DETAILS OF JOBS/WORKS COMPLETION IN INSTRUMENTATION/AUTOMATION :
* ISS Fabrication of Instruments support stand
* Conduit work for PA,FA & Intercom Telephone System
* Delayed Neutron Monitoring System Cabinet Erection,SS Tubing
* Terminal Automation System(TAS)-construction, erection, installation & commissioning
* Fuel Management System(FMS)
* Team Handling Capacity & Leadership up to 200 nos. of manpower during R&M project & Shut Down
project successfully for C&I at NTPC Rai bareli.
* ISOIL P.D. Meter, RF ID Tag, GSM Modem, TA-2331 & Heconomy Electronic/Auto Fuel Terminals,
Electronic Nozzle Unit, Solenoid Valve, VFD,German software Hec-poll
* Panel & J.B. erection, Cable Tray work, Cable laying & Termination as per Ferrule details.
* Full plant Boiler Instrumentation (Erection,Calibration & Commissioning).
* Steam Drum Level control & Instrumentation.
* Draft Transmitters for FD, SA & ID fan, Furnace, Economizer, Boiler outlet etc.,
* Thermocouple & RTD.
* Attemperator Control Valve.
* Soot-Blower Control Valve.
* Feed Water Control Station & Orifice Impulse piping.
* Dearetator Level & Pressure control & instrumentation.
* Super heater temperature control.
* Application of Differential Pressure Transmitters.
* Use of PID controllers.
* PRDS(Pressure Reducing & De-Superheating Station)