgrade
* Client Copies (Local, Remote, Client Export/Import), Client Deletion.
* Note Implementation
* Transport Management System (Configuring, troubleshooting errors, devising of release
strategy).
* Analyzing Early Watch reports and implementing necessary changes.
* Spool Administration.
* Documentation of standard operating procedures.
* Handling of Internal and External Audits.
* Active Team member of ISO IEC 20000:2005 implementation Team
* Vendor Management ( Selection, Defining SLA, Commercials)
* Proposal Designing
* Designing and Implementation of various polices for Internal and External Audit Compliance
* Gathering client requirements and Recommend solutions
11/2007
-
09/2008
Team Lead/Backup Project Leader (IT Analyst)
Tata Consultancy Services
Client : Tata Communications Ltd.
Role : Basis Team Lead / Backup Project leader
Environment : SAP R/3 4.7
Team Size : 11 members
Duration : 10 Months
Project Exposure (Support Project)
* Project Monitoring & coordination and Project reviews
* Project & people issue management
* System Refresh(HP UNIX and ORACLE)
* Implementation of SOX Controls
* SAP Authorization and Security
* Designed and Implantation of Process and Controls
* Handling of External Audit
06/2006
-
11/2007
SAP Consultant (Technical Associate)
Tech Mahindra Ltd
Client : MEA, Bangkok
Role : Team Member
Environment : ECC 6.0
Team Size : 18 members
Duration :7 Months
Project Exposure (Implementation / Support Project)
* Requirement capture and analysis of Business Processes.
* Business process mapping on SAP Work Flow
* Work Flow Engine Configuration
* Administration of Business Process
* Disconnection and Reconnection work flow
* Device Removal workflow
* Triggering of work order
10/2005
-
06/2006
Basis Consultant
Client : Finolex Cables
Role : Team Member
Environment : SAP R/3 4.7
Team Size : 6 members
Duration :3 Months
Project Exposure (Implementation Project):
* Project planning & detailing for HR Implementation
* Requirement capture and analysis.
* Client Transport (Export/Import)
* Patch uploading for ABAP, BASIS and HR Module
* Change and Transport Management System
* Setting up Operation Nodes
Client : Firestone
Role : Team Member
Environment : SAP R/3 4.7
Team Size : 6 members
Duration :2 Months
Project Exposure (Support Project):
* Remote Client Copy
* SAP IDES Installation
* Change and Transport Management System
* Kernel Up gradation
* System Monitoring
* Database Monitoring
* Maintaining of Daily Check list and logs and System Heath Status
* Designing of Process and Controls for Application and Database
* Patch Uploading for ABAP, BASIS and Logistic
* Trouble shooting for Transports and system Logs
Local Availability
Only available in these countries:
India
Sr. Basis Consultant, Team Lead, Sr. Basis consultant
Follow profile
You need our Enterprise membership to view this information.