12/18/2022 updated


100 % available
SAP Production Planning Consultant
Dubai, United Arab Emirates
United Arab Emirates
B.Tech Mechanical EngineerAgile MethodologyLevellingCapacity PlanningDatabasesData ManagementPerseveranceSalesMaterial Requirements PlanningProcurement ManagementSAP ApplicationsSAP HANASupply Chain ManagementStrategic ThinkingSchedulingKanban
SAP Focus Areas:
- Organization Structures, Master Data, Configuration in the PP module.
- Master Data: -Routing, Work Centre, Bill of Material, Material master, Production Version
- Planning Levels: -Sales and Operation planning, Flexible planning, long term planning, Demand management, Material requirement planning.
- Demand Management: -Planning strategies, Requirement types, Availability check, Total Replenishment Lead time
- Material requirements planning: -MRP procedures, MRP types, MRP live, MRP control parameters, Procurement type, MRP evaluations.
- Scheduling: -Basic date scheduling, lead time scheduling, scheduling type (Backward, Forward, Current date scheduling), scheduling margin key.
- Capacity Planning: - Capacity evaluation, capacity leveling, capacity reduction
- Production Order-Production order creation, production Order release, Good Issue, Production order confirmation, good receipts, order settlement, technically complete production order.
- Batch Management: Manual and automatic creation of batch, batch numbering, batch classification, shelf life (SLED), batch determination.
- knowledge of SAP HANA data base
- PP Module integrated with the other SAP modules: CO, MM.
- Knowledge of different projects:
- Implementation Project
- Support Project
- Roll Out Projects
- Knowledge of implementing methodologies:
- ASAP Methodology
- Activate Methodology
- Kanban Methodology
- Agile Methodology
- Organization Structures, Master Data, Configuration in the PP module.
- Master Data: -Routing, Work Centre, Bill of Material, Material master, Production Version
- Planning Levels: -Sales and Operation planning, Flexible planning, long term planning, Demand management, Material requirement planning.
- Demand Management: -Planning strategies, Requirement types, Availability check, Total Replenishment Lead time
- Material requirements planning: -MRP procedures, MRP types, MRP live, MRP control parameters, Procurement type, MRP evaluations.
- Scheduling: -Basic date scheduling, lead time scheduling, scheduling type (Backward, Forward, Current date scheduling), scheduling margin key.
- Capacity Planning: - Capacity evaluation, capacity leveling, capacity reduction
- Production Order-Production order creation, production Order release, Good Issue, Production order confirmation, good receipts, order settlement, technically complete production order.
- Batch Management: Manual and automatic creation of batch, batch numbering, batch classification, shelf life (SLED), batch determination.
- knowledge of SAP HANA data base
- PP Module integrated with the other SAP modules: CO, MM.
- Knowledge of different projects:
- Implementation Project
- Support Project
- Roll Out Projects
- Knowledge of implementing methodologies:
- ASAP Methodology
- Activate Methodology
- Kanban Methodology
- Agile Methodology
Experience
Professional experience0 - 5 years
Languages
ArabicBasic knowledgeEnglishFluentHindiFluent
Project history
? Strong knowledge of MTO, MTS, Production Cycle, Material Requirement Planning.
? Configured Production Scheduling Profile, Order type parameter, Control key, Special Procurement key & MRP
Area.
? Configured Product groups, Material types, Bill of Material, various task list and Work centers.
? Configured background jobs for MRP run and Special procurement keys to take care of planning and production
issues.
? Dealt with mass changes of various material master's like Material master, BOM, Routing etc.
? Expertise in lot-sizing procedure, planning horizons and defined Schedule Margin key.
? Worked on planning strategies and configured scheduling parameters for both planned and production orders.
? Worked on Goods receipt, Goods issue and Confirmation activities, Movement types.
? Worked on availability check for the components by configuring checking control for different order types.
? Created and maintained characteristics & classes.
? Knowledge in Firming, Trigger point, Material staging, Milestone Confirmation, Long term planning, Capacity
requirement planning, capacity leveling, Consumption based planning, Batch Management and Batch
Determination.
? Strong knowledge in Discrete manufacturing, Repetitive manufacturing, and Kanban production system.
? Software used: SAP, Solid works, Microsoft word / Excel.
? Configured Production Scheduling Profile, Order type parameter, Control key, Special Procurement key & MRP
Area.
? Configured Product groups, Material types, Bill of Material, various task list and Work centers.
? Configured background jobs for MRP run and Special procurement keys to take care of planning and production
issues.
? Dealt with mass changes of various material master's like Material master, BOM, Routing etc.
? Expertise in lot-sizing procedure, planning horizons and defined Schedule Margin key.
? Worked on planning strategies and configured scheduling parameters for both planned and production orders.
? Worked on Goods receipt, Goods issue and Confirmation activities, Movement types.
? Worked on availability check for the components by configuring checking control for different order types.
? Created and maintained characteristics & classes.
? Knowledge in Firming, Trigger point, Material staging, Milestone Confirmation, Long term planning, Capacity
requirement planning, capacity leveling, Consumption based planning, Batch Management and Batch
Determination.
? Strong knowledge in Discrete manufacturing, Repetitive manufacturing, and Kanban production system.
? Software used: SAP, Solid works, Microsoft word / Excel.
? Responsible for commencing and designing of Hollow Metal doors and its components.
? Managing activities right from the conceptualization stage to the execution; involving finalization of technical
specifications, procurement, scheduling, progress monitoring.
? Responsible for preparation and finalization of cost estimation for quotations.
? Responsible for preparation of shop drawing and fabrication drawings.
? Responsible for preparation of Material submittals, MST, etc.
? Identifying works to be outsourced and planning the procurement of outsourced parts.
? Development of assembly equipment, fixtures & tools.
? Projecting requirements of Spare Parts, Raw Material and Consumables to Material Planning Department based on
Firm and Forecast Production Task.
? Managing activities right from the conceptualization stage to the execution; involving finalization of technical
specifications, procurement, scheduling, progress monitoring.
? Responsible for preparation and finalization of cost estimation for quotations.
? Responsible for preparation of shop drawing and fabrication drawings.
? Responsible for preparation of Material submittals, MST, etc.
? Identifying works to be outsourced and planning the procurement of outsourced parts.
? Development of assembly equipment, fixtures & tools.
? Projecting requirements of Spare Parts, Raw Material and Consumables to Material Planning Department based on
Firm and Forecast Production Task.
? Responsible for complete fabrication drawings of Pulse Jet Bag Filters.
? Capable of developing independently an installation layout.
? Preparing part drawing with bill of Quantity, to plan & purchase materials.
? To maintain data documents of design.
? Capable of developing independently an installation layout.
? Preparing part drawing with bill of Quantity, to plan & purchase materials.
? To maintain data documents of design.