02/19/2024 updated
MS
100 % available
RF Engineer
Dewas, India
Worldwide
Bachelor of Engineering (Electronics & Communication)LTE (Telecommunication)Geographic Information SystemsTelecommunicationsDrive TestingGoogle EarthLog FilesMultiple-Input and Multiple-Output (MIMO)Radio Frequency EngineeringMapInfo Pro
I have 5+ years of 4G LTE/ 5GNR planning, Designing, integration, Optimization and inbuilding DAS experience of top two USA based telecom carrier.
I have worked in the T-Mobile L600, CBRS, Anchor projects and Verizon C-Band, CBRS, MIMO integration projects.
I am expert in making and reviewing RFDS, CD's, Close Out Package of Site, Port matrix sheets, REC doc. Etc
I wrote 800+ sites Scope of work for 5G integration based on the requirements.
I am also expert in the GIS data analysis work using MapInfo Pro, Atoll, Actix, Google Earth and MS office.
Walk Test/Drive Test - log file processing and making benchmark reports.
Vendor experience - Ericsson and Nokia equipments, Comsscope & JMA Antennas.
I have worked in the T-Mobile L600, CBRS, Anchor projects and Verizon C-Band, CBRS, MIMO integration projects.
I am expert in making and reviewing RFDS, CD's, Close Out Package of Site, Port matrix sheets, REC doc. Etc
I wrote 800+ sites Scope of work for 5G integration based on the requirements.
I am also expert in the GIS data analysis work using MapInfo Pro, Atoll, Actix, Google Earth and MS office.
Walk Test/Drive Test - log file processing and making benchmark reports.
Vendor experience - Ericsson and Nokia equipments, Comsscope & JMA Antennas.
Experience
Professional experience5 - 10 years
Freelancer since2018
Languages
ArabicGoodEnglishGoodHindiNative speaker
Project history
1. Drive/In-Building Walk Test Project -: Drive Test and Walk Test multi floors data post
processing and Making Benchmark reports for HALO DAS Network, Crown Castle, AT&T, Boingo, RSRF,
T-Mobile.
2. Macro Modification Project "4xRx4xTx, CBRS and C-Band" Upgradation -: Making SOW Scope of Work
details and Plumbing Diagram for RED-RFDS
(800+ sites design)
Construction Drawing CD review and verifying the CD is designed according to RFDS (500+
sites)
3. Macro Modification Project "L600, 4xRx4xTx, CBRS, PCS, 5G BBU Upgradation-: RFDS and CD QC
Review (250 to 300 sites)
4. Small Cell Design using the Starling data in the MapInfo Pro
(940 sites)
a) Ring Identification
b) Candidate Selection
c) Location Selection
d) Antenna Selection
e) HUB Capacity & Fiber Distance Analysis
5. Macro & Small Cell COP Project-: Close out Package Review and QC (250 to 300 Sites
Review)
* Checking and Verifying -:
LOS, GPS Screen Shot, Antenna Alignment, RAD Center Tape Drop, Weather shielding,
Antenna and Radio Port Connection - Using Port Metrix Sheet, Grounding, Sweep & PIM
Test - If required, Antenna Alignment Report, CD's (Permitted Set and As-Builts)
* Equipment Knowledge -: Nokia 4G & 5G AirScale RAN & Remote Equipment, Ericsson (BBU, Antenna &
Remote Equipment), Commscope & JMA & Andrew Antenna Etc.
6. Optimization Project -:
a) Macro Optimization Project -: Drive Test Data Processing
b) iDAS Venue Inbuilding Optimization Project -: Pre-Walk Test Data Processing
(Review & QC) and Give Suggestions for Optimization and then Making Final
Improvement Report using Post Walk Data.
* Projects-: Venues including - NFL Stadium, Airports, Hospitals and large retail building etc.)
processing and Making Benchmark reports for HALO DAS Network, Crown Castle, AT&T, Boingo, RSRF,
T-Mobile.
2. Macro Modification Project "4xRx4xTx, CBRS and C-Band" Upgradation -: Making SOW Scope of Work
details and Plumbing Diagram for RED-RFDS
(800+ sites design)
Construction Drawing CD review and verifying the CD is designed according to RFDS (500+
sites)
3. Macro Modification Project "L600, 4xRx4xTx, CBRS, PCS, 5G BBU Upgradation-: RFDS and CD QC
Review (250 to 300 sites)
4. Small Cell Design using the Starling data in the MapInfo Pro
(940 sites)
a) Ring Identification
b) Candidate Selection
c) Location Selection
d) Antenna Selection
e) HUB Capacity & Fiber Distance Analysis
5. Macro & Small Cell COP Project-: Close out Package Review and QC (250 to 300 Sites
Review)
* Checking and Verifying -:
LOS, GPS Screen Shot, Antenna Alignment, RAD Center Tape Drop, Weather shielding,
Antenna and Radio Port Connection - Using Port Metrix Sheet, Grounding, Sweep & PIM
Test - If required, Antenna Alignment Report, CD's (Permitted Set and As-Builts)
* Equipment Knowledge -: Nokia 4G & 5G AirScale RAN & Remote Equipment, Ericsson (BBU, Antenna &
Remote Equipment), Commscope & JMA & Andrew Antenna Etc.
6. Optimization Project -:
a) Macro Optimization Project -: Drive Test Data Processing
b) iDAS Venue Inbuilding Optimization Project -: Pre-Walk Test Data Processing
(Review & QC) and Give Suggestions for Optimization and then Making Final
Improvement Report using Post Walk Data.
* Projects-: Venues including - NFL Stadium, Airports, Hospitals and large retail building etc.)