RL

Robert Lutz

available

Last update: 06.09.2022

Senior Berater, Projektmanager im Bereich Automotive IT und/oder Chipkarte

Graduation: Diplomingenieur Elektrotechnik, Schwerpunkt Datentechnik und Informatik
Hourly-/Daily rates: show
Languages: German (Native or Bilingual) | English (Full Professional)

Skills

Projektmanagement / Beratung / Schulung / Qualitätsmanagement und -sicherung / Test Engineering / IT-nahe Ingenieurdienstleistungen

Erfahrung in
- Projektleitung, Projektmanagement, Führen von internationalen Projektteams
- Entwicklung und Produktion von Automotive ECUs (PKW + LKW)
- Entwicklung und Produktion von Chipkarten (SmartCard, Chipcard), auch unter Hochsicherheitsbedingungen,
- Applikationen rund um die Chipkarte
- Erfahrungen in Beratung / Consulting im Bereich Automotive / Kryptographie / SmartCard / Embedded

Project history

09/2017 - Present
Technischer Projektmanager (Development of Climate Control for Buses)
Wabco (Automotive and vehicle construction, >10.000 employees)

WABCO supplies Climate Control Units to the leading bus OEMs in the world. As Technical Project Manager I led the project team in an update Project for the product HVAC-NG. Besides several CRs adding some functionality to the device we had to change the housing. A different front panel was connected using a different and new communication module.

06/2017 - 08/2017
Technical Project Lead (Telematic Control Unit)
Valeo Peiker (Automotive and vehicle construction, 500-1000 employees)

Valeo Peiker is part of the Valeo Driver Assistance Systems Business Group. On the site in Friedrichsdorf near Frankfurt Valeo Peiker Telematics are developed and produced. I was involved in the setup of a Telematics Control Unit demo board including the planning for
external suppliers for hardware and software development.

07/2016 - 11/2016
Projectmanagement Rollout Radarsystems
Autoliv (Automotive and vehicle construction, >10.000 employees)

Autoliv develops and produces radar systems for cars. I was an interim project manager for a project for Daimler. I was responsible for the rollout of a radar system in three variants to about 45 different types of Mercedes and AMG cars, while the system was still under development. One of my tasks was the preparation of the offer for the rollout including requirements discussions with Daimler, effort estimation, preparation of testing and risk management. In parallel, the first steps of the rollout were executed including a weekly report at Daimler in Sindelfingen.

05/2015 - 03/2016
Project & Sample Manager (Electric Power Steering)
Hella (Automotive and vehicle construction, >10.000 employees)

HELLA has developed a steering control module for electromechanical power steering that enables the demand-driven operation of the EPS, thereby increasing the vehicle’s fuel economy.
The construction basis of the module is a complex aluminum die-cast part. Besides its function as a mechanical basis, the part is a heat sink for power electronics.
One of my functions was to give the purchasing department technical help to increase the quality of the part while reducing the costs for it in running series. My team had members responsible for construction, purchasing, supplier quality, quality towards customer, calculation and more. Visits to and discussions with the suppliers were part of my duties.
Another task was to restructure the planning and steering of sample production and validation of new generations of about 50 EPS ECU variants. The samples had to be produced in the sample workshop or the series factory, partially under the involvement of the customer. Validation tests had to be performed with the samples. The longest tests ran up to four months.

06/2012 - 12/2014
Projectmanager (Development of Brake ECU ABS E8 SCANIA Frame)
Wabco (Automotive and vehicle construction, >10.000 employees)

WABCO is a world market leader for brake systems for commercial vehicles. As a leading project manager, I was responsible for the development of a new frame positioned ABS ECU for the customer SCANIA.
Besides ABS the ECU includes different other functionalities around brake and power train like electronic braking limitation and traction control.
Special challenges in this project were the extremely high-quality expectations of the customer SCANIA as well as the introduction of a new housing technology to WABCO development and manufacturing.
My area of responsibility included to discuss and agree on the customer requirements, development of hardware, software, and housing, supplier management, sample preparation, and delivery, testing as well as preparing the WABCO production up to the SOP.

04/2011 - 09/2014
Projectmanager (Development of Brake ECU ABS E8 IVECO)
Wabco (Automotive and vehicle construction, >10.000 employees)

WABCO is a world market leader for brake systems for commercial vehicles. As leading project manager, I was responsible for the development of a new braking system for medium-weight commercial vehicles including a cabin ABS ECU and an ESC for the customer IVECO.
Besides ABS the ABS ECU includes different other functionalities around brake and power train like electronic braking limitation and traction control.
Special challenges in this project were various adaptations to changing requirements of the customer IVECO as well as a very tight timing.
My area of responsibility included to discuss and agree on the customer requirements, development of hardware, software and housing, supplier management, sample preparation, and delivery, testing as well as preparing the WABCO production up to the SOP. I supported the IVECO SOP on-site in Brescia, Italy, as well.

09/2010 - 12/2010
Projektmanager (Project Reporting, Sample Planning)
Lear Corporation (Automotive and vehicle construction, >10.000 employees)

Project management for ECUs for LED Headlights (Smart Power, Automotive), especially support while a new PjM reporting tool was introduced for the location and several projects (project management office tasks).
Development, test, and introduction of a new database supported planning tool for sample preparation and delivery for various projects.

Local Availability

Only available in these countries: Germany
Europa, D-A-CH, Raum Hannover
Profileimage by Robert Lutz Senior Berater, Projektmanager im Bereich Automotive IT und/oder Chipkarte from Senior Berater, Projektmanager im Bereich Automotive IT und/oder Chipkarte
Register