09/06/2022 updated


100 % available
Senior Consultant SAP MM, SAP EWM and SAP IS OIL
Hyderabad, India
India
B.Tech Mechanical EngineeringManufacturingMaterials ManagementSAP ApplicationsSAP IS-USAP MMSupply Chain ManagementTeam-workingSAP EWM
SAP MM, SAP EWM and SAP IS OIL Consultant. Having a total 19 years of industry experience.
Out of 19 years A total of 7 years 2 months of Domain experience having House hold appliances and process industry Supply chain related exp.
Remaining 11 years 8 months into SAP MM, IS OIL and EWM related project experience.
During the tenure of 11 years 8 months as an SAP consultant. I have been working with various SAP projects on multiple manufacturing sectors.
I have worked for 2 IS OIL projects as an TSW consultant.
Also for Material management module I had an experinece of working for 5 projects.
Also I have 1 EWM related project experience.
During the tenure of SAP I have been working for multiple Implementation, Roll out and Support projects.
A good team player, consultant and lead.
Out of 19 years A total of 7 years 2 months of Domain experience having House hold appliances and process industry Supply chain related exp.
Remaining 11 years 8 months into SAP MM, IS OIL and EWM related project experience.
During the tenure of 11 years 8 months as an SAP consultant. I have been working with various SAP projects on multiple manufacturing sectors.
I have worked for 2 IS OIL projects as an TSW consultant.
Also for Material management module I had an experinece of working for 5 projects.
Also I have 1 EWM related project experience.
During the tenure of SAP I have been working for multiple Implementation, Roll out and Support projects.
A good team player, consultant and lead.
Experience
Professional experience10+ years
Languages
EnglishFluent
Project history
* Project#2 : NESTE OIL
* Client : Neste OIL Finland
* Organization : IBM India Private Limited
* Role : Advisory Consultant
* Duration : 27th June 2016 - 12th Feb 2019.
* Modules : SAP IS-OIL
* Contribution:
* Working in Supply Chain Management team (SCM),with exposure to IS-Oil sub modules like Hydro
carbon product management (HPM), Traders and schedulers workbench (TSW), Exchanges (EXG),
Marketing accounting and pricing (MAP), and Stock projection workbench (SPW) etc.
* Prepared Global design document for IS OIL functionalities in TSW area for Rail & Vessel
movements.
* Prepared Detailed design document for IS OIL functionalities in TSW area for Rail & Vessel
movements.
* Writing FS for SCM team WRICEF's.
* Integration with the technical team during build process.
* Creation of IS-Oil master data for testing like LOC ID, TS, Partners, Material master, Vendor
master, Customer master, TS to LOC ID assignment etc.
* Requirement gathering for replacement of Harbour extranet tool replacement with SAP and
development of forms like Vessel nomination for purchase, Sales, Out bound cargo notice,
Voyage orders etc.
* Writing the FS for HAT tool replacement with SAP and Interfacing between SAP and JAWA, YAWA
truck, HAT extranet portal etc.
* TSW Configuration for Junction functions to Various nomination movement scenario's like
Delivered purchase/Pick up purchase and Delivered sale/Pick up sales etc.
* Designing of Vessel Bunkering process.
* Creation of various event types for demurrage calculation.
* Creation of Various nominatios for different movement scenario and ticket actualization etc.
* Mapping SAP IS Oil Business process in SAP - Creation of Asset documents viz. Business
Process document, Scenario Position paper, Configuration Rationale, Configuration Design
Document, Test scripts, Simulations, Master Data Repository, Solution & process repository and
Training documents for TSW, TD, HPM.
* Interfacing with external TAS and TPI systems using ALE/EDI technology and IDocs.
* Reviewing test scripts as per the business scenarios, facilitating testing on all integration
points of MM with other modules like FI.
* SD Shipment, TD Shipment, Shipment Costs and Exchange Contracts.
* Preparation of test scripts using HP Quality Center.
* Interfaces- Supply contract tool updating.
* Drafting Organization Structure Manual, Business Process Blue Print (BPML), Key Data Structure
(KDS), Configuration Document and Functional Specification for ABAP development.
