1. Drive/In-Building Walk Test Project -: Drive Test and Walk Test multi floors data post
processing and Making Benchmark reports for HALO DAS Network, Crown Castle, AT&T, Boingo, RSRF,
T-Mobile.
2. Macro Modification Project "4xRx4xTx, CBRS and C-Band" Upgradation -: Making SOW Scope of Work
details and Plumbing Diagram for RED-RFDS
(800+ sites design)
Construction Drawing CD review and verifying the CD is designed according to RFDS (500+
sites)
3. Macro Modification Project "L600, 4xRx4xTx, CBRS, PCS, 5G BBU Upgradation-: RFDS and CD QC
Review (250 to 300 sites)
4. Small Cell Design using the Starling data in the MapInfo Pro
(940 sites)
a) Ring Identification
b) Candidate Selection
c) Location Selection
d) Antenna Selection
e) HUB Capacity & Fiber Distance Analysis
5. Macro & Small Cell COP Project-: Close out Package Review and QC (250 to 300 Sites
Review)
* Checking and Verifying -:
LOS, GPS Screen Shot, Antenna Alignment, RAD Center Tape Drop, Weather shielding,
Antenna and Radio Port Connection - Using Port Metrix Sheet, Grounding, Sweep & PIM
Test - If required, Antenna Alignment Report, CD's (Permitted Set and As-Builts)
* Equipment Knowledge -: Nokia 4G & 5G AirScale RAN & Remote Equipment, Ericsson (BBU, Antenna &
Remote Equipment), Commscope & JMA & Andrew Antenna Etc.
6. Optimization Project -:
a) Macro Optimization Project -: Drive Test Data Processing
b) iDAS Venue Inbuilding Optimization Project -: Pre-Walk Test Data Processing
(Review & QC) and Give Suggestions for Optimization and then Making Final
Improvement Report using Post Walk Data.
* Projects-: Venues including - NFL Stadium, Airports, Hospitals and large retail building etc.)