08/23/2026 updated
MJ
60 % partially available
SAP JIS/JIT Consultant + SD+PP+ABAP 15+ years of experience
Kielce, Poland
Only remote
IT, M.Sc. thesis title: Database conversion in Delphi environmentSAP ABAPSAP Customizing/KonfigurationSAP HANASAP ImplementationSAP LogisticsSAP MDMSAP ProjektmanagementSAP SCMSAP SDSAP Solution ManagerSAP DevelopmentSAP PP (Production Planning)SAP BAPISAP FioriSAP PP
Over 15 years experience with SAP. Specialization in SAP JIT/JIS solutions. Completly independent in desingning and implementing of JIT/JIS projects.
In July 2026 I successfully led a migration project for two production plants and 5 production lines for customer BMW (Spartanburg) from SAP JIT to the new SAP NJIT solution, where I was main solution architect for BMW process. At the same time I was supporting Honda process design as supporting solution architect.
Have strong experience and deep understanding in Master data modeling, standardization, migration and consistency check.
Experienced in SAP Migration Cockpit, Migration Object Modeller, LSMW, data consistency checks, data cleansing and archiving.
Expertise in SAP Tables, Fields, ABAP, OO ABAP, simple reports, debugging, CDS, RFC, enhancements.
Developed an advanced solution in S4 for checking production data consistency in material master data, BOM, routing, work center, material info record, classification document info record etc.
Developed import tool for complex routings where migration cockpit is unable to handle migration.
Design and programming of a complete solution for analyzing SAP data structures to filter out unused materials that can be eliminated/archived.
Author of complex classification model for the production company covering material and document classification, classification hierarchy and automatic class hierarchy creation/auditing.
Working knowledge of SAP ECC and S4 HANA modules SD, PP, VC, PLM, JIS/JIT.
Deep knowledge of EDI standards.
Experience
Professional experience10+ years
Freelancer since2017
Languages
EnglishFluentPolishNative speaker
Project history
NJIT solution design
Previous project sprint covered first wave of cutomers using JIS process (BMW and Honda) for plants located in North America.
Next wave covers another group of customers (BMW, Volvo, Daimler) for the next group of production plants.
Tasks:
- Process design and gap detection
- Cooperation with the EDI team for EDI signal mappings to Idoc
- Cooperation with external developers to provide all necessary features closing detected gaps for features which are not available in SAP NJIT standard solution.
- Developing additional functionalities, debugging and testing.
- Idoc mapping and processing for sequence call-offs.
- JIS addon configuration for planning, connection to production line PLC, production confirmation, delivery and shipment creation and ASN Idoc generation.
- Testing, cutover and hypercare
NJIT solution design - pilot
Solution architect.
First sprint (pilot) covered first wave of JIS cutomers using (BMW and Honda) for plants located in North America.
During this pilot implementation for new NJIT solution in S4/HANA I migrated to the new solution 2 BMW production plants located in North America (2 plants 5 production lines).
Tasks:
- Process design and gap detection
- Cooperation with the EDI team for EDI signal mappings to Idoc
- Cooperation with external developers to provide all necessary features closing detected gaps for features which are not available in SAP NJIT standard solution.
- Developing additional functionalities, debugging and testing.
- Full JIS process configuration including: Idoc mapping and processing for sequence call-offs
- JIS addon configuration for planning, connection to production line PLC, production confirmation, delivery and shipment creation and ASN Idoc generation.
- Testing, cutover and hypercare
- Cooperation directly with SAP experts during design phase.
Secondary solution architect
I also supported Honda process design as a secondary solution architect (2 plants, 3 production lines).
BMW G67/G69
Two new model codes G67 ICE and G69 ICE implemented into existing production flow of running models:
G65 ICE
G65 BEV
G05 ICE
G45 ICE
Complex mix of produce-to-sequence and pick-to-sequence concepts in one sequence stream.
Special requirement to mix loads for trailers loaded and shipped to two BMW halls:
- Hall 50: mix G05ICE + G65ICE in one sequence stream
- Hall 52: separate trailer for G65BEV
- Hall 52: mix G45ICE + G67/69ICE only in the last row together with G45ICE reorders
Additionally, all G65ICE, G65BEV, G67/69 finished goods should be sequenced at the same sequencing station while staying in three separate sequence streams.
Tasks:
- Process design and gap detection
- Cooperation with the EDI team for EDI signal mappings to Idoc
- Cooperation with the PLC line programmers
- Idoc mapping and processing for delivery forecasts, daily packages, and sequence calloffs.
- JIS addon configuration for planning, connection to production line PLC, production confirmation, delivery and shippment creation and ASN Idoc generation.
- Testing, cutover and hypercare