* Configuration of Plants, Storage location and ED (Excise duty tables) and Factory Calendar
etc.
* Handling Defect (creation, descoping and changes to Plants and Storage locations) and
QA to Defects.
* LES, Hypercare and GO-Live Support.
* Testing - UT, ITC1,ITC2, Regression, Retrofit and Performance testing
Scripting for UT.
* Providing new Plant code and descriptions to BAM.
* Training to new Team members.
* Monitoring all configurations done by SCM team before DE Audit.
* Monitoring of Project specific internal team security breaches.
* Client : Neste OIL Finland
* Organization : IBM India Private Limited
* Role : Advisory Consultant
* Duration : 27th June 2016 - 12th Feb 2019.
* Modules : SAP IS-OIL
* Contribution:
* Working in Supply Chain Management team (SCM),with exposure to IS-Oil sub modules like Hydro
carbon product management (HPM), Traders and schedulers workbench (TSW), Exchanges (EXG),
Marketing accounting and pricing (MAP), and Stock projection workbench (SPW) etc.
* Prepared Global design document for IS OIL functionalities in TSW area for Rail & Vessel
movements.
* Prepared Detailed design document for IS OIL functionalities in TSW area for Rail & Vessel
movements.
* Writing FS for SCM team WRICEF's.
* Integration with the technical team during build process.
* Creation of IS-Oil master data for testing like LOC ID, TS, Partners, Material master, Vendor
master, Customer master, TS to LOC ID assignment etc.
* Requirement gathering for replacement of Harbour extranet tool replacement with SAP and
development of forms like Vessel nomination for purchase, Sales, Out bound cargo notice,
Voyage orders etc.
* Writing the FS for HAT tool replacement with SAP and Interfacing between SAP and JAWA, YAWA
truck, HAT extranet portal etc.
* TSW Configuration for Junction functions to Various nomination movement scenario's like
Delivered purchase/Pick up purchase and Delivered sale/Pick up sales etc.
* Designing of Vessel Bunkering process.
* Creation of various event types for demurrage calculation.
* Creation of Various nominatios for different movement scenario and ticket actualization etc.
* Mapping SAP IS Oil Business process in SAP - Creation of Asset documents viz. Business
Process document, Scenario Position paper, Configuration Rationale, Configuration Design
Document, Test scripts, Simulations, Master Data Repository, Solution & process repository and
Training documents for TSW, TD, HPM.
* Interfacing with external TAS and TPI systems using ALE/EDI technology and IDocs.
* Reviewing test scripts as per the business scenarios, facilitating testing on all integration
points of MM with other modules like FI.
* SD Shipment, TD Shipment, Shipment Costs and Exchange Contracts.
* Preparation of test scripts using HP Quality Center.
* Interfaces- Supply contract tool updating.
* Drafting Organization Structure Manual, Business Process Blue Print (BPML), Key Data Structure
(KDS), Configuration Document and Functional Specification for ABAP development.
* Configuration of Plants, Storage location and ED (Excise duty tables) and Factory Calendar
etc.
* Handling Defect (creation, descoping and changes to Plants and Storage locations) and
QA to Defects.
* LES, Hypercare and GO-Live Support.
* Testing - UT, ITC1,ITC2, Regression, Retrofit and Performance testing
Scripting for UT.
* Providing new Plant code and descriptions to BAM.
* Training to new Team members.
* Monitoring all configurations done by SCM team before DE Audit.
* Monitoring of Project specific internal team security breaches.
* Modules : SAP MM / WM.
* Contribution: For Emami Cement Limited-Raipur.
* Preparation of User Requirement Specification Document.
* Preparation of BPML.
* Preparation of KDS.
* BPD/PDD Document Preparation.
* Configuration for MM.
* Unit testing, System Integration testing, UAT and preparation of test scripts.
* Core team member and end user training etc.
* Understanding the Current Business process of Emami.
* Support of Emami SAP system by handling issue resolution in SAP technical area, analyze root
cause and find out ways to correct the problem and implement the solution by necessary
correction if required.
