03/10/2024 updated
AM
100 % available
Experienced Team of Robot and PLC Programmers
Mikołów, Poland
Worldwide
AutomationWeldingControl SystemsVMware ESX ServersGas Metal Arc WeldingElectrical Installation WorkSimatic S5 PLCTia PortalFanucKukaPCS 7
I possess extensive experience in the industrial automation sector, having successfully led the commissioning of welding and MIG welding stations. I have designed control systems for entire factories producing animal feed and for chemical reactors. I have launched a many palletization workstations and intralogistics lines. Together with my team, we continuously try to expand our competencies and increase our clients' satisfaction. I am confident that our collective experience, as well as that of each team member, will help in the efficient execution of your projects and goals. We have a wide range of skills, with each of us sharing our knowledge. We communicate in English, and if desired by the client, we provide a German-speaking project manager.
The number of specialists in a given field and their availability are determined individually.
PLC Programmers - up to 10 people
Roboticists - up to 5 people
Electrical Designers - up to 4 people
electrical installation fitter - 10 people
The number of specialists in a given field and their availability are determined individually.
PLC Programmers - up to 10 people
Roboticists - up to 5 people
Electrical Designers - up to 4 people
electrical installation fitter - 10 people
Experience
Professional experience5 - 10 years
Freelancer since2024
Languages
GermanFluentEnglishFluentPolishNative speaker
Project history
Translation Polish-English-German
On-site Documentation Recovery
Update Existing Documentation
Rewriting of existing documantation - old format to Eplan files
On-site Documentation Recovery
Update Existing Documentation
Rewriting of existing documantation - old format to Eplan files
•Migration of PCS7 + BATCH V6.0 to V9.0
•Virtualization of an existing PCS7 + BATCH project to SiVAAS on a new server.
•Expansion of the PCS7 + BATCH installation with a new mixer and tank.
•Delivery of a new PCS7 + BATCH system on SIVAAS service servers. Fiber optic network configuration.
•Supply of a new PCS7 V9.1 + BATCH control system for controlling a chemical reactor in the Ex zone.
•Migration of a weighing system based on SAIA controller to the existing PCS7 9.0 + BATCH system.
•Migration of raw material storage and production to the existing PCS7 9.1 + BATCH system.
•Virtualization of an existing PCS7 + BATCH project to SiVAAS on a new server.
•Expansion of the PCS7 + BATCH installation with a new mixer and tank.
•Delivery of a new PCS7 + BATCH system on SIVAAS service servers. Fiber optic network configuration.
•Supply of a new PCS7 V9.1 + BATCH control system for controlling a chemical reactor in the Ex zone.
•Migration of a weighing system based on SAIA controller to the existing PCS7 9.0 + BATCH system.
•Migration of raw material storage and production to the existing PCS7 9.1 + BATCH system.
- Several welding stations on Fanuc and ABB robots
- A team of programmers working at the Opel factory - FANUC
- A lot of palletizing stations on ABB
- Fanuc robots Assembly stations on KUKA robots