* Understanding the Business process study and requirement collection.
* Business process study and requirement collection. Master Data collection and validation.
* Master data upload using LSMW.
* Material master and Vendor master creation and maintenance.
* Supporting day to day issues in MM.
* Associated from testing to go live phase.
* Unit testing and integration testing.
* Developed various report generation and testing of reports.
* CR and FS preparation for new developments like Shipment process in Logistics Execution.
Configuration, UT, UAT and preparation of documentation for Import of TR to production system.
* Handled developments like Pruchase requisition print, Purchase order print, RFQ print, GRN
print FORM, RGP, NRGP, Sub Con Challan, Gate module etc.
* Involved in Gate entry module for End to End implementation for FS writing, testing, and user
training etc.
* Configured Warehouse structures Definition and Assignment to Plant /Storage Location; WM
control parameters.
* WM with MM, SD,PM, QM and LE integration
* Configured Warehouse Layout Master Data : storage types, SU, storage sections, picking areas,
doors and storage bins, quants.
* Configured HU management with WM-SU, PP,SD, LE, PP and QM.
* Configured RF in GR SU/HU, Production Supply, Pick , Pack, Load, Ship and inventory.
* Configured Warehouse Movements: Transfer Requirements and Transfer Orders
* Configured Warehouse Management Strategies: Putaway, Stock Removal and Return Transfers.
* Configured Good Receives with LE/IM: Activities: Transfers, Confirmation and Print Control
* Good Issues with LE/IM: Activities: Transfers, Confirmation and Print Control
* Stock Replenishment: Internal Stock Transfer, Fixed bin Replenishment and Posting Changes.
* Hazardous Materials, Crossdocking etc.
* WM/SD integration (delivery creation, goods receive, production supply, pick, pack, load, ship
etc)
* Contribution: For Emami Cement Limited-Raipur.
* Preparation of User Requirement Specification Document.
* Preparation of BPML.
* Preparation of KDS.
* BPD/PDD Document Preparation.
* Configuration for MM.
* Unit testing, System Integration testing, UAT and preparation of test scripts.
* Core team member and end user training etc.
* Understanding the Current Business process of Emami.
* Support of Emami SAP system by handling issue resolution in SAP technical area, analyze root
cause and find out ways to correct the problem and implement the solution by necessary
correction if required.
* Understanding the Business process study and requirement collection.
* Business process study and requirement collection. Master Data collection and validation.
* Master data upload using LSMW.
* Material master and Vendor master creation and maintenance.
* Supporting day to day issues in MM.
* Associated from testing to go live phase.
* Unit testing and integration testing.
* Developed various report generation and testing of reports.
* CR and FS preparation for new developments like Shipment process in Logistics Execution.
Configuration, UT, UAT and preparation of documentation for Import of TR to production system.
* Handled developments like Pruchase requisition print, Purchase order print, RFQ print, GRN
print FORM, RGP, NRGP, Sub Con Challan, Gate module etc.
* Involved in Gate entry module for End to End implementation for FS writing, testing, and user
training etc.
* Configured Warehouse structures Definition and Assignment to Plant /Storage Location; WM
control parameters.
* WM with MM, SD,PM, QM and LE integration
* Configured Warehouse Layout Master Data : storage types, SU, storage sections, picking areas,
doors and storage bins, quants.
* Configured HU management with WM-SU, PP,SD, LE, PP and QM.
* Configured RF in GR SU/HU, Production Supply, Pick , Pack, Load, Ship and inventory.
* Configured Warehouse Movements: Transfer Requirements and Transfer Orders
* Configured Warehouse Management Strategies: Putaway, Stock Removal and Return Transfers.
* Configured Good Receives with LE/IM: Activities: Transfers, Confirmation and Print Control
* Good Issues with LE/IM: Activities: Transfers, Confirmation and Print Control
* Stock Replenishment: Internal Stock Transfer, Fixed bin Replenishment and Posting Changes.
* Hazardous Materials, Crossdocking etc.
* WM/SD integration (delivery creation, goods receive, production supply, pick, pack, load, ship
etc)